Exciting enhancements are coming soon to eCode360! Learn more 🡪
Township of Susquehanna, PA
Dauphin County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Ord. 74-27, 5/29/1974, § 1; as amended by Ord. 89-16, 11/21/1989]
Unless the context specifically and clearly indicates otherwise, the meaning of terms used in this Part shall be as follows:
AUTHORITY
Township Authority, a Pennsylvania municipality authority.
BUILDING SEWER
The extension from the sewage drainage system of any structure to the lateral of a sewer.
IMPROVED PROPERTY
Any property located within this Township upon which there is erected a structure intended for continuous or periodic habitation, occupancy or use by human beings or animals and from which structure sanitary sewage and/or industrial wastes shall be or may be discharged.
INDUSTRIAL ESTABLISHMENT
Any room, group of rooms, building or other enclosure used or intended for use in the operation of one business enterprise for manufacturing, processing, cleaning, laundering or assembling any product, commodity or article, or from which process waste, as distinct from sanitary sewage, shall be discharged.
INDUSTRIAL WASTES
Any and all wastes discharge from an industrial establishment other than sanitary sewage.
LATERAL
That part of the sewer system extending from a sewer to the property line or, if no such lateral shall be provided, then "lateral" shall mean that portion of or place in a sewer which is provided for connection of any building sewer.
OWNER
Any person vested with ownership, legal or equitable, sole or partial, of any improved property.
PERSON
Any individual, partnership, company, association, society, trust, corporation or other group or entity.
SANITARY SEWAGE
Normal water-carried household and toilet wastes from any improved property.
SEWER
Any pipe, main or conduit constituting a part of the sewer system used or usable for sewage collection purposes.
SEWER SYSTEM
All facilities, as of any particular time, for collecting, pumping, transporting or disposing of sanitary sewage and/or industrial wastes, which are or will be connected to any sewer system maintained and operated within the Township by the Township Authority.
TOWNSHIP
The Township of Susquehanna, Dauphin County, Pennsylvania, a Pennsylvania municipality, acting by and through its Board of Commissioners or, in appropriate cases, acting by and through its authorized representatives.
[Ord. 74-27, 5/29/1974, § 202; as amended by Ord. 81-19, 11/12/1981; and by Ord. 89-16, 11/21/1989]
The owner of any improved property abutting or adjoining any street, road, lane, alley, court, public square, highway, or easement in which a sewer constituting a part of a sewer system is located, shall connect such improved property therewith, in such manner as this Township may require, within 60 days after notice to such owner from this Township to make such connection, for the purpose of discharge of all sanitary sewerage and industrial waste from such improved property. Single-family residences are exempted from the requirement to connect, if the structure is 300 feet or more from said sewer line. Use of the sewer system is subject to such limits and restrictions as shall be established herein or otherwise shall be established by this Township from time to time.
[Ord. 74-27, 5/29/1974, § 3]
1. 
No connection shall be made to a sewer system unless the manner in which the connection is made and the materials and workmanship employed in effecting such connection shall comply with the requirements of the Plumbing Code adopted by the Township and with the rules and regulations of the Township then in effect. It shall also be necessary for all connections to comply with any special requirements imposed in this Part.
2. 
No person shall be permitted at any time to make a connection to a sewer system or to work upon or repair or replace any part of the sewer system unless such person shall be licensed to do plumbing work by the Township.
3. 
Any connection made to a sewer system by persons not licensed, as hereinbefore required, may be disconnected from the sewer system and the Township specifically reserves the right to refuse to render sewer service unless and until a proper connection is made by a duly qualified person. In the event it shall be necessary for the Township to disconnect a property from the sewer system under this section, the cost of such work as is required to be done by the Township may be charged against the property owner and/or the person making such improper connection.
4. 
No person who has obtained a permit and made a connection to a sewer system shall connect or cause or permit to be connected to the sewer lateral for which a permit has been issued, another sewer lateral for the service of other properties or property. (It is the intention of this section to require a separate and distinct permit and sewer connection for each individual building or house whether constructed as a single-detached unit or as one of a pair or row of houses or buildings; provided, however, a single connection may be permitted to serve a school, a factory, an apartment house or other permanent multiple-unit structure where the entire property served through a single connection could not under prevailing circumstances be split into two or more separate and sole ownerships.)
5. 
All connections to a sewer system shall comply with the requirements of the Plumbing Code of Susquehanna Township in force at the time such connection is made, and regardless of the requirements of the Plumbing Code, all sewer laterals and connections shall be constructed of the following materials and/or their equal in quality as determined by the Township Engineer.
A. 
Vitrified clay, concrete, asbestos, cement or cast iron pipe which shall have permanently tight joints which shall prevent the admission of ground water and be laid at a minimum grade of W for each foot and shall have the best possible alignment and sufficient cover to protect the pipe from frost or crushing from surface activity.
B. 
Where connections are made with cast iron pipe, the pipe shall be of a minimum inside diameter of four inches and in the case of all other authorized materials the minimum inside diameter shall be six inches.
6. 
A sewer connection and the lateral leading from the property to an interceptor or collection sewer shall at all times be the responsibility of the person owning the property for maintenance, repair or replacement.
7. 
No connection shall be made to a sewer system or the trench covered or backfilled unless and until the lateral and connection have been inspected and approved by one of the following: the Township Engineer; the Maintenance Supervisor for the Township; the Plumbing Inspector of Susquehanna Township; the Authority engineer; or the superintendent of the Township Authority.
8. 
Whenever, in the option of the Township Engineer or other duly authorized representative of the Township, special conditions require additional safeguards or more stringent specifications to be observed, then, and in that event notwithstanding any other provisions of this ordinance or requirements of the Township Plumbing Code, the Township specifically reserves the right to refuse to permit a connection to be made to a sewer system until such special requirements or specifications as may be stipulated by the Township or its Engineer have been satisfied.
[Ord. 74-27, 5/29/1974, § 4]
If the owner of any improved property located in the area of this Township served by a sewer system and abutting on or adjoining any street, road, lane, alley, court, public square or highway in which a sewer constituting a part of a sewer system is located, after 60 days notice from this Township, in accordance with § 202, shall fail to connect such improved property, as required, this Township may make such connection and may collect from such owner the costs and expenses thereof. In such case, this Township shall forthwith, upon completion of the work, send an itemized bill of the cost of the construction of such connection to the owner of the improved property to which connection has been so made, which bill shall be payable forthwith. In case of neglect or refusal by the owner of such improved property to pay said bill, this Township shall file a municipal lien for said construction within six months of the date of the completion of the construction of said connection, the same to be subject in all respects to the general law provided for the filing and recovery of municipal liens.
[Ord. 74-27, 5/29/1974, § 5]
All sanitary sewage and industrial wastes from any improved property, after connection of such improved property with a sewer as required under § 18-202, shall be conducted into a sewer, subject to such limitations and restrictions as shall be established herein or otherwise shall be established by this Township, from time to time.
[Ord. 74-27, 5/29/1974, § 6; as amended by Ord. 89-16, 11/21/1989]
1. 
No person shall place or deposit or permit to be placed or deposited upon public or private property within the area of this Township served by a sewer system any sanitary sewage or industrial wastes in violation of § 18-202.
2. 
No person shall discharge or permit to be discharged to any natural outlet within the area of this Township served by a sewer system any sanitary sewage or industrial wastes in violation of § 18-202.
[Ord. 98-11, 3/12/1998; as amended by Ord. 08-20, 11/13/2008; and by Ord. 11-08, 7/14/2011]
The Township of Susquehanna hereby adopts, for the purpose of establishing rules and regulations for pretreatment of wastewater, the recodified ordinances of the City of Harrisburg contained in Title 9, Streets, Utilities and Public Services, Part 5, Sewers and Sewage, as amended September 11, 2007, in Bill 34 of 2007, and as amended by action of City Council October 27, 2010 [which amendment adds definitions for pollution, polychlorinated biphenyls (PCBs) T and pretreatment or treatment and which sets specific discharge limitations into wastewater collection or conveyance to the wastewater collection or conveyance system of certain pollutants], of which copies have been and are now filed in the offices of Susquehanna Township, and the same are hereby adopted and incorporated as fully as if set out at length herein. From the date on which this amendment shall take effect, the provisions thereof shall be controlling in the pretreatment of wastewater, and in all other subjects therein contained, within the corporate limits of Susquehanna Township.
[Ord. 74-27, 5/29/1974, § 7]
1. 
No privy vault, cesspool, sinkhole, septic tank or similar receptacle shall be used or maintained at any time upon any improved property which has been connected to a sewer or which shall be required under § 18-202 to be connected to a sewer.
2. 
Every such privy vault, cesspool, sinkhole, septic tank or similar receptacle in existence shall be abandoned and, at the discretion of this Township, shall be cleansed and filled under the direction and supervision of this Township; and any such privy vault, cesspool, sinkhole, septic tank or similar receptacle not so abandoned and, if required by this Township, cleansed and filled, shall constitute a nuisance and such nuisance may be abated as provided by law, at the expense of the owner of such improved property.
[Ord. 74-27, 5/29/1974, § 8]
No privy vault, cesspool, sinkhole, septic tank or similar receptacle shall at any time be connected with a sewer.
[Ord. 74-27, 5/29/1974, § 9]
The notice by this Township to make a connection to a sewer, referred to in § 18-202 shall consists of a written or printed document requiring such connection in accordance with the provisions of this Part and specifying that such connection shall be made within 60 days from the date such notice is given. Such notice may be given at any time after a sewer is in place which can receive and convey sanitary sewage and industrial wastes for treatment and disposal from the particular improved property. Such notice shall be served upon the owner either by personal service or by registered or certified mail or by such other method as at the time may be provided by law.
[Ord. 74-27, 5/29/1974, § 10]
Except as otherwise provided in this Section, each improved property shall be connected separately and independently with a sewer through a building sewer. Grouping of more than one improved property on one building sewer shall not be permitted, except under special circumstances and for good sanitary reasons or other good cause shown, and then only after the special permission of this Township, in writing, shall have been secured.
[Ord. 74-27, 5/29/1974, § 11]
All costs and expenses of construction of a building sewer and all costs and expenses of connection of a building sewer to a sewer shall be borne by the owner of the improved property to be connected; and such owner shall indemnify and save harmless this Township from all loss or damage that may be occasioned, directly or indirectly, as a result of construction of a building sewer or of connection of a building sewer to a sewer.
[Ord. 74-27, 5/29/1974, § 12]
1. 
A building sewer shall be tapped to a sewer at the place designated by the Township and where the lateral is provided.
2. 
The invert of a building sewer at the point of tapping shall be at the same or a higher elevation than the invert of the sewer. A smooth, neat joint shall be made and the tapping of a building sewer to the lateral shall be made secure and watertight.
3. 
In providing sanitary facilities for structures in the Township where a lateral sewer line does not exist, the sanitary sewer must be carefully tapped, and a banded-type or rod-type sewer saddle shall be installed on the top quarter of the main or trunk line. The entire main and tap shall be filled with a cover of a one to four mix portland cement and sand for the entire width of the ditch.
4. 
No sanitary sewer taps shall be made in any manhole of the sewer system.
[Ord. 74-27, 5/29/1974, § 13]
Where a sewer ditch has been excavated below the installed grade of a building sewer (undercut), the ditch must be bottomed with a #1 or #2 stone to the bottom barrel of the pipe.
[Ord. 74-27, 5/29/1974, § 14]
Where an improved property, at the time connection to a sewer is required, shall be served by its own sewage disposal system or device, the existing house sewer line shall be broken on the structure side of such sewage disposal system or device and attachment shall be made, with proper fittings, to continue such house sewer line, as a building sewer.
[Ord. 05-09, 7/14/2005, § 1]
After connection of improved property to the public sanitary sewer system, no privy vault, cesspool, sinkhole, septic tank or similar receptacle shall be used and maintained at any time upon any improved property which has been connected to a sewer or sewer system. Such privy vault, cesspool, sinkhole, septic tank or similar receptacle in existence shall be abandoned, at the discretion of the Township, and shall be cleansed and filled at the expense of the owner of such improved property under the direction and supervision of the Authority; and any such privy vault, cesspool, sinkhole, septic tank or similar receptacle not so abandoned and, if required by the Authority, cleansed and filled, shall constitute a nuisance, and such nuisance may be abated as provided by law, or as set forth in this Part of the Codified Ordinances at the expense of the owner of such improved property.
[Ord. 74-27, 5/29/1974, § 15]
No building sewer shall be covered until it has been inspected and approved by this Township. If any part of a building sewer is covered before so being inspected and approved, it shall be uncovered for inspection at the cost and expense of the owner of the improved property to be connected to a sewer.
[Ord. 74-27, 5/29/1974 § 16; as amended by Ord. 98-26, 10/8/1998]
Every building sewer and service lateral of any improved property shall be maintained in a proper sanitary and safe operating condition free from need of replacement or repair by the owner of such improved property.
[Ord. 74-27, 5/29/1974, § 17]
Every excavation for a building sewer shall be guarded adequately with barricades and lights to protect all persons from damage and injury. Streets, sidewalks and other public property disturbed in the course of installation of a building sewer shall be restored, at the cost and expense of the owner of the improved property being connected, in a manner satisfactory to this Township.
[Ord. 74-27, 5/29/1974, § 18]
If any person shall fail or refuse, upon receipt of a notice of this Township, in writing, to remedy any unsatisfactory condition with respect to a building sewer, within 60 days of receipt of such notice, this Township may refuse to permit such person to discharge sanitary sewage and industrial wastes into a sewer system until such unsatisfactory conditions shall have been remedied to the satisfaction of this Township.
[Ord. 74-27, 5/29/1974 § 19; as amended by Ord. 98-26, 10/8/1998]
Notwithstanding § 216 above, in the event that the Authority, in its sole discretion and judgment, determines that removal of infiltration/inflow (I/I) from leaks in building sewers and/or service laterals, for any particular drainage basin, as determined by the Authority, may be a general benefit of the sewer system, the Authority may elect to assume responsibility for the repair, and the attendant cost thereof, of building sewers and service laterals to the extent necessary to eliminate the infiltration/inflow source(s).
[Ord. 74-27, 5/29/1974 § 20; as amended by Ord. 89-16, 11/21/1989]
1. 
Whenever any person desires the extension of the facilities of a sewer system to service new areas not theretofore connected to said sewer system, such person may, at any regular meeting of the Authority, present a petition to the Authority requesting said extension, which petition must be signed by the owners of not less than 51% in footage fronting on the proposed extension, and said petition shall set forth the total number of feet of sewer extension required under said request, the total number of potential customers then located along the proposed extension, setting forth whether said customers are residential, commercial or industrial, and the increase of customers, if any, which may be immediately anticipated. Upon receipt of such petition, the Authority may undertake the extension of its facilities if and only if such extension is economically feasible in the opinion of the consulting engineer for the Authority. Should the Authority, upon receipt of such petition and consideration thereof, and in the exercise of its discretion, determine that such extension shall not be made, notice of such determination shall be given to the person or persons submitting the petition.
2. 
Wherever extensions or additions to a sewer system are desired, and are not made under subsection (1) of this section, the same may be made as follows:
A. 
Extensions made by the Authority Upon application of any person, and where possible, the Authority will, at the cost of the applicant, extend its lines to service whatever areas may be required for the accommodations of such applicant, provided that the applicant shall pay the total cost to the Authority of such extension or extensions, including the cost of design of the extension by the Authority engineer, the cost of all permits which may be required, the cost of inspection during construction, and the cost of construction itself. The total cost of extensions or additions as estimated by the consulting engineer for the Authority shall be deposited with the Authority in a special account and held by the Authority only for the purpose of paying the costs involved in the extension contemplated. Upon completion of the extension or addition under this subsection (A), the costs of said extension shall be adjusted, and upon adjustment, any excess remaining in the special fund shall be returned to the applicant, and to the extent, if any, that the total cost shall have exceeded the estimate, the applicant shall make up the deficiency. No sewer service will be rendered by the Authority through such extension or addition until the total cost thereof shall have been paid.
B. 
Extensions not designed and installed by the Authority Plans and specifications for extensions and additions to a sewer system may be prepared by qualified persons other than the consulting engineer for the Authority, provided that the plans and specifications so prepared shall be submitted for approval of the consulting engineer for the Authority, and provided further that no construction shall be undertaken until such plans and specifications are approved and until a permit is issued by the Sanitary Water Board for the proposed extension. The reasonable cost of reviewing and approving plans and specifications imposed upon the Authority by its consulting engineer shall be paid by the applicant before final approval of plans and specifications is given.
(1) 
Extensions to a sewer system may be constructed by any applicant or his contractor in accordance with plans and specifications approved as hereinbefore required, provided, however, that such construction shall be done under the supervision of the consulting engineer for the Authority or such other person as the Authority may designate. Such supervision shall consist of regular inspections during construction, the cost of which shall be paid by the applicant. After approval of plans and specifications and before construction has commenced, the applicant shall post a bond with the Authority in an amount to be set by the Authority to insure the payment to the Authority of all obligations due it under this Part, including the cost of reviewing and approving plans (if that cost has not already been paid), the cost of inspection and the cost of replacing or repairing any part of the system which has not been constructed in a manner satisfactory to the Authority. In lieu of posting a bond, the applicant may deposit with the Authority a sum of money representing the estimated costs of the items for which the bond may be required which money, if deposited, shall be held by the Authority solely for the payment of these items. Upon completion of construction any excess money remaining from the deposit made shall be returned to the applicant and to the extent, if any, that the costs involved shall have exceeded the amount deposited, the applicant shall immediately pay to the Authority the amount of the deficiency.
(2) 
Whenever sewers are installed by persons other than the Authority, the installation and materials shall be made and furnished to the satisfaction of the Authority and in accordance with the rules and regulations of the Authority. In the event that the person installing a sewer extension fails to comply with the requirements of the Authority, the Authority shall give notice, in writing, of such noncompliance and in the event that the person so installing the extension shall fail to replace or repair the installation with respect to which notice of noncompliance has been received, the Authority may take whatever measures are necessary to conform the installation to the requirements of the Authority and charge the cost thereof against the bond or cash deposit made by the applicant.
C. 
As a condition to the approval of plans and specifications for extensions to a sewer system, to be built by builders, developers or other agencies, and prior to the commencement of construction of said extensions, the owner of the property through which the extension is to be made shall execute an agreement with the Authority under which the owner agrees upon the completion of the extension to offer to the Authority a deed of dedication to the collection system to be installed, which deed shall convey all right, title and interest in the collection lines to the Authority free and clear of all encumbrances and charges. The agreement to be signed in this connection shall specifically provide that in the event a deed of dedication is not offered to the Authority, the Authority shall be entitled to specific performance of the agreement and the cost of enforcing the agreement, including reasonable attorney's fees, shall be paid by the defaulting party and shall be made a part of the order of the court in granting specific performance.
3. 
Applicants under subsections (1) or (2) of this section shall in all cases pay the cost of securing a permit, if required, from the Bureau of Water Quality Management of the Department of Environmental Resources of the Commonwealth of Pennsylvania, including the cost of preparing the necessary reports required to obtain such permit, and no service shall be rendered on any additions or extensions until such costs shall have been paid.
[Ord. 74-27, 5/29/1974, § 21]
This Authority reserves the right to adopt, from time to time, additional rules and regulations as it shall deem necessary and proper relating to connections with a sewer and a sewer system, which additional rules and regulations, to the extent appropriate, shall be and shall be construed as part of this Part.
[Ord. 74-27, 5/29/1974, § 22]
For the purpose of enforcing the rules and regulations of the Authority with respect to the operation of a sewer system and for the purpose of advancing and protecting the public health, the Authority reserves the right to enter upon the premises of any person connected to a system for the purpose of inspecting the sewer facilities located thereon and for the purpose of determining compliance with the requirements of the Authority. In the event that the Authority's duly authorized representatives are denied access to any customer's premises for these purposes, the Authority reserves the right to discontinue sewer service to such premises until inspection is permitted and compliance with the requirements of the Authority has been determined.
[Ord. 74-27, 5/29/1974, § 23]
Notwithstanding any other provisions or implications of this Part to the contrary, the Authority reserves the right at all times to refuse to render or to continue to render sewer service to any property or through any lines whenever it appears that the connection of the property to a sewer system has been improperly made or whenever it appears there has been a violation of the rules and regulations of the Authority with respect to the installation of the sewage disposal facilities. In the event that the Authority shall elect to discontinue service to any user connected to its lines, the Authority shall give 10 days written notice by certified mail to the user prior to disconnecting the property from the sewer system.
[Ord. 74-27, 5/29/1974, § 24]
All connections made to a sewer system previous to the enactment of this Part, and in compliance with the rules and regulations then in effect for that sewer system, are hereby approved. However, all future connections and repairs of connections shall be made in compliance with the provisions of this Part.
[Ord. 74-27, 5/29/1974, § 25; as amended by Ord. 89-16, 11/21/1989]
Any person, firm or corporation who shall violate any provision of this Part shall, upon conviction thereof, be sentenced to pay a fine of not more than $1,000 and costs, or in default of payment thereof, shall be subject to imprisonment for a term not to exceed 30 days. Each day that a violation of this Part 2 continues shall constitute a separate offense.