Maximum Allowable Spread
| ||
---|---|---|
Street Classification
|
Measured from Street Center Line
(feet)
| |
Arterial
|
12
| |
Collector
|
9
| |
Residential
|
0
|
Estimated Construction Cost
|
Plan Review Fee
| |
---|---|---|
Less than $100,000
|
Cost but not more than $1,250
| |
$100,000 to $250,000
|
1.25%
| |
$250,000 to $500,000
|
1.00% but not less than $3,125
| |
$500,000 to $1,000,000
|
0.75% but not less than $5,000
| |
Greater than $1,000,000
|
0.50% but not less than $7,500
|
Water
|
$6 per foot
| |
Sewer
|
$7 per front foot
| |
Curb and gutter
|
$4.50 per foot
| |
Grading, graveling and paving
|
$9.50 per foot
| |
Establishing sidewalk grade
|
$1 per foot
|