Subdivision of land — See Ch. 475.
Vehicles and traffic — See Ch. 505.
The City adopts the edition of the Harford County Road Code,
its appendices and supplements as enforced by Harford County government,
except as modified herein.
Whenever Harford County or the county is referred to in the
code, it shall be deemed to mean the City of Aberdeen.
The City may employ inspectors for the purpose of enforcing
the code or may designate such other person, firm, corporation, municipality
or county to perform such inspections.
The City may employ the services of a materials testing laboratory
for the purpose of enforcing the code or may designate such other
person, firm, corporation, municipality or county to perform such
materials testing.
Road paving for residential and townhouse roads as outlined
on Plate R-1, issued October 1987, is modified to a fourteen-inch
section with a ten-inch graded aggregate base course placed in two
five-inch layers over compacted subgrade. Bituminous concrete base
pavement shall consist of 2 1/2 inches of bituminous concrete
B and B1 or BF. Finished bituminous concrete surface pavement, B and
SF, shall be placed to a compacted depth of 1 1/2 inches over
the base pavement. A tack coat is required between the base and finished
pavement courses.
Road paving for business, commercial and industrial roads shall
be a fifteen-inch section with ten-inch graded aggregate base course
placed in two five-inch layers over a compacted subgrade. Bituminous
concrete base pavement shall consist of three inches of bituminous
concrete B and B1 or BF. Finished bituminous concrete surface pavement,
B and SC, shall be placed to a compacted depth of two inches over
the tack-coated base pavement.