Exciting enhancements are coming soon to eCode360! Learn more 🡪
Town of Genesee, WI
Waukesha County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
The owner shall pay the municipality all fees as hereinafter required and at the times specified.
[Amended 2-11-2002 by Ord. No. 02-1]
The owner shall pay a fee in an amount established by separate resolution of the Town Board from time to time for each lot or parcel within the preliminary plat, replat, or certified survey map to the Municipal Clerk at the time of first application for approval of any preliminary plat, replat or certified survey map to assist in defraying the cost of review by the Plan Commission and governing body. A reapplication fee in an amount established by separate resolution of the Town Board from time to time shall be paid to the Municipal Clerk at the time of reapplication for approval of any preliminary plat, replat or certified survey map which has previously been reviewed.
[Amended 2-11-2002 by Ord. No. 02-1]
The owner shall pay a fee in an amount established by separate resolution of the Town Board from time to time, which shall include a base fee amount plus a specific fee amount for each lot or parcel within the final plat, to the Clerk at the time of first application for final plat approval of said plat to assist in defraying the cost of review by the Plan Commission and application for final plat approval of said plat to assist in defraying the cost of review by the Plan Commission and governing body. A reapplication fee in an amount established by separate resolution of the Town Board from time to time shall be paid to the Municipal Clerk at the time of reapplication for approval of any final plat which has previously been reviewed.
If the plat or certified survey map does not contain lands to be dedicated as required in §§ 375-9 and 375-55, the municipality shall require a fee for the acquisition and development of public sites to serve the future owners of the proposed land division and/or development. Said fee shall be paid to the Municipal Clerk at the time of the approval of the land division and/or development in the amount as outlined in § 375-55. Public site fees shall be placed in a separate nonlapsing special fund by the Municipal Clerk to be used only for the acquisition and development of public sites.
The owner shall pay a fee equal to the actual cost to the municipality for all engineering work incurred by the municipality in connection with a plat, replat, certified survey map or development, including but not limited to all costs incurred by the municipality for review of plans and documents, inspections, field surveys, etc., within 30 days of notice of the same, prior to being entitled to recording of a plat, replat, or certified survey map or acceptance of any improvement or final approval of a development, whichever is earliest.
The owner shall pay a fee equal to the actual cost of any legal, planning, administrative or fiscal work which may be undertaken by the municipality in connection with the plat, replat, certified survey map or development. In the event any special meetings are called, either by the governing body or the Plan Commission, for the benefit of the plat, replat, certified survey map or development, the owner may be required to pay to the municipality all expenses for such a special meeting, including any extra salaries paid to municipal officials. All such fees shall be paid by the owner within 30 days of notice of the same.
The owner shall pay the actual cost of acquiring and installing streetlamps and street signs pursuant to the policy set forth in §§ 375-65 and 375-66 of this chapter within 30 days of notice of the same.
[Amended 2-11-2002 by Ord. No. 02-1]
The owner shall pay a drainage easement fee prior to the recording of a final plat or certified survey map in an amount established by separate resolution of the Town Board from time to time. Said resolution shall describe a fee amount per linear foot for easements up to 50 feet wide and a fee amount per square foot for easements over 50 feet wide and irregular-shaped areas.