[HISTORY: Adopted by the Board of Trustees of the Village
of Orchard Park 12-29-2008 by L.L. No. 1-2008. Amendments noted where
applicable.]
It is hereby determined that:
A.
Land development activities and associated increases in site impervious
cover often alter the hydrologic response of local watersheds and
increase stormwater runoff rates and volumes, flooding, stream channel
erosion, or sediment transport and deposition;
B.
This stormwater runoff contributes to increased quantities of waterborne
pollutants, including siltation of aquatic habitat for fish and other
desirable species;
C.
Clearing and grading during construction tends to increase soil erosion
and add to the loss of native vegetation necessary for terrestrial
and aquatic habitat;
D.
Improper design and construction of stormwater management practices
can increase the velocity of stormwater runoff, thereby increasing
streambank erosion and sedimentation;
E.
Impervious surfaces allow less water to percolate into the soil,
thereby decreasing groundwater recharge and stream baseflow;
F.
Substantial economic losses can result from these adverse impacts
on the waters of the municipality;
G.
Stormwater runoff, soil erosion and nonpoint source pollution can
be controlled and minimized through the regulation of stormwater runoff
from land development activities;
H.
The regulation of stormwater runoff discharges from land development
activities in order to control and minimize increases in stormwater
runoff rates and volumes, soil erosion, stream channel erosion, and
nonpoint source pollution associated with stormwater runoff is in
the public interest and will minimize threats to public health and
safety;
I.
Regulation of land development activities by means of performance
standards governing stormwater management and site design will produce
development compatible with the natural functions of a particular
site or an entire watershed and thereby mitigate the adverse effects
of erosion and sedimentation from development.
The purpose of this chapter, is to establish minimum stormwater management requirements and controls to protect and safeguard the general health, safety, and welfare of the public residing within this jurisdiction and to address the findings of fact in § 185-1 hereof. This chapter seeks to meet those purposes by achieving the following objectives:
A.
Meet the requirements of minimum measures 4 and 5 of the SPDES General
Permit for Stormwater Discharges from Municipal Separate Stormwater
Sewer Systems (MS4s), Permit No. GP-02-02, or as amended or revised;
B.
Require land development activities to conform to the substantive
requirements of the NYS Department of Environmental Conservation State
Pollutant Discharge Elimination System (SPDES) General Permit for
Construction Activities, GP-02-01, or as amended or revised;
C.
Minimize increases in stormwater runoff from land development activities
in order to reduce flooding, siltation, increases in stream temperature,
and streambank erosion and maintain the integrity of stream channels;
D.
Minimize increases in pollution caused by stormwater runoff from
land development activities which would otherwise degrade local water
quality;
E.
Minimize the total annual volume of stormwater runoff which flows
from any specific site during and following development to the maximum
extent practicable; and
F.
Reduce stormwater runoff rates and volumes, soil erosion and nonpoint
source pollution, wherever possible, through stormwater management
practices and to ensure that these management practices are properly
maintained and eliminate threats to public safety.
In accordance with § 10 of the Municipal Home Rule
Law of the State of New York, the Village of Orchard Park Village
Board has the authority to enact local laws and amend local laws and
for the purpose of promoting the health, safety or general welfare
of the Village of Orchard Park and for the protection and enhancement
of its physical environment.
B.
The municipality shall designate a Stormwater Management Officer
who shall accept and review all stormwater pollution prevention plans
and forward such plans to the applicable municipal board. The Stormwater
Management Officer may:
(1)
Review the plans;
(2)
Upon approval by the Village Board of the Village of Orchard Park,
engage the services of a registered professional engineer to review
the plans, specifications and related documents at a cost not to exceed
a fee schedule established by said governing board; or
(3)
Accept the certification of a licensed professional that the plans
conform to the requirements of this chapter.
C.
All land development activities subject to review and approval by
the Village Board of the Village of Orchard Park under subdivision,
site plan, and/or special exception regulations shall be reviewed
subject to the standards contained in this chapter.
The following activities may be exempt from review under this
chapter:
A.
Agricultural activity as defined in herein.
B.
Silvicultural activity, except that landing areas and log haul roads
are subject to this chapter.
C.
Routine maintenance activities that disturb less than five acres
and are performed to maintain the original line and grade, hydraulic
capacity or original purpose of a facility.
D.
Repairs to any stormwater management practice or facility deemed
necessary by the Stormwater Management Officer.
E.
Any part of a subdivision if a plat for the subdivision has been
approved by the Village of Orchard Park on or before the effective
date of this chapter.
F.
Land development activities for which a building permit has been
approved on or before the effective date of this chapter.
G.
Cemetery graves.
H.
Installation of fence, sign, telephone, and electric poles and other
kinds of posts or poles.
I.
Emergency activity immediately necessary to protect life, property
or natural resources.
J.
Activities of an individual engaging in home gardening by growing
flowers, vegetable and other plants primarily for use by that person
and his or her family.
K.
Landscaping and horticultural activities in connection with an existing
structure.
The terms used in this chapter or in documents prepared or reviewed
under this chapter shall have the meanings as set forth in this section:
The activity of an active farm, including grazing and watering
livestock, irrigating crops, harvesting crops, using land for growing
agricultural products, and cutting timber for sale, but shall not
include the operation of a dude ranch or similar operation, or the
construction of new structures associated with agricultural activities.
A property owner or agent of a property owner who has filed
an application for a land development activity.
Any structure, either temporary or permanent, having walls
and a roof, designed for the shelter of any person, animal, or property,
and occupying more than 100 square feet of area.
A natural or artificial watercourse with a definite bed and
banks that conducts continuously or periodically flowing water.
Any activity that removes the vegetative surface cover.
The deliberate appropriation of property by its owner for
general public use.
The New York State Department of Environmental Conservation.
The New York State Stormwater Management Design Manual, most
recent version, including applicable updates, that serves as the official
guide for stormwater management principles, methods and practices.
A person who undertakes land development activities.
The most recent version of the New York Standards and Specifications
for Erosion and Sediment Control Manual, commonly known as the "Blue
Book."
Excavation or fill of material, including the resulting conditions
thereof.
Those surfaces, improvements and structures that cannot effectively
infiltrate rainfall, snowmelt and water (e.g., building rooftops,
pavement, sidewalks, driveways, etc.).
A State Pollutant Discharge Elimination System permit issued
to a commercial industry or group of industries which regulates the
pollutant levels associated with industrial stormwater discharges
or specifies on-site pollution control strategies.
The process of percolating stormwater into the subsoil.
An area that is inundated or saturated by surface water or
groundwater at a frequency and duration sufficient to support a prevalence
of vegetation typically adapted for life in saturated soil conditions,
commonly known as "hydrophytic vegetation."
Construction activity, including clearing, grading, excavating,
soil disturbance or placement of fill that results in land disturbance
of equal to or greater than one acre, or activities disturbing less
than one acre of total land area that is part of a larger common plan
of development or sale, even though multiple separate and distinct
land development activities may take place at different times on different
schedules.
The legal or beneficial owner of land, including those holding
the right to purchase or lease the land, or any other person holding
proprietary rights in the land.
A legally recorded document that acts as a property deed
restriction, and which provides for long-term maintenance of stormwater
management practices.
Pollution from any source other than from any discernible,
confined, and discrete conveyances, and shall include but not be limited
to pollutants from agricultural, silvicultural, mining, construction,
subsurface disposal and urban runoff sources.
Clearing a parcel of land in distinct pieces or parts, with
the stabilization of each piece completed before the clearing of the
next.
Sediment or a water quality measurement that addresses sediment
(such as total suspended solids, turbidity or siltation) and any other
pollutant that has been identified as a cause of impairment of any
water body that will receive a discharge from the land development
activity.
Land development activity.
The replenishment of underground water reserves.
Measures that prevent eroded sediment from leaving the site.
Cold-water fisheries, shellfish beds, swimming beaches, groundwater
recharge areas, water supply reservoirs, and habitats for threatened,
endangered or special concern species.
A permit under the New York State Pollutant Discharge Elimination
System (SPDES) issued to developers of construction activities to
regulate disturbance of one or more acres of land.
A permit under the New York State Pollutant Discharge Elimination
System (SPDES) issued to municipalities to regulate discharges from
municipal separate storm sewers for compliance with EPA established
water quality standards and/or to specify stormwater control standards.
The use of practices that prevent exposed soil from eroding.
An order issued which requires that all construction activity
on a site be stopped.
Rainwater, surface runoff, snowmelt and drainage.
A land use or activity that generates higher concentrations
of hydrocarbons, trace metals or toxicants than are found in typical
stormwater runoff, based on monitoring studies.
The use of structural or nonstructural practices that are
designed to reduce stormwater runoff and mitigate its adverse impacts
on property, natural resources and the environment.
One or a series of stormwater management practices installed,
stabilized and operating for the purpose of controlling stormwater
runoff.
The Village Engineer is designated.
Measures, either structural or nonstructural, that are determined
to be the most effective, practical means of preventing flood damage
and preventing or reducing point source or nonpoint source pollution
inputs to stormwater runoff and water bodies.
A plan for controlling stormwater runoff and pollutants from
a site during and after construction activities.
Flow on the surface of the ground resulting from precipitation.
Lakes, bays, sounds, ponds, impounding reservoirs, springs,
wells, rivers, streams, creeks, estuaries, marshes, inlets, canals,
the Atlantic Ocean within the territorial seas of the State of New
York and all other bodies of surface water, natural or artificial,
inland or coastal, fresh or salt, public or private (except those
private waters that do not combine or effect a junction with natural
surface or underground waters), which are wholly or partially within
or bordering the state or within its jurisdiction. Storm sewers and
waste treatment systems, including treatment ponds or lagoons which
also meet the criteria of this definition, are not waters of the state.
This exclusion applies only to man-made bodies of water which neither
were originally created in waters of the state (such as a disposal
area in wetlands) nor resulted from impoundment of waters of the state.
A permanent or intermittent stream or other body of water,
either natural or man-made, which gathers or carries surface water.
A channel that directs surface runoff to a watercourse or
to the public storm drain.
A.
Stormwater pollution prevention plan requirement.
(1)
No application for approval of a land development activity shall
be reviewed until the appropriate board has received a stormwater
pollution prevention plan (SWPPP) prepared in accordance with the
specifications in this chapter.
B.
Contents of stormwater pollution prevention plans.
(1)
All SWPPPs shall provide the following background information and
erosion and sediment controls:
(a)
Background information about the scope of the project, including
location, type and size of project;
(b)
Site map/construction drawing(s) for the project, including
a general location map. The site map shall be at a scale no smaller
than one inch equals 100 feet. At a minimum, the site map should show
the total site area; all improvements; areas of disturbance; areas
that will not be disturbed; existing vegetation; on-site and adjacent
off-site surface water(s); wetlands and drainage patterns that could
be affected by the construction activity; existing and final slopes;
locations of off-site material, waste, borrow or equipment storage
areas; and location(s) of the stormwater discharges(s);
(c)
Description of the soil(s) present at the site;
(d)
Construction phasing plan describing the intended sequence of
construction activities, including clearing and grubbing, excavation
and grading, utility and infrastructure installation and any other
activity at the site that results in soil disturbance. Consistent
with the New York Standards and Specifications for Erosion and Sediment
Control (Erosion Control Manual), not more than five acres shall be
disturbed at any one time unless pursuant to an approved SWPPP;
(e)
Description of the pollution prevention measures that will be
used to control litter, construction chemicals and construction debris
from becoming a pollutant source in stormwater runoff;
(f)
Description of construction and waste materials expected to
be stored on site with updates as appropriate, and a description of
controls to reduce pollutants from these materials, including storage
practices to minimize exposure of the materials to stormwater, and
spill prevention and response;
(g)
Temporary and permanent structural and vegetative measures to
be used for soil stabilization, runoff control and sediment control
for each stage of the project, from initial land clearing and grubbing
to project close-out;
(h)
A site map/construction drawing(s) specifying the location(s),
size(s) and length(s) of each erosion and sediment control practice;
(i)
Dimensions, material specifications and installation details
for all erosion and sediment control practices, including the siting
and sizing of any temporary sediment basins;
(j)
Temporary practices that will be converted to permanent control
measures;
(k)
Implementation schedule for staging temporary erosion and sediment
control practices, including the timing of initial placement and duration
that each practice should remain in place;
(l)
Maintenance schedule to ensure continuous and effective operation
of the erosion and sediment control practice;
(m)
Name(s) of the receiving water(s);
(n)
Delineation of SWPPP implementation responsibilities for each
part of the site;
(o)
Description of structural practices designed to divert flows
from exposed soils, store flows, or otherwise limit runoff and the
discharge of pollutants from exposed areas of the site to the degree
attainable; and
(p)
Any existing data that describes the stormwater runoff at the
site.
(2)
Land development activities as defined herein and meeting Condition A, B or C below shall also include water quantity and water quality controls (postconstruction stormwater runoff controls) as set forth in Subsection B(3) below as applicable:
(a)
Condition A. Stormwater runoff from land development activities
discharging a pollutant of concern to either an impaired water identified
on the Department's 303(d) list of impaired waters or a total
maximum daily load (TMDL) designated watershed for which pollutants
in stormwater have been identified as a source of the impairment.
(b)
Condition B. Stormwater runoff from land development activities
disturbing five or more acres.
(c)
Condition C. Stormwater runoff from land development activity
disturbing between one and five acres of land during the course of
the project, exclusive of the construction of single-family residences
and construction activities at agricultural properties.
(3)
SWPPP requirements for Conditions A, B and C:
(a)
All information in § 185-7(B)(1) above;
(b)
Description of each postconstruction stormwater management practice;
(c)
Site map/construction drawing(s) showing the specific location(s)
and size(s) of each postconstruction stormwater management practice;
(d)
Hydrologic and hydraulic analysis for all structural components
of the stormwater management system for the applicable design storms;
(e)
Comparison of postdevelopment stormwater runoff conditions with
predevelopment conditions;
(f)
Dimensions, material specifications and installation details
for each postconstruction stormwater management practice;
(g)
Maintenance schedule to ensure continuous and effective operation
of each postconstruction stormwater management practice;
(h)
Maintenance easements to ensure access to all stormwater management
practices at the site for the purpose of inspection and repair. Easements
shall be recorded on the plan and shall remain in effect with transfer
of title to the property;
(i)
Inspection and maintenance agreement binding on all subsequent landowners served by the on-site stormwater management measures in accordance with § 185-9 of this article;
(j)
For Condition A, the SWPPP shall be prepared by a landscape
architect, certified professional or professional engineer and must
be signed by the professional preparing the plan, who shall certify
that the design of all stormwater management practices meets the requirements
of this chapter.
C.
Other environmental permits. The applicant shall assure that all
other applicable environmental permits have been or will be acquired
for the land development activity prior to approval of the final stormwater
design plan.
D.
Contractor certification.
(1)
Each contractor and subcontractor identified in the SWPPP who will
be involved in soil disturbance and/or stormwater management practice
installation shall sign and date a copy of the following certification
statement before undertaking any land development activity: "I certify
under penalty of law that I understand and agree to comply with the
terms and conditions of the Stormwater Pollution Prevention Plan.
I also understand that it is unlawful for any person to cause or contribute
to a violation of water quality standards."
(2)
The certification must include the name and title of the person providing
the signature, address and telephone number of the contracting firm;
the address (or other identifying description) of the site; and the
date the certification is made.
(3)
The certification statement(s) shall become part of the SWPPP for
the land development activity.
E.
A copy of the SWPPP shall be retained at the site of the land development
activity during construction from the date of initiation of construction
activities to the date of final stabilization.
All land development activities shall be subject to the following
performance and design criteria:
A.
Technical
standards. For the purpose of this chapter, the following documents
shall serve as the official guides and specifications for stormwater
management. Stormwater management practices that are designed and
constructed in accordance with these technical documents shall be
presumed to meet the standards imposed by this chapter:
(1)
The
New York State Stormwater Management Design Manual (New York State
Department of Environmental Conservation, most current version or
its successor, hereafter referred to as the "Design Manual");
(2)
New
York Standards and Specifications for Erosion and Sediment Control
(Empire State Chapter of the Soil and Water Conservation Society,
2004, most current version or its successor, hereafter referred to
as the "Erosion Control Manual").
B.
Equivalence to technical standards. Where stormwater management practices are not in accordance with technical standards, the applicant or developer must demonstrate equivalence to the technical standards set forth in Subsection A and the SWPPP shall be prepared by a licensed professional.
C.
Water quality
standards. Any land development activity shall not cause an increase
in turbidity that will result in substantial visible contrast to natural
conditions in surface waters of the State of New York.
A.
Maintenance
and inspection during construction.
(1)
The
applicant or developer of the land development activity or their representative
shall at all times properly operate and maintain all facilities and
systems of treatment and control (and related appurtenances) which
are installed or used by the applicant or developer to achieve compliance
with the conditions of this chapter. Sediment shall be removed from
sediment traps or sediment ponds whenever their design capacity has
been reduced by 50%.
(2)
For land development activities as defined in § 185-6 of this chapter and meeting Condition A, B or C in § 185-7B(2), the applicant shall have a qualified professional conduct site inspections and document the effectiveness of all erosion and sediment control practices every seven days and within 24 hours of any storm event producing 0.5 inch of precipitation or more. Inspection reports shall be maintained in a site logbook.
(3)
The
applicant or developer or his or her representative shall be on site
at all times when construction or grading activity takes place and
shall inspect and document the effectiveness of all erosion and sediment
control practices.
B.
Maintenance
easement(s). Prior to the issuance of any approval that has a stormwater
management facility as one of the requirements, the applicant or developer
must execute a maintenance easement agreement that shall be binding
on all subsequent landowners served by the stormwater management facility.
The easement shall provide for access to the facility at reasonable
times for periodic inspection by the Village of Orchard Park to ensure
that the facility is maintained in proper working condition to meet
design standards and any other provisions established by this chapter.
The easement shall be recorded by the grantor in the office of the
County Clerk after approval by the Counsel for the Village of Orchard
Park.
C.
Maintenance
after construction.
(1)
The
owner or operator of permanent stormwater management practices installed
in accordance with this chapter shall ensure they are operated and
maintained to achieve the goals of this chapter. Proper operation
and maintenance also includes, as a minimum, the following:
(a)
A preventive/corrective maintenance program for all critical facilities
and systems of treatment and control (or related appurtenances) which
are installed or used by the owner or operator to achieve the goals
of this chapter.
(b)
Written procedures for operation and maintenance and training new
maintenance personnel.
(2)
Maintenance
agreements. The Village of Orchard Park shall approve a formal maintenance
agreement for stormwater management facilities binding on all subsequent
landowners and recorded in the office of the County Clerk as a deed
restriction on the property prior to final plan approval. The maintenance
agreement shall be consistent with the terms and conditions of Schedule
B of this chapter, entitled "Sample Stormwater Control Facility Maintenance
Agreement."[1]The Village of Orchard Park, in lieu of a maintenance agreement,
at its sole discretion, may accept dedication of any existing or future
stormwater management facility, provided such facility meets all the
requirements of this chapter and includes adequate and perpetual access
and sufficient area, by easement or otherwise, for inspection and
regular maintenance.
[1]
Editor's Note: Schedule B is on file in the Village offices.
A.
Erosion and sediment control inspection.
(1)
The Village of Orchard Park Stormwater Management Officer may require
such inspections as necessary to determine compliance with this chapter
and may either approve that portion of the work completed or notify
the applicant wherein the work fails to comply with the requirements
of this chapter and the stormwater pollution prevention plan (SWPPP)
as approved. To obtain inspections, the applicant shall notify the
Village of Orchard Park enforcement official at least 48 hours before
any of the following as required by the Stormwater Management Officer:
(a)
Start of construction.
(b)
Installation of sediment and erosion control measures.
(c)
Completion of site clearing.
(d)
Completion of rough grading.
(e)
Completion of final grading.
(f)
Close of the construction season.
(g)
Completion of final landscaping.
(h)
Successful establishment of landscaping in public areas.
(2)
If any violations are found, the applicant and developer shall be
notified, in writing, of the nature of the violation and the required
corrective actions. No further work shall be conducted except for
site stabilization until any violations are corrected and all work
previously completed has received approval by the Stormwater Management
Officer.
B.
Stormwater management practice inspections. The Village of Orchard
Park Stormwater Management Officer is responsible for conducting inspections
of stormwater management practices (SMPs). All applicants are required
to submit as-built plans for any stormwater management practices located
on site after final construction is completed. The plan must show
the final design specifications for all stormwater management facilities
and must be certified by a professional engineer.
C.
Inspection of stormwater facilities after project completion. Inspection
programs shall be established on any reasonable basis, including but
not limited to routine inspections; random inspections; inspections
based upon complaints or other notice of possible violations; inspection
of drainage basins or areas identified as higher-than-typical sources
of sediment or other contaminants or pollutants; inspections of businesses
or industries of a type associated with higher-than-usual discharges
of contaminants or pollutants or with discharges of a type which are
more likely than the typical discharge to cause violations of state
or federal water or sediment quality standards or the SPDES stormwater
permit; and joint inspections with other agencies inspecting under
environmental or safety laws. Inspections may include but are not
limited to reviewing maintenance and repair records; sampling discharges,
surface water, groundwater, and material or water in drainage control
facilities; and evaluating the condition of drainage control facilities
and other stormwater management practices.
D.
Submission of reports. The Village of Orchard Park Stormwater Management
Officer may require monitoring and reporting from entities subject
to this chapter, as are necessary to determine compliance with this
chapter.
E.
Right-of-entry for inspection. When any new stormwater management facility is installed on private property or when any new connection is made between private property and the public stormwater system, the landowner shall grant to the Village of Orchard Park the right to enter the property at reasonable times and in a reasonable manner for the purpose of inspection as specified in Subsection C.
A.
Construction completion guarantee. In order to ensure the full and
faithful completion of all land development activities related to
compliance with all conditions set forth by the Village of Orchard
Park in its approval of the stormwater pollution prevention plan,
the Village of Orchard Park may require the applicant or developer
to provide, prior to construction, a performance bond, cash escrow,
or irrevocable letter of credit from an appropriate financial or surety
institution which guarantees satisfactory completion of the project
and names the Village of Orchard Park as the beneficiary. The security
shall be in an amount to be determined by the Village of Orchard Park
based on submission of final design plans, with reference to actual
construction and landscaping costs. The performance guarantee shall
remain in force until the surety is released from liability by the
Village of Orchard Park, provided that such period shall not be less
than one year from the date of final acceptance or such other certification
that the facility(ies) have been constructed in accordance with the
approved plans and specifications and that a one-year inspection has
been conducted and the facilities have been found to be acceptable
to the Village of Orchard Park. Per annum interest on cash escrow
deposits shall be reinvested in the account until the surety is released
from liability.
B.
Maintenance guarantee. Where stormwater management and erosion and
sediment control facilities are to be operated and maintained by the
developer or by a corporation that owns or manages a commercial or
industrial facility, the developer, prior to construction, may be
required to provide the Village of Orchard Park with an irrevocable
letter of credit from an approved financial institution or surety
to ensure proper operation and maintenance of all stormwater management
and erosion control facilities both during and after construction
and until the facilities are removed from operation. If the developer
or landowner fails to properly operate and maintain stormwater management
and erosion and sediment control facilities, the Village of Orchard
Park may draw upon the account to cover the costs of proper operation
and maintenance, including engineering and inspection costs.
C.
Recordkeeping. The Village of Orchard Park may require entities subject
to this chapter to maintain records demonstrating compliance with
this chapter.
A.
Notice of violation. When the Village of Orchard Park determines
that a land development activity is not being carried out in accordance
with the requirements of this chapter, it may issue a written notice
of violation to the landowner. The notice of violation shall contain:
(1)
The name and address of the landowner, developer or applicant;
(2)
The address, when available, or a description of the building, structure
or land upon which the violation is occurring;
(3)
A statement specifying the nature of the violation;
(4)
A description of the remedial measures necessary to bring the land
development activity into compliance with this chapter, and a time
schedule for the completion of such remedial action;
(5)
A statement of the penalty or penalties that shall or may be assessed
against the person to whom the notice of violation is directed;
(6)
A statement that the determination of violation may be appealed to
the municipality by filing a written notice of appeal within 15 days
of service of notice of violation.
B.
Stop-work orders. The Village of Orchard Park may issue a stop-work
order for violations of this chapter. Persons receiving a stop-work
order shall be required to halt all land development activities, except
those activities that address the violations leading to the stop-work
order. The stop-work order shall be in effect until the Village of
Orchard Park confirms that the land development activity is in compliance
and the violation has been satisfactorily addressed. Failure to address
a stop-work order in a timely manner may result in civil, criminal,
or monetary penalties in accordance with the enforcement measures
authorized in this chapter.
C.
Violations. Any land development activity that is commenced or is
conducted contrary to this chapter may be restrained by injunction
or otherwise abated in a manner provided by law.
D.
Penalties. In addition to or as an alternative to any penalty provided
herein or by law, any person who violates the provisions of this chapter
shall be guilty of a violation punishable by a fine not exceeding
$350 or imprisonment for a period not to exceed six months, or both
for conviction of a first offense; for conviction of a second offense,
both of which were committed within a period of five years, punishable
by a fine not less than $350 nor more than $700 or imprisonment for
a period not to exceed six months, or both; and upon conviction for
a third or subsequent offense, all of which were committed within
a period of five years, punishable by a fine not less than $700 nor
more than $1,000 or imprisonment for a period not to exceed six months,
or both. However, for the purposes of conferring jurisdiction upon
courts and judicial officers generally, violations of this chapter
shall be deemed misdemeanors and, for such purpose only, all provisions
of law relating to misdemeanors shall apply to such violations. Each
week's continued violation shall constitute a separate additional
violation.
E.
Withholding of certificate of occupancy. If any building or land
development activity is installed or conducted in violation of this
chapter, the Stormwater Management Officer may prevent the occupancy
of said building or land.
F.
Restoration of lands. Any violator may be required to restore land
to its undisturbed condition. In the event that restoration is not
undertaken within a reasonable time after notice, the Village of Orchard
Park may take necessary corrective action, the cost of which shall
become a lien upon the property until paid.
The Village of Orchard Park may require any person undertaking
land development activities regulated by this chapter to pay reasonable
costs at prevailing rates for review of SWPPPs, inspections, or SMP
maintenance performed by the Village of Orchard Park or performed
by a third party for the Village of Orchard Park.
[1]
Editor’s Note: Local Law No. 3-2010, adopted 3-26-2010,
created a fee to pay for stormwater management costs generated by
stormwater management obligations mandated to the Village by the State
of New York. This local law provided that the fee be spread as a separate
line item on the annual Village tax bill and that the fee be levied,
at the discretion of the Village Board, annually on a flat-fee-per-tax-bill
basis or by some rational formula related to the cost of complying
with New York State stormwater management obligations.