[Adopted 4-5-2010 by Ord. No. 2010-5]
Computation of charges for the costs incurred by the Borough for removal and remediation of snow and ice on sidewalks pursuant to § 177-3 of this Code shall be based on the following rates:
A. 
Equipment hourly rates, including the time required to mobilize and demobilize from the site, subject to a one-hour minimum shall be as follows:
[Amended 8-6-2012 by Ord. No. 2012-9]
(1) 
Snowblower: $25.
(2) 
Service truck: $75.
(3) 
Dump truck: $100.
(4) 
Deicer: cost plus 15%.
B. 
Labor hourly rates, including the time required to mobilize and demobilize from the site, subject to a one-hour minimum, shall be as follows:
[Amended 8-6-2012 by Ord. No. 2012-9]
(1) 
Foreman: $85.
(2) 
Operator: $75.
(3) 
Laborer: $65.
C. 
For overtime (OT), a multiplier will be applied to labor rates equal to the highest applicable multiplier from the following:
(1) 
Work before 7:30 a.m.: 1.5.
(2) 
Work after 3:30 p.m.: 1.5.
(3) 
Work on Saturday: 1.5.
(4) 
Work on Sunday: 2.0.
(5) 
Work on Borough-recognized holidays: 2.0.
(6) 
Continuous work in excess of 12 hours.
[Amended 11-7-2011 by Ord. No. 2011-14; 10-1-2012 by Ord. No. 2012-11]
Fees pursuant to Chapter 177, Streets and Sidewalks, Article II, Openings and Excavations, shall be as follows: $100 for each permit or $500 for a blanket permit issued to a public utility valid for all or the remainder of the calendar year in which it is issued.
[1]
Editor's Note: Former § 98-38, Storage fees, was repealed 11-7-2011 by Ord. No. 2011-14.