Whenever a subdivision of land or land development is desired
to be effected in the Township of Susquehanna, Dauphin County, Pennsylvania,
a plan of the layout of such subdivision or land development shall
be prepared, filed and processed according to the requirements of
this Chapter.
Where six or fewer lots are proposed to be subdivided from a tract of land or where land is being transferred to be combined with an existing lot, the Board of Commissioners, being advised by the Planning Commission, in response to a written request by the applicant, may waive the requirements of preliminary plan requirements, provided such proposal is on an existing street and no new streets are involved. In such cases the applicant shall submit a final plan as follows: The final plan shall be submitted and processed as required by §
22-406, Final Plans: Procedure, and contain the following data and plan specifications:
A. Submit an erosion and sedimentation control plan as required by the Pennsylvania Clean Streams Law, and the Pennsylvania Department of Environmental Protection, Erosion Control Rules and Regulations (Title 25, Part
1, Subpart C, Article II, Chapter 102), with the erosion control measures set forth in the Erosion and Sediment Pollution Control Manual prepared by the Department of Environmental Protection.
B. Ten copies and one reproducible sepia of the plan prepared by a registered
surveyor or engineer on sheets no larger than 24 inches by 36 inches
clearly labeled "Final Plan" shall be submitted containing the following
information:
(1)
Outline of the property from which the lot or lots are being
subdivided.
(2)
Bearings and distances of the property taken from the property
deed, including the primary control point.
(3)
Adjacent landowners' names.
(4)
Location on the property map of existing streets, streams, and
woods.
(5)
A separate drawing of the proposed lot (scale one inch equals
100 feet) with lot area, lot number, lot dimensions, bearings and
distances of lot lines, existing street right-of-way and street name
and number, building setback lines and contours, with a five-foot
interval.
(6)
A location map on the plan (minimum scale one inch equals 1,000
feet) showing property location, streets and other pertinent information.
(7)
Name of the Zoning District in which the site is located.
(8)
Additional data required on the plan:
(a)
Name, address, and telephone number of owner or applicant.
(b)
Name, address, and telephone number and seal of professional
engineer certifying engineering aspects and professional land surveyor
certifying accuracy of plan survey (as defined herein). (Example contained
in Exhibit I herein.)
(c)
Date of plan preparation.
(d)
Municipality where property is located.
(f)
Certification of ownership and dedicatory statement signed by
owner. (Example contained in Exhibit I herein.)
(g)
Notary public and recording statement. (Example contained in
Exhibit I herein.)
(h)
Approval blocks to be signed by the Planning Commission and
the Board of Commissioners. (Example contained in Exhibit II herein.)
(i)
Location and description of survey monuments shown on the plan.
(j)
Proposed protective covenants running with the land, if any.
(k)
Reference to recorded subdivision plans of adjoining planned
land and by recorded name, date and number.
(l)
When applicable, a copy of the Sewage Module for Land Development
or other equivalent documentation approved by the Department of Environmental
Protection in compliance with the requirements of the Pennsylvania
Sewage Facilities Act and Chapter 71 of Title 25 of the Pennsylvania
Code.
(m)
Compliance with § 22-405(1)(A)(13) and § 22-405(1)(A)(14)
of this Chapter pertaining to applications located in a flood hazard
area.
(n)
Such other data as may be required by the Planning Commission
or Board of Commissioners in the enforcement of this Chapter.