[Added 11-21-2001 by L.L. No. 4-2001]
A.
The purpose of this article is to regulate the location, design,
and use of wireless communications facilities in order to:
(1)
Protect the health, safety, and general welfare of residents of the
Town of.
(2)
Establish predictable and balanced regulations for the siting and
screening of wireless communications facilities in order to accommodate
the growth of communications services within the Town.
(3)
Maximize the use of existing towers, tall buildings and other high
structures to reduce the number of new towers needed to serve the
community.
(4)
Avoid potential damage to adjacent properties from tower failure
through structural standards and setback requirements.
(5)
Ensure harmony and compatibility with surrounding land use patterns.
(6)
Protect the historic rural character, natural features and irreplaceable
scenic qualities of the Town with special attention to open space,
mountain ridges, recreation areas, scenic roads, view sheds and historic
sites, through careful design, siting, landscaping, screening and
innovative camouflaging techniques.
B.
This chapter is not intended to prohibit or have the effect of prohibiting
the provision of personal wireless services, nor shall they be used
to discriminate among providers of functionally equivalent services,
consistent with federal regulations.
A.
Use regulations. This chapter governs the installation and/or use
of all wireless communications facilities as defined herein. Any proposed
user of wireless communications facilities shall be an FCC-licensed
provider of wireless communications facilities and must obtain site
plan approval and/or a special use permit whether or not they will
install and own the facilities. The construction of a wireless communications
facility shall require a building permit in all cases.
(1)
Permitted uses, existing structures. A wireless communications facility may be permitted to locate on any existing radio or television transmission tower, guyed tower, lattice tower, monopole, fire tower, water tower, clock tower, bell tower, cross tower, flagpole, road sign, steeple, chimney, silo or other innovative use of appropriate existing structures (as determined by the Planning Board) provided that there is no increase in the height of the existing structure as a result of the installation of the facility. Such installations shall not require a special use permit but will require site plan approval by the Planning Board in accordance with Article VII of this chapter.
(2)
Permitted uses, existing buildings. A wireless communications facility may be permitted to locate on any existing building, with the exception of a designated historic structure, provided that the installation of the new facility does not increase the height of the existing building by more than 10 feet. Such installations shall not require a special use permit but will require site plan approval by the Planning Board in accordance with Article VII of this chapter.
(3)
Permitted uses, existing utility structures. A wireless communications facility may be permitted to locate on any existing electric utility transmission and distribution tower, telephone pole and similar existing utility structure provided that the installation of the new facility does not increase the height of the existing structure by more than 20 feet. These facilities may locate in all areas of the Town where they are permitted or specially permitted by § 240-14 of this chapter, except within 500 feet of a designated historic structure or within 250 feet of the right-of-way of any scenic road. Such facilities may locate within 250 feet of the right-of-way of any scenic road, provided the new facility does not increase the height of the existing structure. Such installations shall not require a special use permit but will require site plan approval by the Planning Board in accordance with Article VII of this chapter.[1]
(4)
Special use permit. A wireless communications facility involving construction of one or more ground-mounts shall require a special use permit. A special use permit may be granted provided that the proposed use complies with the height, setback, and other requirements of this chapter, the special use permit regulations set forth in Article VI, is placed to minimize visual and aesthetic impacts, and is placed on the side slope of terrain so that, as much as possible, the top of the tower does not protrude over the ridgeline. The Town defines the placement, construction, and modification of a wireless communications facility requiring a special use permit as a Type I action under the New York State Environmental Quality Review Act[2] (SEQR).
[Amended 4-21-2010 by L.L. No. 2-2010]
(a)
If an applicant for a special use permit proposes a wireless
communications facility which does not meet all dimensional requirements
of the Town Rural Development Code, including height, area and bulk
regulations, the applicant may, at any point in the review process
apply for an area variance from the Board of Appeals.
(b)
New wireless communications facilities requiring a special use
permit shall be prohibited from locating:
(c)
It shall be the responsibility of the holder of the special
use permit to inform the Town of Martinsburg of any change in or termination
of contractual agreements which affect the special use permit within
30 days of such change. Any material change in the conditions under
which a special use permit was granted shall result in the immediate
termination of the special use permit unless agreement has been obtained
from the Planning Board prior to the change. These material changes
include but are not limited to:
[1]
Changes in supporting structures (such as towers), accessory
buildings or access roads.
[2]
A change in ownership of the facility or the property on which
the facility is installed shall require notification to the Code Enforcement
Officer by the holder of the special use permit but will not terminate
such permit.[4]
[3]
Cessation of use by the FCC-licensed carrier which has a special
use permit for use of the facility.
[4]
A change in the FCC-licensed user of the specially permitted
facility. Nothing herein shall prohibit another FCC-licensed carrier
from using the facility so long as that carrier provides evidence
of need to use that facility and acquires a special use permit under
this chapter.
[5]
Loss of the user's FCC license to provide commercial communications
services within the Town.
[6]
Violation of the Town's Rural Development Code, on or with regard
to the facility by the holder(s) of the special use permit or the
owner of the land on which the facility is installed.
[2]
Editor's Note: See Environmental Conservation Law § 8-0101
et seq.
B.
Location. Wireless communications facilities shall only be located, upon the grant of site plan approval and, as applicable, a special use permit, on property which allows wireless communications facilities as set forth in § 240-14 of this chapter. Applicants seeking approval for wireless communications facilities shall comply with the following:
[Amended 4-21-2010 by L.L. No. 2-2010[5]]
(1)
If feasible, new wireless communications facilities shall be located
on existing structures, including but not limited to buildings, water
towers, existing communications facilities, silos, utility poles and
towers, and related facilities, provided that such installation preserves
the character and integrity of those structures. In particular, applicants
are urged to consider use of existing telephone and electric utility
structures as sites for one or more wireless communications facilities.
The applicant shall have the burden of proving that there are no feasible
existing structures on which to locate.
(2)
If the applicant demonstrates that it is not feasible to locate on
an existing structure, wireless communications facilities shall be
designed so as to be camouflaged to the greatest extent possible,
including but not limited to the use of compatible building materials
and colors, screening, landscaping, placement within trees, and the
use of stealth technology to disguise the facility as determined by
the Planning Board.
(3)
The applicant must submit documentation of the legal right to install
and use the proposed facility mount at the time of application for
site plan approval and/or special use permit.
C.
Dimensional requirements. Wireless communications facilities shall
comply with the following requirements:
(1)
Height. The total height of any mount or accessory elements attached
to any structure shall be measured from the ground level to the top
of the mount or the top of the uppermost accessory affixed to the
mount, whichever is higher. Maximum height of a wireless communications
facility is limited to 80 feet above ground level (AGL) in cleared
areas where there are less than 20 trees within 100 feet surrounding
the proposed location. If there are at least 20 trees within 100 feet
surrounding the proposed location, the total height of the proposed
facility shall be limited to 25 feet above the average tree canopy,
or 100 feet, whichever is lower.
(2)
Height variance. The Board of Appeals may allow wireless communications
facilities up to 150 feet if an independent radio frequency consultant
determines that adequate coverage would not be provided by a tower
of lesser height and if the applicant can demonstrate that, based
upon topography of the site and surrounding area, siting of the antenna,
antenna design, surrounding tree cover and structures and/or through
the use of screening, that off-site views of the facility will be
de minimis. The height limitation is waived when the antenna is mounted
on an existing structure or building and is completely camouflaged,
or is located on an existing utility structure. Applicants may be
required to achieve coverage objectives by using multiple existing
or new structures rather than taller structures, which shall not exceed
the height limitations.
(3)
Setbacks. All wireless communications facilities and their equipment
shelters shall comply with the building setback provisions of the
zoning district in which the facility is located. In addition, the
following setbacks shall be observed:
(a)
To ensure public safety, the minimum distance from the base
of any ground-mounted wireless communications facility to any property
line, road, habitable dwelling, business or institutional use, accessory
structure, or public recreation area shall be the height of the facility/mount,
including any antennas or other appurtenances. This setback is considered
the "fall zone." Additional setbacks may be required by the Planning
Board to provide for the public safety.
(b)
In the event that an existing structure or building is proposed
as a mount for a wireless communications facility, a fall zone shall
not be required unless the Planning Board finds that a substantially
better design will result from an increased setback. In making such
a finding, the Planning Board shall consider both the visual and safety
impacts of the proposed use.
All wireless communications facilities shall comply with the
performance standards set forth in this section.
A.
Noise. Roof-mounted or side-mounted equipment for wireless communications
facilities shall not generate noise in excess of 50 dB at ground level
at the base of the building closest to the antenna.
[Amended 4-21-2010 by L.L. No. 2-2010]
All wireless communications facilities requiring set forth in this section, in addition to special use permit, shall comply with the regulations set forth in this section, in addition to those found in Article VI.
A.
Design standards.
(1)
Camouflage. Wireless communication facilities shall be camouflaged
by vegetation and/or design as follows:
(a)
Camouflage by vegetation. If wireless communications facilities
are not camouflaged from public viewing by existing buildings or structures,
they shall be surrounded by buffers of dense tree growth and understory
vegetation in all directions to create an effective year-round visual
buffer. Ground-mounted wireless communications facilities shall provide
a vegetative buffer of sufficient height and depth to effectively
screen the facility. Trees and vegetation may be existing on the subject
property or installed as part of the proposed facility or a combination
of both. The Planning Board shall determine the types of trees and
plant materials and depth of the needed buffer based on site conditions.
Such buffer shall be maintained in a healthy state or replaced as
necessary to provide continuing camouflaging.
(b)
Camouflage by design. To the extent that any wireless communications
facility extends above the height of the vegetation immediately surrounding
it, the facility shall be camouflaged by design to minimize the adverse
visual and aesthetic impact unless otherwise required by the Planning
Board. Wireless communications facilities shall be camouflaged to
resemble or mimic a native coniferous species of tree or by other
means such as new construction of a silo, flagpole, clock tower, bell
tower, cross tower, steeple or other innovative replication of a structure
that would be consistent with the character of the community as determined
by the Planning Board.
(2)
Lighting. Wireless communications facilities shall not be artificially
lighted or display strobe lights unless required by the Federal Aviation
Administration (FAA) or other applicable authority. Security lighting
of equipment structures and other facilities on site shall be shielded
from abutting properties. There shall be total cutoff of all such
light at the property lines of the parcel to be developed, and footcandle
measurements at the property line shall be 0.0 initial footcandles
when measured at grade.
(3)
Signs.
(a)
Signs shall be limited to those needed to identify the property
and the owner and warn of any danger. No advertising is permitted
anywhere on the facility, with the exception of the identification
signage. All signs shall comply with the requirements of the Town's
sign regulations.
(b)
All ground-mounted wireless communication facilities shall be
surrounded by a security barrier which shall be posted with no-trespassing
signs. A twenty-four-hour emergency telephone number shall be posted
adjacent to the entry gate. If high voltage is necessary for the operation
of equipment within the facility, signs shall be posted stating "Danger:
High Voltage."
(4)
Equipment shelters. Equipment shelters for wireless communications
facilities shall be designed consistent with one of the following
standards:
(a)
Equipment shelters shall be located in underground vaults, or
(b)
Equipment shelters shall be designed to be architecturally compatible,
both in style and materials, with principal structures on the site,
as determined by the Planning Board, or
(c)
Equipment shelters shall be camouflaged behind an effective
year-round landscape buffer equal to the height of the proposed building.
The Planning Board shall determine the types of plant materials and
depth of the needed buffer based on site conditions. Such buffer shall
be maintained in a healthy state or replaced as necessary to provide
continuing camouflaging.
(5)
Accessory structures. Accessory structures for wireless communications
facilities shall be permitted if the structures are constructed for
the sole and exclusive use and operation of the communications facility,
are the minimum size necessary to meet the needs of the specific site,
and meet the following requirements:
(a)
Accessory structures may not include office, long-term vehicle
storage, other outdoor storage or other uses that are not needed to
send or receive wireless communications transmissions.
(b)
Accessory structures must be less than 500 square feet and 15
feet in height.
(c)
Accessory structures must be camouflaged behind an effective
year-round landscape buffer equal in height of the proposed structure.
Such buffer shall be maintained in a healthy state or replaced as
necessary to provide continuing camouflaging.
(d)
In residential zones, the use of compatible building materials
such as wood, brick or stucco is required for all accessory structures,
which shall be designed to match architecturally the exterior of residential
structures in the neighborhood, as determined by the Planning Board.
In no case will metal siding be allowed for accessory structures.
(6)
Scenic landscapes and vistas. Wireless communications facilities
shall not be located within open areas that are visible from public
roads, recreational areas or residential development All ground-mounted
wireless communications facilities shall be surrounded by a buffer
of dense tree growth or shall be camouflaged by design to minimize
adverse visual and aesthetic impacts.
(7)
Utility service lines. All electric power supply and telephone service
lines to new towers and accompanying facilities shall be installed
underground from the existing power source.
(8)
Access and parking.
(a)
A road and parking plan shall be provided to ensure adequate
emergency and service access and shall meet the requirements of the
Planning Board. Any driveway shall meet the requirements of the Planning
Board and the highway authority for the road on which driveway fronts.
(b)
Maximum use of existing public and private roads shall be made,
consistent with safety and aesthetic considerations.
(c)
Road construction shall minimize ground and vegetation disturbance.
Road grades shall follow natural contours to reduce soil erosion potential
and to ensure that roads are aesthetically compatible with the character
of the surrounding area.
(d)
The Planning Board may require an erosion and sedimentation
control plan and may refer the site plan to the Lewis County Soil
and Water Conservation District, Town Engineer, and/or Town Planner
for review.
(e)
Unpaved roads shall be considered unless conditions require
paving, as determined by the Planning Board, in consultation with
the appropriate authorities or consultants.
(9)
Maintenance, testing and inspection.
(a)
The original appearance of the exteriors of all towers, accessory
buildings and any other structures must be retained through regular
maintenance by the applicant.
(b)
Before commercial transmission begins, the applicant shall acquire
certification by a licensed professional engineer that the facility
will not exceed the maximum permissible exposure limits for the level
of electromagnetic radiation using standards in accordance with the
FCC guidelines.
(10)
Removal of facilities.
(a)
Towers and antennas shall be removed if the owner's or user's
special use permit for these facilities has expired or been terminated
or if the facilities are no longer being used by the FCC licensee.
Towers and antennas shall be removed if there is not at least one
operator with a valid special use permit using the tower. Potential
or planned future use of any facility for commercial communication
service is not sufficient to avoid the requirement for removal.
(b)
If the removal of towers and antennas is required, accessory
buildings and other structures shall also be removed unless:
(c)
Each applicant seeking a special use permit for a wireless communications
facility shall provide a written contract with the Town of Martinsburg
agreeing to be fully responsible for removal, and indemnifying the
Town for the costs of removal of antennas, accessory buildings and
supporting structures such as towers when removal is required by the
Town Rural Development Code.
(d)
If a proposed wireless communications facility will be owned
by an entity other than an FCC-licensed carrier which will use that
facility, the carrier shall provide to the Planning Board a copy of
a contract between the facility owner and the FCC-licensed carrier
in which the owner agrees to remove the facility including any tower,
antennas and accessory structures, and indemnify the Town for the
costs of such removal, when these facilities are no longer being used
by an FCC-licensed operator with a valid Town of Martinsburg special
use permit.
(e)
A decision to require removal shall be the responsibility of
the Planning Board after consulting with the Code Enforcement Officer
and the Town Attorney. Removal shall occur within 90 days of the Planning
Board's decision to require removal unless the Planning Board has
agreed to an extension of that time. If not removed within the designated
period, the Town shall have the right to compel removal, with all
costs to be borne by the special use permit holder who owns and/or
previously used the facilities. Removal costs may also be recovered
from the owner of the tax parcel on which the facilities are located.
(f)
When towers are removed, site reclamation shall be completed
to the satisfaction of the Planning Board within 24 months. Reclamation
shall include landscaping, removal of structures, utility lines and
accessory structures, and shall encompass the building site and buffer
area controlled by the facility owner.
(11)
Bonding. Before obtaining or renewing a special use permit,
the applicant shall provide financial surety in an amount acceptable
to the Town Board (in consultation with the Planning Board and the
Attorney for the Town) to ensure full and complete performance of
all conditions imposed by the Planning Board as a requirement of the
special use permit.
B.
Environmental standards.
(1)
Wireless communications facilities shall not be located in wetlands
or in regulated wetland buffer areas, in endangered or threatened
species' habitats, water bodies, or historic or archaeological sites.
(2)
No hazardous waste shall be discharged on the site of any wireless
communications facility. If any hazardous materials are to be used
on site, there shall be provisions for full containment of such materials.
An enclosed containment area shall be provided with a sealed floor,
designed to contain at least 110% of the volume of the hazardous materials
stored or used on the site.
(3)
If applicable, additional stormwater runoff generated by the use
shall be contained on-site.
(4)
Ground-mounted equipment for wireless communications facilities shall
not generate noise in excess of 50 dB at the property line.
C.
Safety standards.
(1)
Radio frequency radiation (RFR) standards. All equipment proposed
for a wireless communications facility shall be authorized per the
FCC guidelines. The owner of the facility shall submit evidence of
compliance with the FCC guidelines on a yearly basis to the Planning
Board. If new, more restrictive standards are adopted by any appropriate
federal or state agency, the facility shall be made to comply or continued
operations may be restricted by the Planning Board. The cost of verification
of compliance shall be borne by the owner and operator of the facility.
(2)
Security barrier. All wireless communications facilities shall be
provided with security measures such as fencing, anti-climbing devices,
electronic monitoring, or other methods sufficient to prevent unauthorized
entry and vandalism. Fencing shall include a locking security gate.
Electrified fence, barbed or razor wire shall be prohibited.
(3)
Structural soundness and fall zone. Wireless communications facilities
shall be designed by a licensed professional engineer to withstand
overturning and failure. In the event of failure, facilities shall
be designed so that they will fall within the setback area of the
site and/or away from adjacent residential properties. The Planning
Board shall require a foundation design and certificate of safety
from the carrier to document structural soundness.
[Amended 4-21-2010 by L.L. No. 2-2010]
A.
The Planning Board is authorized to review and approve, approve with modifications, or disapprove site plans and special use permits pursuant to Articles VI and VII of this chapter. The Planning Board shall have the authority to impose such reasonable conditions and restrictions as are directly related to and incidental to the proposed antenna, mount, or equipment structure(s). Any decision by the Planning Board to deny or approve a request to place, construct, or modify wireless communications facilities shall be in writing and supported by substantial evidence.
B.
Application filing requirements, site plan approval. All applicants for a wireless communications facility shall fulfill the site plan requirements of Article VII of this chapter and shall, in addition, provide the following:
(1)
Proof that the applicant or coapplicant is an FCC-licensed carrier.
(2)
A statement, certified by a professional engineer and approved by
the Planning Board, that the installation of the proposed antenna,
including reception and transmission functions, will not interfere
with the radio or television service enjoyed by adjacent residential
and nonresidential properties or with public safety communications.
(3)
A statement, certified by a professional engineer and approved by
the Planning Board, documenting the structural soundness of the wireless
communications facility.
(4)
Proof that the wireless communications facility shall be fully automated
and requiring only occasional maintenance of the facility and site.
C.
Application filing requirements, special use permit. Applicants for
a special use permit for a wireless communications facility shall
fulfill the requirements of a Type 1 action under SEQR, and shall,
in addition, provide the following:
(1)
A survey of all existing structures, buildings and utility structures
within the Town outlining the opportunities for the use of these existing
structures and buildings as an alternative to the proposed site. The
applicant must demonstrate that the proposed wireless communications
facility cannot be accommodated on an existing structure, building
or utility structure. In the event that location on an existing structure,
building or utility structure is not feasible, a written statement
of the reasons for the unfeasibility shall be submitted to the Planning
Board. The Planning Board may hire an independent technical expert
in the field of radio frequency engineering, to verify if location
on an existing structure, building or utility structure is not feasible
and to evaluate the need for the proposed facility. The cost for such
a technical expert shall be at the expense of the applicant and shall
be fair and in line with similar costs in other communities. The failure
of an applicant to demonstrate a good faith effort to co-locate may
be grounds for denial of the special use permit.
(2)
A Town-wide map showing the locations of all existing and future
wireless communications facilities in the Town for this carrier. The
applicant must demonstrate the need for the proposed facility showing
the impracticality of upgrading or expanding an existing site, and
must project long-range facility expansion needs within the Town based
on market demand. The Planning Board may hire an independent technical
expert in the field of RF engineering, to evaluate the impracticability
of upgrading or expanding an existing site. The cost for such a technical
expert shall be at the expense of the applicant and shall be fair
and in line with similar costs in other communities. The failure of
an applicant to demonstrate a good-faith effort to demonstrate the
impracticality of upgrading or expanding an independent site may be
grounds for denial of a special use permit.[1]
(4)
Proposed security barrier, indicating type and extent as well as
point of controlled entry.
(5)
Drawings, dimensioned and to scale, which show the ultimate appearance
and operation of the wireless communications facility at full buildout,
including representations of the proposed mount, antennas, equipment
shelters, cable runs, driveways, parking areas and any other construction
or development attendant to the wireless communications facility.
If the security barrier will block views of the wireless communications
facility, the barrier drawing shall be cut away to show the view behind
the barrier.
(6)
Materials of the proposed facility specified by generic type and
specific treatment. These shall be provided for the antennas, mounts,
equipment shelters, cables as well as cable runs, and security barrier.
(7)
Colors of the proposed facility represented by a color board showing
actual colors proposed. Colors shall be provided for the antennas,
mounts, equipment shelters, cables as well and cable runs, and security
barrier.
(8)
Landscape plan including existing trees and shrubs, by dominant species
and current height and those proposed to be added, identified by size
of specimen at installation and species.
(9)
The following material shall be provided to allow the Planning Board
to determine the level of visual impact and the appropriateness of
the facility:
(a)
Existing (before condition) color photographs of views of the
site from key viewpoints both inside and outside of the Town, including
but not limited to state highways and other major roads, state and
local parks, other public lands, preserves and historic sites normally
open to the public, scenic roads and scenic viewsheds and from any
other location where the site is visible to a large number of residents
or visitors. The Planning Board shall determine the appropriate key
viewpoints from which the site shall be photographed.[3]
(b)
Proposed (after condition) simulations. Each of the existing
condition photographs shall have the proposed wireless communications
facility superimposed on to it to show what would be seen from the
key viewpoints if the proposed facility is built.
(10)
Within 21 days of filing an application for a special use permit,
the applicant shall arrange for a balloon or crane test at the proposed
site to illustrate the height of the proposed facility. The date,
time and location of such test shall be advertised in a newspaper
of general circulation in the Town at least 14 days, but not more
that 21 days prior to the test.
(11)
A photometric plan of all lighting on the site, including tower
lighting if required.
D.
The Planning Board may waive one or more of the application filing
requirements of this section if it finds that such information is
not needed for a thorough review of a proposed wireless communications
facility, based upon a specific request by the applicant.
E.
Application fee. In addition to other relevant fees outlined in the
Town Fee Schedule, the applicant shall pay an application fee as set
from time to time by Town Board resolution for wireless communications
facilities requiring site plan approval and for wireless communications
facilities requiring a special use permit, due upon submission of
the application to the Planning Board, to defray the costs of review
of the application by the Town.[4]
F.
Consultant fees. The Planning Board and/or Board of Appeals may retain
consultants to assist in reviewing the application, its renewal, or
an application for a variance related to a pending application, with
consultant fees to be paid by the applicant. These consultants may
include the Town Engineer, Town Planner, the Town's Attorney, one
or more commercial communication facility consultants, or other consultants
as determined by the Planning Board and/or Zoning Board of Appeals.
At the beginning of the review process, the applicable board may require
the applicant to fund a separate escrow account from which the Town
may draw to ensure reimbursement of consultant fees. During review
of the application, the applicable board may require the applicant
to add funds to the escrow account, as the applicable board deems
necessary. If the required funds are not added to the escrow account,
review of the application by the applicable board shall be suspended
until such time, if any, as payment of said funds is made. Any remaining
funds in the escrow account after payment of all consultant fees will
be returned to the applicant.
[Amended 4-21-2010 by L.L. No. 2-2010]
All wireless communications facilities requiring a special use
permit shall comply with the following requirements:
A.
Location of other facilities. Applicants shall provide a Town-wide
map showing the location of other existing, approved, and proposed
wireless communications facilities within the Town and all bordering
municipalities outlining opportunities for co-location use as an alternative
to the proposed site.
(1)
The
applicant must demonstrate that the proposed wireless communications
facility cannot be accommodated on an existing, approved, or proposed
communications tower, structure or facility due to one or more of
the following reasons:
(a)
The antenna would exceed the structural capacity of the existing,
approved, or proposed wireless communications facility, as documented
by a qualified professional engineer, and the existing, approved,
or proposed facility cannot be reinforced, modified, or replaced to
accommodate the planned or equivalent antenna at a reasonable cost.
(b)
The antenna would cause interference materially impacting the
usability of other existing, approved or proposed antenna at the facility
as documented by a qualified professional engineer and the interference
cannot be prevented at a reasonable cost.
(c)
Existing, approved, or proposed wireless communications facilities
cannot accommodate the antenna at a height necessary to function as
documented by a qualified professional engineer.
(d)
Other foreseen reasons that make it not feasible to locate the antenna
upon an existing, approved, or proposed wireless communications facility.
(2)
In the event that co-location is not feasible, a written statement
of the reasons for the unfeasibility shall be submitted to the Planning
Board. The Planning Board may hire an independent technical expert
in the field of RF engineering, to verify if co-location is not feasible
and to evaluate the need for the proposed facility. The cost for such
a technical expert shall be at the expense of the applicant and shall
be fair and in line with similar costs in other communities.
B.
Provision for new facilities. Any proposed ground-mounted wireless
communications facility shall be designed, structurally, electrically,
and in all respects, to accommodate both the applicant's antennas
and comparable antennas for at least two additional users if the mount
is over 100 feet in height or for at least one additional user if
the mount is over 60 feet in height. Mounts must be designed to allow
for future rearrangement of antennas upon the mount and to accept
antennas mounted at varying height. The applicant shall submit to
the Planning Board a letter of intent committing the applicant, and
his/her successors in interest, to negotiate in good faith for shared
use of the proposed facility by any wireless service providers in
the future. The issuance of a permit (assuming the facility is approved
according to this section), shall commit the new facility owner and
his/her successors in interest to:
(1)
Respond in a timely comprehensive manner to a request for information
from a potential shared-use applicant.
(2)
Negotiate in good faith concerning future requests for shared use
of the new facility by other wireless service providers.
(3)
Allow shared use of the new facility if another wireless service
provider agrees in writing to pay charges.
(4)
Make no more than a reasonable charge for shared use, based on generally
accepted accounting principles. The charge may include but is not
limited to a pro rata share of the cost of site selection, planning,
project administration, land costs, site design, construction and
maintenance financing, return on equity, and depreciation, and all
of the costs of adapting the facility to accommodate a shared user
without causing electromagnetic interference.
C.
Intermunicipal cooperation. In order to keep neighboring municipalities
informed, and to facilitate the possibility of directing that an existing
wireless communications facility in a neighboring municipality be
considered for shared use, the Planning Board shall require that:
(1)
An applicant who proposes a new wireless communications facility
shall notify in writing the legislative body of each municipality
that borders the Town and the County Planning Board. Notification
shall include the exact location of the proposed facility, and the
general description of the project including, but not limited to,
the height of the facility and its capacity for future shared use.
(2)
Documentation of this notification shall be submitted to the Planning
Board at the time of application.
A modification of a wireless communications facility may be
considered equivalent to an application for a new facility and will
require a special use permit when the following events apply:
The applicant shall maintain the wireless communications facility
in good condition, including, but not limited to: structural integrity
of the mount and security barrier, painting, maintenance of stealth
technology camouflaging, and maintenance of the buffer areas and landscaping.
Communications facilities over 100 feet in height shall be inspected
annually by a professional engineer approved by the Planning Board,
and a copy of the inspection report submitted to the Town of Martinsburg
Code Enforcement Officer.
A.
Any wireless communications facility that is not operated for a continuous
period of 24 months shall be considered abandoned, and the owner of
the facility shall physically remove it within 90 days of a receipt
of notice. "Physically remove" shall include, but not be limited to:
(1)
Removal of antennas, mount, equipment shelters and security barriers
from the subject property.
(2)
Proper disposal of the waste materials from the site in accordance
with local and state solid waste disposal regulations.
(3)
Restoring the location of the facility to its natural condition,
with the exception of landscaping and grading.
B.
If the carrier fails to remove the facility in accordance with this
section of this chapter, the Town will have the authority to enter
the property and remove the facility with the costs of removal assessed
against the property.
A special use permit issued for any wireless communications
facility shall be valid for five years. At the end of that time period,
the wireless communications facility shall be removed by the carrier
or a new special use permit shall be required. In reviewing the new
application for a special use permit, the Planning Board shall determine
whether the technology in the provision of the facility has changed
such that the necessity for the permit at the time of its approval
has been eliminated or modified, and whether the permit should be
modified or terminated as a result of any such change.
Facilities shall be insured by the owner(s) of the towers and/or
the antennas thereon against damage to persons or property. The owner(s)
of the towers and/or antennas thereon shall provide annually to the
Town Clerk a certificate of insurance in the minimum amount of $1,000,000,
or a higher amount if required by the Planning Board in consultation
with the Town Board, in which the Town shall be an additional named
insured. This insurance shall insure against damage or loss arriving
from all structures, towers or antennas on the property.