On or before the date on which the preliminary or final plan
is to be considered by the Board of Commissioners, the applicant shall
pay by a check, payable to Susquehanna Township, an amount determined
or approved by the Municipal Engineer sufficient to cover the costs
of:
A. Reviewing the plan's engineering details.
B. Inspecting the site layout for conformance with the plan.
C. Preparing cost estimates of required improvements (as applicable).
D. Inspecting required improvements during installation.
E. Final inspection on completion of installation of required improvements.
F. Other engineering verifications required by this Chapter.