[HISTORY: Adopted by the Board of Commissioners of Susquehanna
Township 10/14/2010 by Ord. 10-13. Amendments noted where applicable.]
Table of Contents
Table of Contents
- INTRODUCTION
- Ch FWD Foreword
- Ch AO Adopting Ordinance
- Ch FEES Fee Resolution
- MUNICIPAL CODE
- Ch 1 Administration and Government
- Ch 2 Animals
- Ch 3 Bicycles
- Ch 4 Buildings
- Ch 5 Code Enforcement
- Ch 6 Conduct
- Ch 7 Fire Prevention and Fire Protection
- Ch 8 Floodplains
- Ch 9 Grading and Excavation
- Ch 10 Health and Safety
- Ch 11 Housing
- Ch 12 Libraries
- Ch 13 Licenses, Permits and General Business Regulations
- Ch 14 Mobile Homes and Mobile Home Parks
- Ch 15 Motor Vehicles
- Ch 16 Parks and Recreation
- Ch 17 Plumbing
- Ch 18 Sewers and Sewage Disposal
- Ch 19 Stormwater Management
- Ch 19 Pt 1 GENERAL PROVISIONS
- ยงย 19-101 Short Title.
- ยงย 19-102 Statement of Findings.
- ยงย 19-103 Purpose.
- ยงย 19-104 Statutory Authority.
- ยงย 19-105 Applicability.
- ยงย 19-106 Repealer.
- ยงย 19-107 Severability.
- ยงย 19-108 Compatibility with Other Ordinance Requirements.
- ยงย 19-109 Duty of Persons Engaged in the Development of Land.
- ยงย 19-110 Township Liability.
- Ch 19 Pt 2 DEFINITIONS
- ยงย 19-201 Word usage.
- ยงย 19-202 Terms Defined.
- Ch 19 Pt 3 STORMWATER MANAGEMENT STANDARDS
- ยงย 19-301 General Requirements.
- ยงย 19-302 Exemptions/Modifications.
- ยงย 19-303 Volume Controls.
- ยงย 19-304 Rate Controls.
- ยงย 19-305 Downstream Hydraulic Capacity Analysis.
- Ch 19 Pt 4 EROSION AND SEDIMENTATION STANDARDS
- ยงย 19-401 Erosion and Sedimentation Requirements During Earth Disturbance Activities.
- ยงย 19-402 Total Maximum Daily Load (TMDL) Requirements.
- Ch 19 Pt 5 DESIGN CRITERIA
- ยงย 19-501 Design Criteria for Stormwater Management and Drainage Facilities.
- ยงย 19-502 Calculation Methodology.
- Ch 19 Pt 6 SWM SITE PLAN AND REPORT REQUIREMENTS
- ยงย 19-601 General Requirements.
- ยงย 19-602 SWM Site Plan and Report Contents.
- ยงย 19-603 SWM Site Plan and Report Submission.
- ยงย 19-604 SWM Site Plan and Report Review.
- ยงย 19-605 Modification of Plans.
- ยงย 19-606 Resubmission of Disapproved SWM Site Plan and Report.
- ยงย 19-607 Authorization to Construct and Term of Validity.
- ยงย 19-608 Record Drawings, Completion Certificate and Final Inspection.
- Ch 19 Pt 7 EASEMENTS
- ยงย 19-701 Easements.
- Ch 19 Pt 8 MAINTENANCE RESPONSIBILITIES
- ยงย 19-801 Financial Guarantee.
- ยงย 19-802 Maintenance Responsibilities.
- ยงย 19-803 Maintenance Agreement for Privately Owned Stormwater Facilities.
- Ch 19 Pt 9 INSPECTIONS
- ยงย 19-901 Schedule of Inspections.
- ยงย 19-902 Right of Entry.
- Ch 19 Pt 10 ENFORCEMENT AND PENALTIES
- ยงย 19-1001 Notification.
- ยงย 19-1002 Enforcement.
- ยงย 19-1003 Public Nuisance.
- ยงย 19-1004 Suspension and Revocation.
- ยงย 19-1005 Penalties.
- ยงย 19-1006 Appeals.
- Ch 19 Pt 11 PROHIBITIONS
- ยงย 19-1101 Prohibited Discharges and Connections.
- ยงย 19-1102 Roof Drains.
- ยงย 19-1103 Alteration of BMPs.
- Ch 19 Pt 12 FEES AND EXPENSES
- ยงย 19-1201 General.
- ยงย 19-1202 Expenses Covered by Fees.
- ยงย 19-1203 Recording of Approved SWM Site Plan and Related Agreements.
- Ch 20 Garbage and Refuse
- Ch 21 Streets and Sidewalks
- Ch 22 Subdivision and Land Development
- Ch 23 Swimming Pools
- Ch 24 Taxation, Special
- Ch 25 Trees
- Ch 26 Water
- Ch 27 Zoning
- Ch 28 Official Map
- APPENDIX
- Apx A Annexation of Territory
- Apx B Bond Issues and Loans
- Apx C Franchises and Services
- Apx D Governmental and Intergovernmental Affairs
- Apx E Plan Approval
- Apx F Public Property
- Apx G Sewers
- Apx H Streets and Sidewalks
- Apx I Water
- Apx J Zoning; Prior Ordinances
- KEY TO THE DISPOSITION OF ALL ORDINANCES
- Ch KO Key to the Disposition of All Ordinances (and Significant Resolutions)
Public Documents