[HISTORY: Adopted by the Mayor and Council of the Borough
of Port Allegany 4-4-2011 by Ord. No. 446. Amendments noted where
applicable.]
Table of Contents
Table of Contents
- Part I: Administrative Legislation
- Ch 1 General Provisions
- Ch 5 Civil Service Commission
- Ch 17 Municipal Authorities
- Ch 20 Officers and Employees
- Ch 24 Planning Commission
- Ch 28 Seal
- Ch 30 Shade Tree Commission
- Ch 33 Water Department
- Part II: General Legislation
- Ch 38 Alcoholic Beverages
- Ch 42 Building Construction
- Ch 43 Building Numbering and Street Signs
- Ch 44 Burning, Outdoor
- Ch 45 Certificates of Compliance
- Ch 45A Construction Codes, Uniform
- Ch 46 Curfew
- Ch 47 Dangerous Structures and Property Maintenance
- Ch 48 Animals
- Ch 52 Electrical Standards
- Ch 56 Fire Prevention
- Ch 61 Garage Sales
- Ch 62 Garbage, Rubbish and Refuse
- Ch 67 Housing Standards
- Ch 68 Insurance
- Ch 70 Mechanical Standards
- Ch 72 Noise
- Ch 73 Peddling and Soliciting
- Ch 77 Plumbing Standards
- Ch 79 Poles and Wires
- Ch 85 Sewers
- Ch 87 Stormwater Management
- Ch 87 Art I General Provisions
- § 87-1 Short title.
- § 87-2 Statement of findings.
- § 87-3 Purpose.
- § 87-4 Statutory authority.
- § 87-5 Applicability.
- § 87-6 Repealer.
- § 87-7 Severability.
- § 87-8 Compliance and conflict with other provisions.
- § 87-9 Duty of persons engaged in development of land.
- § 87-10 Municipal liability disclaimer.
- Ch 87 Art II Definitions
- § 87-11 Word usage; definitions.
- Ch 87 Art III Stormwater Management Standards
- § 87-12 General requirements.
- § 87-13 Exemptions/modifications.
- § 87-14 Waivers.
- § 87-15 Volume controls.
- § 87-16 Rate controls.
- Ch 87 Art IV E&S Standards
- § 87-17 Erosion and sedimentation requirements during earth disturbance activities.
- Ch 87 Art V Protected Watershed Standards
- § 87-18 (Reserved)
- Ch 87 Art VI Riparian Buffer Standards
- § 87-19 (Reserved)
- Ch 87 Art VII SWM Site Plan and Report Requirements
- § 87-20 General requirements.
- § 87-21 SWM site plan and report contents.
- § 87-22 SWM site plan and report submission.
- § 87-23 SWM site plan and report review.
- § 87-24 Modification of plans.
- § 87-25 Resubmission of disapproved SWM site plan and report.
- § 87-26 Authorization to construct; term of validity.
- § 87-27 Record drawings; completion certificate; final inspection; review fee.
- Ch 87 Art VIII Design Criteria
- § 87-28 Design criteria for stormwater management and drainage facilities.
- § 87-29 Calculation methodology.
- Ch 87 Art IX Easements
- § 87-30 Easements.
- Ch 87 Art X Maintenance Responsibilities
- § 87-31 Financial guarantee.
- § 87-32 Maintenance responsibilities.
- § 87-33 Maintenance agreement for privately owned stormwater facilities.
- Ch 87 Art XI Inspections
- § 87-34 Schedule of inspections.
- § 87-35 Right of entry.
- Ch 87 Art XII Fees and Expenses
- § 87-36 Review fee.
- § 87-37 Expenses covered by fees.
- § 87-38 Filing or recording of approved SWM site plan and related agreements.
- Ch 87 Art XIII Prohibitions
- § 87-39 Prohibited discharges and connections.
- § 87-40 Roof drains.
- § 87-41 Alteration of BMPs.
- Ch 87 Art XIV Enforcement and Penalties
- § 87-42 Notification.
- § 87-43 Enforcement.
- § 87-44 Public nuisance.
- § 87-45 Suspension and revocation.
- § 87-46 Violations and penalties.
- § 87-47 Appeals.
- Ch 88 Streets and Sidewalks
- Ch 92 Taxation
- Ch 93 Vehicles, Abandoned
- Ch 94 Vehicles and Traffic
- Ch 95 Vehicles, Recreational
- Ch 97 Water
- Ch 100 Zoning
- Disposition List
- Ch DL Disposition List