Upon presentation of proper credentials, duly authorized representatives
of the municipality may enter, at reasonable times, upon any property
within the municipality to inspect the condition of the stormwater
structures and facilities in regard to any aspect regulated by this
chapter.
The municipal governing body is hereby authorized and directed
to enforce all of the provisions of this chapter. All inspections
regarding compliance with the stormwater management plan shall be
the responsibility of the Municipal Engineer or other qualified persons
designated by the municipality.
A. A set of design plans approved by the municipality shall be on file
at the site throughout the duration of the construction activity.
Periodic inspections may be made by the municipality or designee during
construction.
B. Adherence to approved plan. It shall be unlawful for any person, firm or corporation to undertake any regulated activity under §
490-5 on any property except as provided for in the approved stormwater management plan and pursuant to the requirements of this chapter. It shall be unlawful to alter or remove any control structure required by the stormwater management plan pursuant to this chapter or to allow the property to remain in a condition which does not conform to the approved stormwater management plan.
C. At the completion of the project, and as a prerequisite for the release
of the performance guarantee, the owner or his representatives shall:
(1) Provide a certification of completion from an engineer, architect,
surveyor or other qualified person verifying that all permanent facilities
have been constructed according to the plans and specifications and
approved revisions thereto.
(2) Provide a set of as-built drawings.
D. After receipt of the certification by the municipality, a final inspection
shall be conducted by the governing body or its designee to certify
compliance with this chapter.
E. Occupancy permit. An occupancy permit shall not be issued until all
stormwater issues have been addressed to the municipality's satisfaction.
The occupancy permit shall be required for each lot owner and/or developer
for all subdivisions and land development in the municipality.