The subdivider shall pay the City of Brodhead all fees as hereinafter
required and at the times specified before being entitled to recording
of a plat or certified survey map according to a developer agreement.
The subdivider shall pay a fee equal to the actual cost to the City for all engineering work incurred by the City in connection with the plat or certified survey map, including inspections required by the City pursuant to §
472-23D. The subdivider shall pay a fee equal to the actual cost to the City for such engineering work and inspection as the Common Council and/or City Engineer deems necessary to assure that the construction of the required improvements is in compliance with the plans, specifications and ordinances of the City or any other governmental authority. Engineering work shall include the preparation of construction plans, review of preliminary plat, final plat, construction plans, standard specifications and inspection of construction.
The subdivider shall pay a fee to the City equal to the cost
of any legal, administrative or fiscal work which may be undertaken
by the City in connection with the plat or certified survey map.
There shall be no fee for the City's review of a concept
or sketch plan of a proposed land division. However, such reviews
shall be conducted only as staff time permits.
The subdivider shall transmit all fees required for state agency
review to the City Clerk-Treasurer at the time of application. Said
review fees shall be retransmitted to the proper state review agency
by the City Clerk-Treasurer. Said fees shall be applicable, where
appropriate, to review fees required by the Wisconsin Department of
Administration, Wisconsin Department of Transportation, Wisconsin
Department of Safety and Professional Services and the Wisconsin Department
of Natural Resources.
If the subdivision does not contain lands to be dedicated as required in this chapter, the City Clerk-Treasurer shall require a fee pursuant to §
472-47 of this chapter for the acquisition and development of public sites to serve the future inhabitants of the proposed subdivision.
All outstanding special charges (including, without limitation,
charges for engineering, legal fees, taxes, public works fees, etc.)
due to the City shall be due prior to the signing of the final plat
or certified survey by the City.