Exciting enhancements are coming soon to eCode360! Learn more 🡪
Borough of Hamburg, PA
Berks County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Ord. 741-06, 10/23/2006]
This Part shall be known as and may be referred to, in short, as the "Borough of Hamburg On-Lot Sewage Ordinance."
[Ord. 741-06, 10/23/2006]
The purposes of this Part shall include:
A. 
The regulation of soil testing for installation, inspection, operation, rehabilitation, replacement, and timely ongoing maintenance of on-lot sewage disposal systems ("OLDS") within the Borough.
B. 
The establishment of provisions and safeguards for the Borough which enable the issuance of permits for bonded systems and individual residential spray irrigation systems ("IRSIS") by and through the Sewage Enforcement Officer ("SEO").
C. 
The establishment of minimum standards for the periodic pumping of treatment and pump tanks which are components of an OLDS permitted by the SEO.
D. 
The adoption, by reference, of standards for initial inspection and subsequent pumping of systems and tanks.
E. 
The establishment of standards for the proper abandonment of an OLDS.
[Ord. 741-06, 10/23/2006]
The terms, when used in this Part, shall mean the following:
ABSORPTION AREA
A component of an individual or community OLDS, where liquid from a treatment tank seeps into the soil, which shall consist of an aggregate-filled area containing piping for the distribution of liquid and the soil or a sand/soil combination located beneath the aggregate.
ABSORPTION AREA EASEMENT
A portion of a lot, tract or parcel that encompasses the primary and replacement area and which shall be delineated and preserved. The primary and replacement areas need not be contiguous.
ACT
The Act of January 24, 1966, P.L. 1535, as amended, 35 P.S. § 750.1 et seq., which is known as the "Pennsylvania Sewage Facilities Act."
AUTHORIZED AGENT
A certified sewage enforcement officer (SEO), professional engineer, or sanitarian, plumbing inspector, soil scientist, water quality specialist, or any other person who is designated to carry out the provisions of this Part as the agent of the Borough Council of the Borough of Hamburg.
BONDED DISPOSAL SYSTEM
An individual sewage system located on a single lot serving a single-family residence, where soil mottling is within 20 inches of the mineral soil surface, and the installation, operation, and replacement of which is guaranteed by the property owner.
BOROUGH
The Borough of Hamburg, Berks County, Pennsylvania.
CHISEL PLOW
A farm or tractor implement used to "rough up" or scarify the soil surface, break down surface vegetation, and increase the soil surface area.
COMMUNITY SYSTEM
A system, whether publicly or privately owned, for the collection of sewage or industrial wastes of a liquid nature from two or more lots and for the treatment or disposal of the sewage or industrial waste on one or more of the lots or at any other site.
COUNCIL
The Borough Council of the Borough of Hamburg, Berks County, Pennsylvania.
DEP/THE DEPARTMENT
The Department of Environmental Protection of the Commonwealth of Pennsylvania.
DEVELOPER
Any person, partnership, or corporation which erects or contracts to erect a building on property owned by it, with the intent to sell the building to some other party upon its full or partial completion or upon the conveyance of property on which the building is to be built.
EQUIVALENT DWELLING UNIT (EDU)
For the purpose of determining the number of lots in a subdivision or land development, that part of a multiple-family dwelling, commercial, industrial, or institutional establishment with sewage flows equal to 400 gallons per day.
INDIVIDUAL ON-LOT SEWAGE SYSTEM
An individual sewage system that uses a system of piping, tanks, or other facilities for the collecting, treating, and disposing of sewage into a soil-absorption area or retaining tank.
INDIVIDUAL RESIDENTIAL SPRAY IRRIGATION SYSTEM (IRSIS)
An individual sewage system that serves a single-family dwelling and that treats and disposes of sewage using a system of piping, treatment tanks, and soil renovation through spray irrigation.
INDIVIDUAL SEWERAGE SYSTEM
An individual sewage system which uses a method of collection, conveyance, treatment, and disposal other than renovation in a soil-absorption area or retention in a retaining tank.
INDUSTRIAL WASTE
A liquid, gaseous, radioactive, solid or other substance, which is not sewage, resulting from manufacturing or industry or other plant or works and mine drainage, silt, coal mine solids, rock, debris, dirt and clay from coal mines, coal collieries, breakers or other coal processing operations. The term includes substances whether or not generally characterized as waste.
MALFUNCTION
The condition which occurs when an on-lot system causes pollution to the ground or surface waters, contamination of private or public drinking water supplies, nuisance problems or a hazard to the public's health.
MARGINAL CONDITIONS
A property shall be deemed to exhibit "marginal conditions" if it displays any of the following characteristics:
A. 
Gross lot size of less than one and five-tenths acre.
B. 
Wetlands.
C. 
Floodplain.
D. 
Limiting zones of less than 20 inches to evidence of seasonal highwater table or rock.
E. 
Slopes in excess of 25%.
F. 
Isolation limitations that would limit available space for OLDS or reduce the net lot size to less than one and five-tenths acre.
ON-LOT SEWAGE DISPOSAL SYSTEM ("OLDS")
Individual or community on-lot sewage disposal systems.
OWNER
Any person, corporation, partnership, etc. holding deed or title to lands within the Borough.
PLANNING MODULE FOR LAND DEVELOPMENT
A revision to, or exception to the revision of, the Official Plan, submitted in accordance with DEP regulations and in connection with the request for approval of a subdivision or land development plan.
PRIMARY AREA
An area on a lot, tract, or parcel of land that has been tested by the SEO and found suitable, based upon the then-current DEP site requirements, for the installation of an OLDS and which will be preserved and protected from alteration for installation of the initial OLDS for the sewage generated on that lot, tract, or parcel. (See "replacement area.")
REPLACEMENT AREA
An area on a lot, tract, or parcel of land, separate from the primary area, that has been tested by the SEO and found suitable, based upon the then-current DEP site requirements, for the installation of an on-lot system and which will be preserved and protected from alteration for potential future use if the primary area on the same lot, tract, or parcel shall fail for any reason. (See "primary area.")
RETAINING TANK
A watertight receptacle which receives and retains sewage and is designed and constructed to facilitate ultimate disposal of the sewage at another site. This term includes but is not limited to the following:
A. 
CHEMICAL TOILETA permanent or portable nonflushing toilet using chemical treatment in the retaining tank for odor control.
B. 
HOLDING TANKA tank, whether permanent or temporary, to which sewage is conveyed by a water-carrying system.
C. 
PRIVYA tank designed to receive sewage where water under pressure is not available.
D. 
INCINERATING TOILETA device capable of reducing waste material to ashes.
E. 
COMPOSTING TOILETA device for holding and processing human and organic kitchen waste which employs the process of biological degradation through the action of microorganisms to produce a stable, humus-like material.
F. 
RECYCLING TOILETA device in which the flushing medium is restored to a condition suitable for re-use in flushing.
SEPTAGE
The residual scum, sludge, and other materials pumped from septic or aerobic treatment tanks and the systems which they serve.
SEWAGE
Any substance that contains any waste products or excrement or other discharge from the bodies of human beings or animals. It shall also refer to a substance harmful to the public health, an animal or aquatic life, or the use of water for domestic water supply or for recreation, or a substance that constitutes pollution to the waters of the Commonwealth under the Clean Streams Law, as amended 35 P.S. § 691.1001 et seq.
SOIL SCIENTIST
A practicing Pennsylvania ARC PAC or PAPSS certified soils professional qualified for on-lot sewage evaluations.
TREATMENT TANK
A watertight tank designed to retain sewage long enough for satisfactory bacterial decomposition of the solids to take place. The term includes the following:
A. 
SEPTIC TANKA treatment tank that provides for anaerobic decomposition of sewage prior to its discharge to an absorption area.
B. 
AEROBIC SEWAGE TREATMENT TANKA mechanically aerated treatment tank that provides aerobic biochemical stabilization of sewage prior to its discharge to an absorption area.
WATERS OF THE COMMONWEALTH
Rivers, streams, creeks, rivulets, impoundments, ditches, watercourses, storm sewers, lakes, dammed water, ponds, springs, and other bodies or channels of conveyance of surface and underground water, or parts thereof, whether natural or artificial, within or on the boundaries of the Commonwealth of Pennsylvania.
[Ord. 741-06, 10/23/2006]
This section shall require all permits herein to be acquired in coordination with all necessary building permits and DEP permitted systems.
A. 
All individual or community OLDS, regardless of the size of the lot, tract or parcel on which they are proposed to be constructed, are subject to the issuance of a permit by the SEO pursuant to the requirements of this Part and the Act.
B. 
Building and zoning permits shall not be issued for any building or improvement to real property to be serviced by an OLDS prior to receiving a permit for the installation of the OLDS from the SEO.
C. 
All sewage system components, including absorption areas, must be located on the same lot, tract or parcel as the structure they will serve. Systems or components cannot be located on a separately deeded parcel, regardless of the parcel's ownership, except through means of an easement.
D. 
All planning modules proposing individual or community OLDS, which require a DEP permit, shall include a provision granting the Borough and its agents the right to enter the premises to inspect the construction and/or operation of the DEP permitted system. If the system is not being constructed or operated according to the permitted design, the Borough and its agents shall issue a stop-work order or revoke the occupancy permit until construction or operation is brought into compliance with the permit.
E. 
No part or component of any OLDS shall be altered, extended, augmented, modified or repaired without the issuance of a repair permit by the SEO.
F. 
No OLDS shall be used or loaded in a manner that is inconsistent with the permit that was issued herein to authorize the system's installation.
G. 
Permit applications for OLDS that include electronically, mechanically, hydraulically or pneumatically operated or controlled devices shall be accompanied by the respective manufacturer's recommended maintenance schedule and product specifications.
H. 
Permit applications for which the provisions of § 18-407 apply shall include a fully executed maintenance contract indicating the person or company responsible to carry out the required maintenance, the maintenance schedule and a provision stating that the Borough shall be promptly notified of termination of the maintenance contract.
[Ord. 741-06, 10/23/2006]
1. 
Soil-probe and percolation testing and/or soil morphological evaluations by a soil scientist to provide a replacement area shall be required on all proposed lots which exhibit marginal conditions, as defined herein.
2. 
A replacement area shall be required for all unimproved lots existing prior to the effective date of this Part, which are intended to be serviced by a soil-absorption system and contain marginal soils but for which a permit to install an OLDS has not been issued.
3. 
Allowance of open land for the replacement area without performance of appropriate soil testing to verify suitability of the land for a replacement area shall not constitute compliance with this Part.
4. 
The location of the primary and replacement areas shall be delineated and identified as an absorption-area easement on the plot plans and maps or diagrams submitted as part of the permit application and subdivision or land development plan.
5. 
The description, including metes and bounds, of every absorption-area easement shall be recorded as part of the deed for each lot created as part of a subdivision or land development and shall contain language reflecting the following:
A. 
No improvements, whether permanent or temporary, shall be constructed upon or within the absorption-area easement.
B. 
No permanent or temporary alterations, grading, excavation, stockpiling of any soil or any other material shall take place on or in the absorption-area easement.
C. 
During any construction or other activities, the absorption-area easement shall be so marked to prevent equipment with greater wheel loadings than a common garden tractor/riding mower from traveling over or operating on the surface of the absorption-area easement.
D. 
The final cover or improvement to every absorption-area easement shall be limited to shallow-rooted vegetation. The exception shall be where drip irrigation or IRSIS systems are proposed, provided that trees will be allowed to remain.
E. 
No trees shall be planted or remain which are located within 10 feet of the proposed sewage-absorption area.
6. 
A landowner wishing to alter the use of the absorption-area easement must first document, through a site evaluation by the SEO, that an additional area suitable for the installation of an OLDS exists and, upon such a finding, shall:
A. 
Prepare and submit to the SEO for approval a declaration of easement which shall:
(1) 
Meet the identification, non-use and preservation requirements of this section.
(2) 
Describe, by metes and bounds, the easement area to be abandoned.
B. 
Within 15 days of the approval by the Borough, record the declaration of easement at the Berks County Recorder of Deeds office.
C. 
File a copy of the recorded easement with the Borough.
[Ord. 741-06, 10/23/2006]
1. 
All sites shall have a minimum of two soil probes excavated and observed by the SEO.
2. 
Commercial or community sites shall have a minimum of one probe every 50 feet on conventional ground-based systems and one probe every 100 feet for drip and spray sites. Probes shall be staggered in order that the lower probe is in the middle of the upper two.
3. 
All sites shall have a minimum of six percolation test holes conducted uniformly within the proposed sewage-absorption area.
4. 
Commercial and community sites shall require a number of percolation test holes in accordance with the following:
Proposed Absorption Area
(square feet)
Number of Percolation Test Holes
2,000
9
3,000
12
4,000
15
5,000
18
6,000
21
7,000
24
5. 
No sewage system repairs may be completed involving the installation of a new sewage-absorption area or a repair to an existing sewage-absorption area without completing percolation and soil-probe testing as provided herein.
6. 
All percolation and soil-probe testing shall be observed by the Borough SEO to be valid.
7. 
All percolation and probe excavations shall be located on a referenced scaled plan drawing by the applicant or subdivider within 60 days after completion.
8. 
The applicant or landowner shall be responsible to protect the safety, health and welfare of all individuals relative to conducting on-site probe and percolation testing. The excavations shall be protected during testing and closed within 72 hours thereafter.
[Ord. 741-06, 10/23/2006]
1. 
All applications for an OLDS that propose to use an IRSIS as the treatment method shall be accompanied by a maintenance agreement between the owner and the Borough providing for an annual inspection by the SEO, which shall be conducted at the owner's expense, in accordance with the currently adopted Borough fee schedule, for the purpose of monitoring the satisfactory operation of the system. The inspection shall include analyses of effluent at a DEP-certified laboratory for compliance with DEP standards. Said testing may be conducted based upon samples taken by the owner, who must send a copy to the Borough.
2. 
Also included in this requirement shall be systems permitted by DEP, such as stream or swale discharge, and all holding tanks, whether residential, commercial or temporary.
3. 
Applications for IRSIS and holding tanks shall be accompanied by a financial guaranty of the same type and character that is required for public improvements by the Borough's Subdivision and Land Development Ordinance.[1]
[1]
Editor's Note: See Ch. 22, Subdivision and Land Development.
4. 
Module submissions for DEP-permitted systems shall be accompanied by a financial guaranty of the same type and character that is required elsewhere in this section.
5. 
The financial guaranty shall assure that the Borough has access to sufficient funds to operate, maintain, repair or replace any component of the IRSIS in the event that the owner:
A. 
Fails to maintain the system or any of the system's components according to the manufacturer's specifications;
B. 
Fails to service, clean, inspect, and/or pump the treatment tank(s) in accordance with the other applicable standards of this Part; or
C. 
Fails to conduct testing and monitoring at least annually, or more frequently, if required by DEP regulation, and report the analysis to the Borough.
6. 
From the date that the permit application or planning module is submitted to the SEO or Borough and continuing for a period ending two years after the date the system's installation is approved or verified by the SEO, the financial assurance shall be in an amount not less than 50% of the contract price for the installation of the system and all related system components.
7. 
Beginning two years after the date the system's installation is approved or verified by the SEO and continuing as long as the system is in use, the financial assurance shall be reduced to an amount not less than 10% of the actual construction cost for the installation of the system and other related system components.
8. 
The financial guaranty shall be forfeited by the owner and the Borough shall apply the funds to the repair, operation and maintenance of the system when:
A. 
The system is not maintained according to the standards of this Part, applicable DEP regulations or the manufacturer's specifications;
B. 
The treatment tank(s) are not serviced, cleaned, inspected and/or pumped according to the applicable standards of this Part; or
C. 
The testing and monitoring are not conducted according to the standards of this Part, applicable DEP regulations or the manufacturer's specifications.
[Ord. 741-06, 10/23/2006]
1. 
Permits for OLDS shall comply with all provisions of Title 25, Pa. Code Chapters 71-73, and any amendments thereto, and comply with this Part. A permit shall be obtained from the Borough's SEO prior to conducting any alteration, construction or repair to any sewage system within the Borough, regardless of lot size or configuration. The Borough shall retain final authority for the conditions and issuance of OLDS permits.
2. 
The Code Enforcement Officer or authorized person of the Borough shall not issue a building permit for a building to be served by either an individual or community OLDS without first receiving a copy of the permit for the OLDS issued by the Borough's SEO.
3. 
The Code Enforcement Officer or authorized person of the Borough shall not issue an occupancy permit for a building to be served by either an individual or community OLDS without first receiving a copy of the permit for the OLDS bearing the signature of the Borough's SEO granting approval to cover.
4. 
In addition to the standard items required by PA DEP regulations, all systems shall provide, at a minimum, the following:
A. 
Cleanouts at the end of laterals with a removable plug for all pressurized systems.
B. 
All piping from the treatment tank to the absorption area shall have a minimum thickness of Schedule 40 PVC.
C. 
Where a distribution box is used, a cleanout shall be provided at the inlet of the d-box to identify its location, which shall also be installed with a watertight cap above final grade.
D. 
Where a manifold is used for gravity distribution, at least one cleanout must be provided in seepage bed piping, to identify location and to check ponding, which shall also be installed with a watertight cap above final grade.
5. 
Conventional in-ground trench sewage systems shall have the following minimum horizontal separation distances from edge of trench to edge of trench as follows:
Land Slope Percentage
Minimum Horizontal Separator
0% — 10%
6 feet
10% — 20%
7 feet
21% — 25%
8 feet
[Ord. 741-06, 10/23/2006]
1. 
Privately owned community systems are subject to the same requirements of this Part as an individual OLDS. In addition, the following shall be applicable to community systems:
A. 
A list of the names and addresses of all participants in the community OLDS shall be provided to the Borough.
B. 
Participants shall be equally liable for expenses incurred by the Borough or its authorized agent on the shared component of the system unless they have decided among themselves to assume unequal burdens of responsibility for the system, in which case all expenses incurred shall be assessed accordingly by the Borough.
C. 
Expenses incurred on the individual property of participants by the Borough or its authorized agent shall be assessed against the individual participant.
2. 
Participants in a community OLDS shall be assessed directly for expenses incurred by the Borough or its authorized agent unless an organization exists that manages the system, in which case the Borough may deal solely with that organization.
[Ord. 741-06, 10/23/2006]
1. 
During construction of all phases of an OLDS, the Borough's SEO shall conduct construction observations as follows:
A. 
Elevated sand mound systems:
(1) 
Chisel plow/scarification of soil surface.
(2) 
Sand placement.
(3) 
Stone and pipe placement, including pressure test.
(4) 
Final grade and seeding.
B. 
Alternate at-grade bed systems:
(1) 
Chisel plow/scarification of soil surface.
(2) 
Stone and pipe placement, including pressure test.
(3) 
Final grade and seeding.
C. 
In-ground systems:
(1) 
Excavation of bed or trenches, including scarification of same.
(2) 
Stone and pipe placement, including pressure test, if applicable.
(3) 
Final grade and seeding.
D. 
Drip-irrigation systems will include but not be limited to:
(1) 
Preconstruction meeting with contractor to review lateral layout and system components.
(2) 
Laterals, upon installation, and system components prior to cover.
(3) 
Activation of system.
2. 
All specified OLDS construction observations shall permit visual review of all sewer system components prior to placing soil cover.
3. 
Any sewage system component covered without review and observations by the SEO will be required to be opened for examination prior to approval.
4. 
No structure may be occupied nor may any land be placed in use where an OLDS is utilized without the sewage system being approved by the Borough SEO.
5. 
Construction observation requests should be received by the SEO two working days prior to requiring the same. All OLDS projects shall require inspection regardless of time of inspection request.
6. 
The Code Enforcement Officer or other authorized person of the Borough shall not issue a demolition permit for any building that is served by an OLDS without first receiving written notice from the SEO that the OLDS has been properly abandoned.
7. 
Landowners wishing to abandon an existing OLDS must first contact the SEO for instructions and/or standards for the proper abandonment of said system. The owner shall be responsible to pay the necessary fees incurred for a minimum of one compliance inspection in accordance with the current municipal fee schedule. Exact requirements for safe abandonment of OLDS may vary according to the individual system characteristics and design. Requests will be handled on a case-by-case basis by the Borough.
8. 
The Borough of Hamburg's plumbing code requires the Borough to inspect the building sewer. A property owner/excavator shall contact the Borough prior to installation for the inspection requirements.
[Ord. 741-06, 10/23/2006]
The minimum horizontal distances which shall be maintained between the named feature and the sewage absorption area pump tank (PT), septic tanks (ST), and/or holding tank (HT) are as follows:
Named Feature
Distance to HT, ST, PT, TP
(feet)
Distance to Sewage Absorption Area
(feet)
Distance to Alternate Drip Tubing
(feet)
Spray Irrigation System
(feet)
Water supply well
50
100
102
100
Driveway
10
10
12
25
Pool
10
50
52
100
Occupied building
10
10
12
100
Cistern
25
25
27
Water suction line
50
100
102
100
Water supply line under pressure
10
10
12
10
Stormwater infiltration system
50
100 uphill
100 uphill
35 downhill
20 downhill
35 side
20 side
Drainage swale
10
10
12
25
Stormwater pond
25
50
52
50
Stream or lake
25
50
52
50
Grading or disturbed area
5
10
12
10
Closed depression or mini hole
50
100
102
100
Slopes above 25%
10
10
10
10
Property lines
10
10
12
25
Unoccupied buildings
10
10
12
25
Rock outcrop
10
10
12
25
NOTE:
HT = Holding Tank; ST = Sewage Tank; PT = Pump Tank; TP = Treatment Plant.
[Ord. 741-06, 10/23/2006]
1. 
All systems shall be operated by the owner in a manner that is in full compliance with the terms of this Part, DEP regulation(s) and the system's permit.
2. 
Only sewage and normal domestic wastes may be discharged into any OLDS.
3. 
The following shall not, under any circumstances, be discharged into any OLDS:
A. 
Industrial waste.
B. 
Fats and grease.
C. 
Motor oil.
D. 
Hazardous wastes.
E. 
Chemicals, including but not limited to:
(1) 
Pesticides and herbicides.
(2) 
Acids.
(3) 
Paint, paint thinner and solvents, including latex or water-based paints.
(4) 
Wallpaper pastes and adhesives.
(5) 
Photo-processing chemicals.
F. 
Downspout and/or roof drain discharges.
G. 
Sump pump and basement drain discharges.
4. 
The Borough may require the on-site pretreatment of effluents prior to their discharge to any sewage facilities owned and operated by the Borough or any other entity in an effort to assure that the effluent's chemical or biological constituents are compatible with the renovative methods employed by the receiving facilities.
5. 
The owner of a property upon which an OLDS is constructed shall at all times operate and maintain the OLDS in such condition as will permit it to function in the manner in which it was designed and to prevent the unlawful discharge of sewage.
6. 
The owner of a property upon which an OLDS is constructed shall maintain the area around such system so as to provide convenient access for inspection, maintenance, and pumping and shall divert surface water and downspouts away from the absorption area and system components.
7. 
Every aerobic or septic treatment tank is recommended to be pumped out every three years, or more frequently for smaller nonconforming tanks.
8. 
When the treatment tank of an OLDS is pumped out, all dosing tanks, lift tanks and other tanks associated with the system shall also be pumped out.
9. 
Holding tanks shall be pumped out at such intervals as will prevent overflow, leakage, backup, other malfunction or a public health hazard or nuisance, but not less frequently than one time per year in accordance with this Part.
10. 
The SEO may require additional maintenance activities, including but not limited to cleaning or unclogging of piping; servicing or repair of electrical or mechanical equipment; leveling of distribution boxes, tanks and lines; removal of obstructing roots or trees; and diversion of surface water away from soil-absorption areas.
[Ord. 741-06, 10/23/2006]
1. 
In the event a property owner detects conditions that indicate or could reasonably be interpreted to indicate a malfunction, the landowner shall contact the SEO and, if repair or replacement is necessary, apply for a permit to repair or replace the malfunctioning system.
A. 
Landowners who disclose to the SEO the presence of a malfunction upon their lands shall not be penalized for the disclosure.
B. 
If a landowner who has disclosed the presence of a malfunction fails to make voluntary repairs, the Borough may seek injunctive or other relief to compel the repair of the malfunction or cause the repair to be effectuated.
2. 
The Borough's SEO shall have the authority to order the repair or replacement of any existing sewage disposal system with an up-to-date method of sewage disposal. This authority shall include the replacement of any component of the system, the addition of components to the system and the replacement of an existing septic system with a completely different system, as determined by site evaluation and soil testing as deemed appropriate by the SEO.
3. 
Rehabilitation of a malfunctioning system as ordered by the SEO shall commence construction within 30 days of issuance of said order and shall be completed within 60 days, unless seasonal conditions mandate a longer period, in which case the SEO will set an extended completion date. If construction is not commenced or completed within the allotted time period, the SEO shall file the proper legal proceedings as provided in Subsection 1A herein.
4. 
The owner of a malfunctioning system may not undertake any independent repair, modification or replacement of the system without prior notice to and approval of the Borough SEO. Upon completion, the SEO shall inspect the rehabilitated system and certify its compliance with state and local standards, prior to its use.
[Ord. 741-06, 10/23/2006]
1. 
Any OLDS owner found to be violating the provisions of this Part shall be served by the SEO with written notice stating the nature of the violation and the penalties prescribed in Subsection 2 below. This notice shall provide a reasonable time limit for the satisfactory correction thereof. The offender shall, within the period of time stated in such notice, permanently cease all violations.
2. 
Any person who shall violate any provision of this Part, shall be liable for the payment of a fine and penalty in an amount not less than $500 and not exceeding $5,000, plus costs, or to imprisonment not to exceed 90 days, or both. Each day a violation continues shall constitute a separate offense.
3. 
Any septage waste hauler who violates any of the provisions of this Part or other regulations of the Borough and conditions of its permit or of any state or local law governing its actions shall, upon conviction thereof, be suspended from operating within this Borough for a period of not less than six months nor more than two years for each violation, as to determined by the Borough.
4. 
Upon written notice from the SEO that an imminent health hazard exists due to the failure of a property owner to properly operate, maintain, repair or replace an OLDS as provided under the terms of this Part, the Council shall have the authority to perform or contract to have performed any repairs as may be directed by the SEO to abate the health hazard.
5. 
The costs for the actual repair, repair permit and site investigations in support of the permit shall be the responsibility of the property owner.
6. 
The Borough may take all action necessary to recover those costs in accordance with the law, including entering a lien against the property.
7. 
The Borough may seek injunctive relief to prevent continued use of a malfunctioning system.
8. 
A violation will be assessed against both parties, when the property is under joint ownership with a contractor, if construction occurred without compliance with this Part.
[Ord. 741-06, 10/23/2006]
1. 
All permits for the installation of OLDS shall be conditioned upon the inclusion of language in the deed establishing a grant of right of entry by the landowner, his heirs, successors and assigns to the Borough for the limited purpose of inspecting, maintaining, sampling, testing, evaluating or repairing the OLDS described in the application and permit. The right to enter shall include the right to excavate any part of the property or to sample soil water or septage. Upon completion of the activity requiring excavation, the SEO shall return the land to its former condition as soon as possible.
2. 
The grant of right of entry cannot be revoked, suspended, or discontinued by the present or any future owner.
3. 
Property on which an OLDS presently exists or on which an OLDS is under construction shall not be conveyed by the owner without the inclusion of language in the deed establishing and assigning a nonrevocable grant of right of entry by the landowner, his heirs, successors and assigns to the Borough for the limited purpose of inspecting, maintaining, sampling, testing, evaluating or repairing the OLDS described in the application and permit.
4. 
In the event that the OLDS is abandoned and not replaced by another OLDS and all sewage is collected and treated at a site not on the lot, the Borough shall abandon the easement and right of entry, which shall then cease.
[Ord. 741-06, 10/23/2006]
1. 
The owner of any property serviced by an OLDS shall be subject to all the requirements contained herein.
2. 
If the owner does not reside on the property in question or within a building on said property, the owner remains responsible for compliance with this Part. Responsibility for compliance may be transferred to the lessee or resident of the building by an agreement between the owner and the lessee or resident. The Borough will not recognize said agreement until notified in writing. If the lessee or resident shall move out of the building, responsibility shall revert back to the owner, even though a valid agreement with the lessee or resident continues to exist.
3. 
Upon transfer of responsibility for compliance, the owner shall provide the lessee or resident with a copy of all information concerning prior installation, operation, and maintenance of the OLDS.
4. 
Upon transfer of responsibility for compliance in accordance with the above requirements, all references to "owner" in this Part shall hereinafter refer to the lessee or resident of the building or property.
5. 
The owner of any building serviced by an OLDS within the Borough shall become subject to all of the requirements contained herein upon the occurrence of one of the following:
A. 
Receipt of a sewage permit from the SEO for the installation or rehabilitation of an OLDS.
B. 
Transfer of ownership of the building.
C. 
Malfunctioning of the OLDS.
D. 
In the case of an existing building or system, upon the effective date of this Part.
[Ord. 741-06, 10/23/2006]
The Council may, by resolution, establish a fee schedule and collect fees to cover the Borough's actual costs of administering this Part.
[Ord. 741-06, 10/23/2006]
1. 
Appeals from decisions of the Borough SEO shall be made to the Borough Manager, in writing, within 30 days from the date of the written decision issued by the SEO.
2. 
The appellant shall be entitled to a hearing before the Council at its next regularly scheduled meeting, if made at least 14 days prior to the meeting. If made within 14 days of the next meeting, the appeal shall be heard at a special meeting. The Council shall thereafter reverse, modify or affirm the SEO's decision. The hearing may be postponed for good cause shown by the appellant or the Borough. Additional evidence may be presented at the hearing, provided it is submitted with the written notice of the appeal.
3. 
A decision shall be rendered within 30 days of the date of the hearing. If a written decision is not rendered within 30 days, the relief sought by the appellant shall be deemed granted.