The developer shall provide and file with the Borough Engineer
one complete set of as-built improvement plans and profiles showing
actual construction as approved prior to release of performance guarantees
on a major subdivision.
[Amended 12-19-1991 by Ord. No. 317-91]
All improvements (except electric and gas) shall be installed
under the supervision and inspection of the Borough Engineer, the
cost thereof to be borne by the developer. Inspection costs shall
be computed at 5% of the total cost of the improvement by the Borough
Engineer, and such amount, in the form of cash or certified check,
shall be deposited with the Borough Clerk before commencement of any
construction. If construction is commenced prior to tentative or final
subdivision approval, the developer shall likewise deposit a sum in
the amount estimated by the Borough Engineer to be credited toward
said five-percent inspection charge. No refund of the inspection deposit
shall be made.
No construction work shall commence without the Borough Engineer
being properly notified. Such notice shall be given at least 72 hours
before commencement of work.
The Planning Board, when reviewing applications for approval
of subdivision plats, shall have the power to grant, to the same extent
and subject to the same restrictions as a board of adjustment, variances
in accordance with the terms of this chapter.