Exciting enhancements are coming soon to eCode360! Learn more 🡪
City of Yonkers, NY
Westchester County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
A. 
Any person who owns or operates any stationary sound source may apply to the Commissioner of the Department of Housing and Buildings for a variance from one or more of the provisions of this chapter.
[Amended 3-22-2005 by G.O. No. 4-2005]
B. 
Applications for a permit of variance shall supply information including but not limited to:
(1) 
The name and address of the applicant.
(2) 
The nature and location of the noise source for which such application is made.
(3) 
The reason for which the permit of variance is requested, including the hardship that will result to the applicant or the public if the permit of variance is not granted.
(4) 
The nature and intensity of noise that will occur during the period of the variance.
(5) 
The section or sections of this chapter for which the permit of variance shall apply.
(6) 
A description of interim noise control measures to be taken by the applicant to minimize noise and the impact occurring therefrom.
(7) 
A specific schedule of noise control measures.
(8) 
A presentation of adequate proof that noise levels occurring during the period of the variance will not constitute a danger to public health.
(9) 
A presentation of adequate proof that compliance with this chapter would impose an arbitrary or unreasonable hardship upon the applicant without equal or greater benefit to the public.
C. 
The applicant's failure to supply the required information required by this article shall be cause for rejection of the application.
[Amended 3-22-2005 by G.O. No. 4-2005; 6-20-2009 by L.L. No. 3-2009]
A. 
The Commissioner of the Department of Housing and Buildings shall charge the applicant a fee of $500 per week for all permits on properties other than one- and two-family dwellings, and for one- and two-family dwellings, the applicant shall be charged $250 per week.
[Amended 6-26-2012 by G.O. No. 13-2012; 5-14-2019 by L.L. No. 5-2019]
B. 
The duration of the permit of variance shall not exceed three months but may be extended by the Commissioner to any period of time up to one year at $500 per week for all permits on properties other than one- and two-family dwellings, and for one- and two-family dwellings the applicant shall be charged $250 per week.
[Amended 5-14-2019 by L.L. No. 5-2019]
C. 
After the first 12 months, the permit of variance may be extended for additional times upon filing a written request with an associated fee of $1,000 per week for all permits on properties other than one- and two-family dwellings, and for one- and two-family dwellings the applicant shall be charged $500 per week for each extension.
[Amended 6-26-2012 by G.O. No. 13-2012; 5-14-2019 by L.L. No. 5-2019]
D. 
A copy of the permit shall be on file with the City of Yonkers Department of Housing and Buildings.
[Amended 3-22-2005 by G.O. No. 4-2005]
In granting the application for permit of variance, the Commissioner of the Department of Housing and Buildings shall consider:
A. 
The character and degree of injury to or interference with the health and welfare or use of the property which is affected.
B. 
The social and economic value of the activity for which the variance is sought.
C. 
The ability of the applicant to apply the best practical noise control measures.
[Amended 3-22-2005 by G.O. No. 4-2005]
The permit of variance may be revoked by the Commissioner of the Department of Housing and Buildings if:
A. 
There is a violation of one or more conditions of the variance;
B. 
There is a material misrepresentation of fact in the permit application; or
C. 
There is a material change in any of the circumstances relied upon by the Commissioner in granting the variance.