[Ord. No. 4, 2-3-2021]
The size of pits shall be shown on plans. Pits may be dug by
any method. Where pits are dug with an auger and the side of the pits
become plastered or glazed, this plastered or glazed surface shall
be scarified.
[Ord. No. 4, 2-3-2021]
During distribution to the planting pits or while awaiting planting
after distribution, the roots of all bare-root plants shall be kept
covered at all times with moist burlap or other approved material.
During the planting of forest tree seedlings and forest tree transplants,
such material shall be carried in a pail or bucket filled with sufficient
mud to puddle the roots. When seedling roots have been coated with
a protective material, the seedlings shall be protected in accordance
with U.S. Forest Service recommendations relative to the treatment
of roots while the plants are being planted.
[Ord. No. 4, 2-3-2021]
The application of fertilizer shall be in accordance with the
method shown on the plans.
[Ord. No. 4, 2-3-2021]
All plant material shall be mulched within 48 hours after installation.
Mulch shall completely cover the entire area of the plant pit or plant
bed and shall be spread uniformly. The method of application, the
depth, and the material used for mulching shall be as shown on the
plans.
[Ord. No. 4, 2-3-2021]
Each tree shall be staked or guyed immediately following its
planting.