A.
Each significant industrial user (SIU) must obtain an industrial wastewater discharge permit. Industrial users other than SIUs whose wastewater flow and/or wastewater strength is different from that of domestic waste may be required to obtain an industrial waste discharge permit before connecting to, or directly or indirectly discharging into, the POTW.
[Amended 11-7-1996 by L.L. No. 15-1996]
B.
Industries required to obtain a permit and be connected to the public sewer system on the effective date of this chapter shall be required to obtain a permit within 180 days of the effective date hereof. Industries not connected to the public sewer system on the effective date of this chapter and required to obtain a permit shall do so before commencing a discharge to the public sewer system.