A. 
Excavation. The excavation or rough grading for driveways and parking areas shall be fine graded and shaped correctly to the proper cross section.
B. 
Grading. The subgrade shall be brought to a firm unyielding surface by rolling the entire area with a power roller weighing not less than 10 tons. Rolling shall be done from the sides to the center for the full distance of that portion to be paved and shall be continued until the subgrade is thoroughly compacted. Solid rock, boulders, soft clay, loose, flaky or spongy material which will not consolidate under the roller shall be removed from the subgrade. The space shall be filled with clean, dry dirt, or other suitable material, and the subgrade rerolled until it presents a smooth, even surface of proper shape and cross section.
A. 
General. After the subgrade has been properly prepared and compacted, there shall be constructed a two-course crushed stone base course having a total depth of eight inches after compaction. No subbase is required if a crushed stone base course is used.
B. 
Materials.
(1) 
The course material shall be Type A or better, stone or slag, meeting the requirements for No. 1 aggregate and shall be uniform in quality, graded and of such size as to conform with Table C, Size and Grading Requirements for Course Aggregate, Section 703.2 of Form 408, or the equivalent section in any revision of Form 408.
(2) 
The fine material shall be Type A or better, stone or slag, meeting the requirements for No. 10 aggregate and shall be uniform in quality, graded and of such size as to conform with Table C, Size and Grading Requirements for Course Aggregate, Section 703.2 of Form 408, or the equivalent section in any revision of Form 408.
C. 
Placement.
(1) 
The crushed stone base course shall be constructed of two layers with the bottom layer having a compacted depth of five inches. The course material shall be spread uniformly by approved mechanical stone spreaders to the full width of the road.
(2) 
Spreaders shall be adjusted to spread the loose material to obtain a layer of the required depth after compaction. The course material shall not be spread for a distance of more than an average day's work ahead of choking and compacting. The course material shall be rolled and thoroughly compacted with an approved three-wheel roller. The rolling shall begin at the sides and progress to the center uniformly lapping each preceding track and continuing until the material does not creep or wave ahead of the roller wheels.
(3) 
After the course material has been satisfactorily rolled and compacted, fine material shall be uniformly spread over the surface with approved mechanical equipment. The fine material shall be broomed and rolled until the voids in the course material are completely filled and the base course is thoroughly compacted and firmly set.
A. 
General. After the subbase has been properly prepared and compacted to a depth of three inches, there shall be constructed a two-course Superpave 25.0 mm base course having a total depth of 5 1/2 inches after compaction.
B. 
Materials.
(1) 
The bituminous material shall be per Section 309 of the Pennsylvania Department of Transportation Form 408.
(2) 
The fine aggregate for bituminous mixtures shall be reasonably uniform in its physical properties and shall meet the grading and quality requirements specified in the current Pennsylvania Department of Transportation, Form 408. The material shall be natural sand and/or stone sand, composed of hard, tough, durable, uncoated particles, free from clay, silt, vegetation or other substances determined to be deleterious.
(3) 
The course aggregate shall be Type A stone, gravel or slag reasonably uniform in its physical properties and shall meet the requirements for No. 1B and No. 2B material specified in the current Pennsylvania Department of Transportation Form 408. The material shall be composed of hard, tough, durable, uncoated particles, free from harmful amounts of clay, silt, vegetation or other substances determined to be deleterious.
C. 
Composition. The aggregate and bitumen meeting the requirements herein specified shall be combined in such proportions that the total aggregate and the bitumen in the base course will conform to the compositions by weight percentages as specified by the Engineer.
D. 
Placement.
(1) 
Superpave 25.0 mm base course shall not be placed on wet surfaces nor when the air temperature is 35° or lower, nor when the temperature of the subbase is 35° or lower. The base course material shall be hauled to the site in tight vehicles with approved covers of sufficient size and quality to protect the entire load and to ensure that the mixture is delivered at the correct laying temperature, free from lumps of chilled material.
(2) 
The base course shall be constructed of two layers with the bottom layer having a compacted depth of three inches. The mixture shall be spread or struck off by mechanical spreading and finishing equipment for the entire width or for such partial-width lanes as may be practical. The screed assembly shall be adjustable to give the cross section required and shall be designed and operated to provide the required depth.
(3) 
Immediately after the bituminous mixture has been spread, struck off and surface irregularities adjusted, it shall be thoroughly and uniformly compacted by rolling. The rollers shall be normally operated so that the breakdown rolling is performed with a three-wheel or tandem roller. The rolling shall start longitudinally at the sides and gradually progress toward the center of the road, overlapping on successive trips by at least 1/2 the width of the roller. Rolling shall be continued until the rolling does not cause undue displacement, cracking or shoving. The wheels of steel-wheel rollers shall be kept moist and clean to prevent adhesion of the fresh material, but an excess of water will not be permitted.
(4) 
Any mixture that becomes loose and broken, mixed with dirt, or is in any way defective, shall be removed and replaced with fresh hot mixture, which shall be compacted to conform with the surrounding area.
A. 
General. After the subgrade has been properly prepared and compacted there shall be constructed a two-course crushed stone base course having a total depth of eight inches after compaction. No subbase is required if a crushed stone base course is used.
B. 
Material.
(1) 
The course material shall be Type A or better, stone or slag, meeting the requirements for No. 1 aggregate and shall be uniform in quality, graded and of such size as to conform with Table C, Size and Grading Requirements for Course Aggregate, Section 703.2 of Form 408, or the equivalent section in any revision of Form 408.
(2) 
The fine material shall be Type A or better, stone or slag, meeting the requirements for No. 10 aggregate and shall be uniform in quality, graded and of such size as to conform with Table C, Size and Grading Requirements for Course Aggregate, Section 703.2 of Form 408, or the equivalent section in any revision of Form 408.
C. 
Placement.
(1) 
The crushed stone base course shall be constructed of two layers with the bottom layer having a compacted depth of five inches. The course material shall be spread uniformly by approved mechanical stone spreaders to the full width of the road.
(2) 
Spreaders shall be adjusted to spread the loose material to obtain a layer of the required depth after compaction. The course material shall not be spread for a distance of more than an average day's work ahead of choking and compacting. The course material shall be rolled and thoroughly compacted with an approved three-wheel roller. The rolling shall begin at the sides and progress to the center uniformly lapping each preceding track and continuing until the material does not creep or wave ahead of the roller wheels.
(3) 
After the course material has been satisfactorily rolled and compacted, fine material shall be uniformly spread over the surface with approved mechanical equipment. The fine material shall be broomed and rolled until the voids in the course material are completely filled and the base course is thoroughly compacted and firmly set.