[Adopted 3-21-1994 by Ord. No. 1157; amended 7-2-2001 by Ord. No. 1351; 1-2-2007 by Ord. No. 1449]
[Amended 11-18-2013 by Ord. No. 1563; 3-21-2022 by Ord. No. 1645]
The following fees shall be charged to and collected from applicants for plumbing and gas fitting permits by the Plumbing Inspector:
A. 
Plumbing, residential:
(1) 
New construction:
(a) 
Basic first five fixtures: $150.
(b) 
Each additional fixture: $10.
(2) 
Renovations:
(a) 
Basic first three fixtures: $150.
(b) 
Each additional fixture: $10.
(3) 
Residential boiler, water heater, storage tank and/or one fixture: $50.
(4) 
Residential dishwasher: $30.
B. 
Plumbing, commercial:
(1) 
New construction:
(a) 
Basic first five fixtures: $175.
(b) 
Each additional fixture: $20.
(2) 
Renovations:
(a) 
Basic first three fixtures: $125.
(b) 
Each additional fixture: $10.
(3) 
Commercial boiler, water heater, storage tank backflow preventer and/or one fixture: $75.
(4) 
Reinspection fee: $75.
C. 
Gas permits:
(1) 
New residential:
(a) 
Basic first fixture: $100.
(b) 
Each additional fixture: $10.
(2) 
Residential renovations:
(a) 
Basic first fixture: $75.
(b) 
Each additional fixture: $10.
(c) 
Residential gas re-test: $50.
(3) 
New commercial:
(a) 
Basic first fixture: $150.
(b) 
Each additional fixture: $20.
(4) 
Commercial renovations:
(a) 
Basic first fixture: $125.
(b) 
Each additional fixture: $20.
(5) 
Replacement of fixture — commercial, residential or gas test: $75.
(6) 
Reinspection: $75.
(7) 
Rooftop replacements: $75.
D. 
In addition to the permit fee, a penalty of double the fee will be charged in any case where construction has begun before a permit is issued.
E. 
A processing fee of $150 will be administered to all paper applications.
F. 
No fee for any permits in connection with work being performed for the City of Gardner.