No land use activity as listed below shall be carried out until a zoning permit has been issued by the Zoning Officer stating that the proposed building, structure, use of land or development activity complies with the requirements of this chapter:
A.
Erection, reerection or movement of a building or structure.
B.
Change of the exterior structural dimensions of a building or structure.
C.
Change in use of land, buildings or structures through the establishment of a new use, or through the expansion or enlargement of an existing use.
D.
The resumption of any use which has been discontinued for a period of 12 months or longer.
E.
Establishment or change in dimensions of a parking area for nonresidential or multiple-family residential uses.
G.
Placement of aboveground or below-ground pools.
H.
Change in the contours of 7,500 square feet or more of land.
[Amended 7-18-1996 by L.L. No. 2-1996]
I.
Construction, replacement or major modification of any on-site sewage disposal system.