Whenever any new structure that requires a footing, including
one- and two-family dwellings, is being erected or demolished, temporary
chain link fencing at least six feet high shall be erected. This fencing
shall completely enclose or contain the construction/demolition project.
This provision shall also include any excavation greater than 24 inches
in depth. The type of fencing shall be subject to the approval of
the Construction Official. Failure to erect or maintain fencing in
accordance with this section shall be deemed a violation of the demolition
or construction permit issued. No fencing shall be removed from the
premises except upon the approval of the Construction Code Official
or Municipal Engineer.