In accordance with Article 10 of the Municipal Home Rule Law of the State of New York, the governing Town Board of the Town of North Greenbush has the authority to enact local laws and amend local laws for the purpose of promoting the health, safety or general welfare of the Town of North Greenbush and for the protection and enhancement of its physical environment through the use of land use controls of developments and zoning. The Town Board may include in any such local law provisions for the appointment of any municipal officer, employees, or independent contractor to effectuate, administer and enforce such local law.
This Article XXIX shall be known as "Town of North Greenbush Local Law No. 4-2010" and amends the Town of North Greenbush Zoning Code to provide for the creation of the Partridge Hill Apartments II PBD Zoning District.
The boundary of the Partridge Hill Apartments II PBD Zoning District is established as being Tax Map Parcel No. 133-2-1.132 and part of 133-2-1.131 on the 2010 Tax Assessment Rolls of the Town of North Greenbush, consisting of approximately nine acres.
A. 
The Partridge Hill Apartments II shall be developed for a maximum of 104 units of apartments, located in four-three story structures as per Exhibit A, Partridge Hill Apartments II, dated March 2008, as prepared by ABD Engineers & Surveyors, and attached hereto as Exhibit A.[1]
[1]
Editor's Note: Exhibit A is on file in the Town offices.
B. 
In the event that the Partridge Hill Apartments II development does not occur, any future development shall conform to all requirements of the PBD Zone regulations and shall be limited to residential uses.
A. 
For development of the Partridge Hill Apartments II:
(1) 
Minimum front yard setback: 30 feet.
(2) 
Minimum side yard setback: 10 feet on one side.
(3) 
Minimum rear yard setback: 25 feet.
(4) 
Maximum building height: three story design with basements for underground parking.
(5) 
Maximum building coverage: 20%.
B. 
For development of any other use:
(1) 
PBD Zone requirements shall govern, but it shall be limited to residential uses.
A. 
A minimum of 1.5 off-street parking spaces per unit shall be provided. (Parking spaces may be in a garage or in surface lots.)
B. 
An additional total of 0.5 space per unit of off-street parking spaces shall be provided, for guests and visitors.
C. 
Each parking space shall be a minimum of nine feet wide by 18 feet in depth for a total of 162 square feet for outside parking.
D. 
The residents shall be prohibited from utilizing exterior parking areas for storage or parking of recreational vehicles, motor homes, trailers, boats, unregistered vehicles or other items deemed unacceptable by the Town of North Greenbush Building Department.
E. 
Internal garage spaces shall not be used for storage of any materials. Only parking of registered vehicles shall be allowed.
All roadways shall be designed as privately maintained access and parking area and constructed in accordance with the specifications as noted on Exhibit A.[1]
[1]
Editor's Note: Exhibit A is on file in the Town offices.
A. 
All buildings of the Partridge Hill Apartments II shall be serviced with public water and public sanitary sewers installed in accordance with plans approved by the Town Engineer and the Rensselaer County Health Department.
B. 
All public water and public sanitary sewers shall be constructed in accordance with the Town of North Greenbush standards and as hereinafter noted.
C. 
All public water and public sanitary sewers improvements, except as hereinafter noted, shall be deeded to the Town of North Greenbush for future operation and maintenance. Easements shall be provided for all water and sewer lines.
D. 
All water laterals shall be the responsibility of the property owner from the main line to the structure.
E. 
All sanitary sewer laterals shall be the responsibility of the property owner from the main line to the structure.
F. 
A water permit (including water meter assembly and pressure-reducing valve) and sanitary sewer permit shall be obtained from the Town of North Greenbush Utilities Department for each structure.
G. 
A gravity sanitary sewer system to service the entire Partridge Hill Apartments II shall be installed in accordance with Town of North Greenbush standards and as herein noted.
H. 
This new gravity sanitary sewer system shall be connected to an existing manhole in the Rensselaer County Sewer District No. 1 system located on Valley View Boulevard. Authorization from Rensselaer County Sewer District No. 1 to connect to this manhole shall be obtained by the developer prior to construction.
I. 
The sanitary sewer system shall be eight-inch SDR-26 PVC pipe, precast concrete manholes and eight-inch high, heavy-duty, twenty-four-inch diameter vented manhole castings installed in accordance with plans approved by the Town Engineer and the Rensselaer County Health Department.
A. 
All electric, natural gas, telephone and cable TV lines shall be located underground.
B. 
All aboveground structures/pads/junction boxes shall be screened as much as possible with landscaping as approved by the Town Engineer.
A. 
The stormwater management system shall be designed to comply with the current NYSDEC stormwater regulations and the Town of North Greenbush local laws.
B. 
A complete stormwater pollution prevention plan (SWPPP) shall be submitted to the Town Engineer for approval prior to any construction being started at the site.
C. 
The Town Engineer shall approve the stormwater management system design. The design shall allow for easy maintenance and mowing.
D. 
All stormwater ponds shall be fenced with a four-foot-high, heavy-duty, black-vinyl-clad, chain-link fence with access gates as approved by the Highway Superintendent.
E. 
The stormwater management system shall remain privately owned and maintained by the apartment complex owners.
A. 
All buildings shall be constructed or clad with material that is durable, economically maintained and of a quality that will maintain its appearance over time.
B. 
Elevations and floor plans of the residences shall be as per the attached Exhibits B-1 and B-2, Building Elevations Partridge Hill Apartments II, dated November 2009, prepared by the Clover Group.[1] These exhibits represent a generalized style of the buildings, and the Building Department Coordinator shall review any changes to this design. Any substantial changes shall be referred to the Planning Board for final approval.
[1]
Editor's Note: Exhibits B-1 and B-2 are on file in the Town offices.
C. 
No more than one accessory building or shed shall be allowed in the Partridge Hill Apartments II, to be used to store maintenance equipment for the complex.
D. 
Landscaping for each structure shall be as per the attached Exhibit A, Partridge Hill Apartments II, dated March 2008, as prepared by ABD Engineers & Surveyors. Any changes shall be submitted to the Town Engineer for approval prior to installation. Any substantial changes shall be referred to the Planning Board for final approval.
E. 
Landscaping for the entrance along Valley View Boulevard shall be as per the attached Exhibit A, Partridge Hill Apartments II, dated March 2008, as prepared by ABD Engineers & Surveyors. Any changes shall be submitted to the Town Engineer for approval prior to installation. Any substantial changes shall be referred to the Planning Board for final approval.
F. 
Refuse storage areas shall be enclosed in fenced structures.
A. 
A sidewalk shall be constructed in the Valley View Boulevard right-of-way to connect Partridge Hill Apartments II as per the attached Exhibit C, Sidewalks, Partridge Hill Apartments II, dated November 2009, prepared by ABD Engineers & Surveyors.[1]
[1]
Editor's Note: Exhibit C is on file in the Town offices. Any changes shall be submitted to the Town Engineer for approval prior to installation. Any substantial changes shall be referred to the Planning Board for final approval.
B. 
A per-unit green space/recreation fee of $600 shall be paid at the time the individual building permits are issued for each structure.
C. 
There shall be at least one common mailbox/newspaper box facility for all residences to pick up their mail and newspapers. This facility shall be attractively landscaped and located near the front of the project site and be served by at least four unassigned off-street parking spaces.
A. 
A work permit shall be issued for the site work (grading and infrastructure), all in accordance with the Town of North Greenbush Building Department's fees and procedures.
B. 
Individual building permits shall be issued for each structure, all in accordance with the Town of North Greenbush Building Department's fees and procedures.
C. 
Prior to the start of any construction, a preconstruction meeting shall be held to review all aspects of the project. Shop drawings shall be approved by the Town Engineer prior to being installed in the construction of any infrastructure to be dedicated to the Town.
D. 
An escrow account shall be established by the developer, prior to the start of site work, with the Town of North Greenbush to provide for engineering review, observation and oversight by the Town of North Greenbush personnel/consultants on all public utilities to be dedicated to the Town. The amount of such escrow account shall be subject to review from time to time during the construction activities to make sure that a sufficient balance is maintained to cover the costs for the engineering review and oversight.
E. 
Site work and construction may take place between 7:00 a.m. to 7:00 p.m., Monday through Friday, and 7:00 a.m. to 5:00 p.m. on Saturdays, without prior written approval from the Town of North Greenbush Building Department.
F. 
No site work or construction shall take place on any Sunday, Christmas Day or New Year's Day.
G. 
A project progress committee shall be established at the preconstruction meeting, consisting of the Building Inspector, Planning Board Chairman, Fire Marshal, Utilities Department Supervisor, Town Engineer and the developer's representative. The purpose of this committee would be to review and authorize minor changes to the approved site plan prior to construction being allowed on these minor changes.
H. 
The developer shall be responsible to submit to the Town Engineer an acceptable as-built set of plans for all infrastructure to be dedicated to the Town.
A. 
All signage shall comply with the Town of North Greenbush signage regulations.
B. 
Two landscaped entrance-type signs identifying the Partridge Hill Apartments II or future designated project name shall be allowed, one at each entranceway off Valley View Boulevard.
C. 
The entrance signs shall be designed as a "nonhazardous roadside obstacle" type sign and shall be located outside of the public rights-of-way.
D. 
The entrance sign shall be submitted to the Town of North Greenbush Planning Board for approval prior to installation.
E. 
All traffic control signs for the Partridge Hill Apartments II shall be in accordance with the NYSDOT Manual of Uniform Traffic Control Devices.
F. 
Stop signs shall control traffic exiting the site onto Valley View Boulevard.
G. 
No-parking signs shall be installed as per the direction of the Fire Marshal throughout the site.
A. 
Prior to the subdivision plat being signed by the Planning Board Chairman for the Partridge Hill Apartments II, a subdivision plat and site plan, in substantial compliance with this Part XXIX and the exhibits attached hereto, shall be submitted and approved after a public hearing by the Town of North Greenbush Planning Board.
B. 
Prior to issuance of a work permit by the Town of North Greenbush Building Department, the following conditions shall be complied with:
(1) 
All final Planning Board and engineering comments shall be addressed on the site plan.
(2) 
All necessary approvals for the public water and sanitary sewer shall be obtained.
(3) 
All necessary agreements shall be executed with the Town of North Greenbush as required.
(4) 
All necessary performance bonds and security agreements shall be filed with the Town of North Greenbush.
(5) 
Funding of the appropriate engineering review, observation and oversight escrow shall be established with the Town of North Greenbush Comptroller.
(6) 
Payment of all municipal review fees.
(7) 
The approved subdivision plat shall be signed by the Planning Board Chairman and filed in the Rensselaer County Clerk's office.
Traffic mitigation fees, to be used for the design and/or construction of improvements to the NYS Route 4 and Valley View Boulevard intersection in the amount of $1,500 per unit shall be paid by the developer of the Partridge Hill Apartments II to the Town of North Greenbush within 60 days from the date of final site plan approval by the Town of North Greenbush Planning Board.
A. 
The Town of North Greenbush shall have the right to enforce this Article XXIX.
B. 
Any violation of a provision of this Article XXIX shall be deemed a violation of the Town of North Greenbush Zoning Code, and the provisions hereof shall be enforceable pursuant to the enforcement provisions of said Town of North Greenbush Zoning Code.