[HISTORY: Adopted by the Town Board of the Town of Hartland 5-8-1997. Amendments
noted where applicable.]
[Amended 8-8-2002]
The following fees are hereby established for the respective
permits/services set forth opposite as follows:
A.Â
Fees for permits shall be based on the estimated cost of construction
(as calculated from the schedule below) or as otherwise shown below.
A building permit shall be required for any building with greater
than 144 square feet of floor area.
B.Â
The following fees shall be applicable:
Calculated Cost of Construction
|
Fee
|
---|---|
Up to $3,000
|
$25
|
$3,001 to $25,000
|
$25 for the first $3,000, plus $2.50 for each additional $1,000
or fraction thereof, to and including $25,000
|
$25,001 to $50,000
|
$80 for the first $25,000, plus $2 for each additional $1,000
or fraction thereof, to and including $50,000
|
$50,001 to $100,000
|
$130 for the first $50,000, plus $1.50 for each additional $1,000
or fraction thereof, to and including $100,000
|
$100,001 and over
|
$205 for the first $100,000, plus $1 for each additional $1,000
or fraction thereof
|
Description
|
Flat Rate Fee
|
---|---|
Demolition permit
|
$10
|
Wood-burning appliance
|
$25
|
Swimming pools
| |
Aboveground
|
$25
|
In-ground
|
$50
|
Requested inspections
|
$50
|
Miscellaneous accessory buildings
|
$35
|
Construction Cost Calculator
| |
---|---|
Description
|
Cost Per Square Foot
|
Single-family home
| |
One-story
|
$65
|
Two-story
|
$60
|
Garage
|
$20
|
Pole building
| |
No floor
|
$20
|
Concrete floor
|
$25
|
Deck
|
$8
|
Porch with roof
|
$15
|
House additions
|
$60
|
C.Â
Public hearing fee: $75.
D.Â
Single owner/operator business permit: $100.
E.Â
Business permit renewal fee: $50.
F.Â
Reinspection. Any reinspection in excess of normal inspections occasioned
by failure to keep appointments: $20.
G.Â
Renewals. The fee for renewal of permits, unless otherwise specified,
will be 50% of the original permit fee.
H.Â
Withdrawn permit applications. If a permit application is withdrawn
prior to the issuance of a permit, 50% of the fee will be refunded.
I.Â
Failure to obtain permit. If work or construction has commenced prior
to obtaining a permit and the Code Enforcement Officer notifies the
applicant to obtain a permit, the fee shall be two times the original
fee.