The subdivider shall be required to place survey monuments at all corners of his plat, at the intersection of all street right-of-way lines, at all block corners and at all of the parcels within the plat.
B. 
The survey monuments shall be in conformance with the requirements of Ch. 236, Wis. Stats.
C. 
The Plan Commission may waive the placing of monuments before the plat is recorded for a reasonable time period after the plat is recorded. Such waiver shall be granted only upon receipt of a written request describing unusual conditions which in the opinion of the Plan Commission may warrant approval of such request and then only upon the subdivider furnishing a surety bond to insure the placement of such monuments within the time period granted. Any such waiver must be in conformance with the requirements of Ch. 236, Wis. Stats.
A. 
The public water supply system shall be extended to all lots within the subdivision.
B. 
The subdivider shall share, as specified elsewhere herein, in the cost of construction of up to twelve-inch mains, valves, and appurtenances, even if mains of larger sizes are constructed. However, if the subdivider shall have a specific need for or request a main of larger size, he shall share in the cost of such larger-sized mains. In the event that the City Water Utility decides to construct a main larger than 12 inches in part or all of the subdivision, the cost of these facilities in excess of the cost of twelve-inch mains shall be borne by the City.
A. 
The public sanitary sewer system shall be extended to all lots within the subdivision.
B. 
The subdivider shall share, as specified elsewhere herein, in the cost of construction of the portion of the extension of the sanitary sewer system that is necessary to provide service to his subdivision as required by the City.
A. 
A complete and adequate system for drainage of stormwater shall be provided for the entire subdivision as required by Department of Natural Resources regulations and City ordinance. This system may consist of an underground storm sewer system with inlets, catch basins, manholes and mains or consist of a surface system with open ditches, culverts, inlets, catch basins, manholes and pipes or a combination of underground and surface systems. The choice of systems must be approved by the City.
B. 
The subdivider shall share, as specified elsewhere herein, in the cost of the stormwater drainage facilities within his subdivision.
Underground electric service shall be provided to all lots in the subdivision. The power distribution system shall be underground wherever practical. Any cost of providing such underground electric service and power distribution system throughout the subdivision shall be borne by either the utility or the subdivider.
Underground telephone service shall be provided throughout the subdivision. Any cost of providing such underground telephone service throughout the subdivision shall be borne either by the telephone company or by the subdivider.
Underground cable television shall be provided throughout the subdivision. Any cost of providing such underground cable television shall be borne either by the cable television company or by the subdivider.
Ducts shall be provided for present or possible future gas lines at all intersections. Ducts shall be rigid conduit such as concrete pipe, cast-iron pipe, coated steel pipe or other permanent materials approved by the City. Any cost of providing such duct shall be borne by the developer.
All work and improvements necessary to provide water service, sanitary sewer service, stormwater drainage, power service, telephone service, cable television and natural gas service and whatsoever else is necessary to provide services to the individual structures and the individual lots throughout the entire subdivision shall be constructed before curb and gutter and permanent street surfacing are constructed.
The entire width of the right-of-way of each and every street, alley and cul-de-sac within the entire subdivision shall be graded. The grading shall be completed throughout the entire subdivision before any building permits are issued for structures throughout the entire subdivision. The subdivider shall share, as specified elsewhere herein, in the cost of the street grading.
Curb and gutter shall be provided along each and every street and cul-de-sac within the entire subdivision. The subdivider and/or the owners of individual parcels within the subdivision shall share, as specified elsewhere herein, in the cost of curb and gutter. The Plan Commission may allow a later completion date but only if the subdivider provides an executed surety bond guaranteeing performance of the work on or before the agreed upon completion date.
Surfacing including base course and surface course shall be provided for all streets, culs-de-sac and alleys throughout the entire subdivision. Gravel or crushed stone base course shall be placed immediately after completion of the grading. Either flexible (hot-mix bituminous surfacing) or rigid (concrete) street surfacing shall be placed over the base course at such time as designated by the City. The subdivider and/or owners of individual parcels within the subdivision shall share, as specified elsewhere herein, in the cost of street surfacing. The Plan Commission may allow a later completion date but only if the subdivider provides an executed surety bond guaranteeing performance of the work on or before the agreed upon completion date.
The subdivider shall be required to construct concrete sidewalk on at least one side of each street within the subdivision. The City may waive this requirement for minor streets. Sidewalks shall be constructed on a lot as the home is constructed, but all sidewalks must be completed within three years of final plat approval.
Erosion control measures shall be provided for all grading, excavation, open cuts, side slopes and other disturbed land surfaces throughout the entire subdivision. Erosion control measures may consist of but shall not be limited to mulching, topsoil, seeding, sodding and other methods. Regardless of the measures used it shall prevent erosion, siltation, sedimentation and washing of surface materials.
The subdivider shall plant no fewer than two trees on each boulevard in the subdivision and shall submit a boulevard tree plan to be approved by the City at the time of plat approval. The trees may be planted as part of the infrastructure construction at one time or on each individual lot as it is developed. A time limit will be placed on the planting plan, at which time all remaining undeveloped lots will have boulevard trees planted. The plan shall include as a minimum the species of tree to be planted, specific locations on each lot, and the schedule of planting. Lots fronting more than one street shall have no fewer than two trees on each street's boulevard. If trees are planted throughout the subdivision before homes are constructed, driveway locations should be established at the time of plat approval and care shall be taken to avoid damage to the trees during construction. Consideration shall be given to overhead power lines and existing or future sidewalk locations when planting the trees. Homeowners shall plant a minimum of five trees per lot within one year from the time of the construction of the home.
The City shall install street signs after completion of the construction of the various portions of the subdivision. Cost of street signs shall be borne by the developer.
A. 
All of the construction of all the improvements that are needed to complete the subdivision shall conform to the applicable requirements and standards of the City of New Lisbon. The subdivider shall submit the preliminary design for all of the construction that is needed to complete the subdivision as is required herein to the Plan Commission for review and shall obtain its approval of all preliminary designs before continuing with the project.
B. 
The subdivider shall submit the final plans and specifications for all of the construction that will be needed to complete the subdivision to the Plan Commission for review and shall obtain its approval of all final plans and specifications for all of the needed construction before commencing any of the construction. The City shall reserve the right to supervise and inspect any or all of the needed construction. Record drawings of the construction plans and a two-foot contour map shall be submitted electronically utilizing the Juneau County coordinate system and in hard copy to the City within six months of construction completion. All of the needed construction shall be approved by the City before any building permits shall be issued. A developer's agreement shall be negotiated between the subdivider and the City and approved by the Common Council prior to commencing any construction. This agreement shall include any special arrangements, incentives, special conditions imposed by the City during plat review, and a cost sharing agreement (including the upper limit available from the City).
C. 
The subdivider shall be required to provide a surety bond that the design and/or construction of the project shall conform to the requirements of this section and of this chapter.
Before the City shall consider or begin review of the proposed subdivision, the subdivider shall be required to post a guarantee and/or guarantees with the City that he shall conform to all of the applicable requirements of this chapter. The guarantees shall be for the amounts as specified elsewhere herein in connection with the performance of the particular item. The guarantee may be in the form of a cash deposit with interest to be credited to the subdivider on the unexpended portion of the deposit until such time as all events being guaranteed are performed. The guarantee may be in the form of a performance bond approved by the City Attorney.
The costs of the various items of work and improvements required for the development of any particular subdivision shall be shared by the subdivider and/or the City as listed below. The costs of other items of work not listed below shall be shared as indicated elsewhere herein. Costs not listed below or elsewhere herein shall be borne by the subdivider. The subdivider's share of the cost as described below is required to be paid in full by the subdivider upon demand by the City.
Schedule of Sharing of Costs for Development of a Subdivision
Share of Cost
Item of Work
Subdivider
Borne by City
Preliminary engineering and investigations
100%; required guarantee $2,500
0%
Water mains, valves and appurtenances (up to 12 inches)
100%
0%
Sanitary sewer mains
100%
0%
Lift station and force main
75%
25%
Stormwater drainage facilities
75%
25%
Street grading
100%
0%
Curb and gutter
100%
0%
Gravel or crushed stone base course 40 feet wide by 9 inches thick
100%
0%
Pavement (surface course including additional base course)
100%
0%
Sidewalks
100%
0%
Fire protection
100%
0%
Streetlights
100%
0%
Engineering, legal, administrative review, construction, supervision and inspection
100%
0%
Electric wire
100%
0%