[R.O. 2012 Sch. V; Ord. No. 493 §1, 5-7-1991]
In accordance with Chapter 360 of this Title and when signs are posted, the following locations shall be "Loading Zones" as indicated herein:
Water Fill Loading Zone. The north side of East
South Railroad from a point one hundred forty-three (143) feet to
a point two hundred three (203) feet from the east line of the State
Street right-of-way shall be designated a loading zone for the City
coin operated water fill facility. Use of this zone for any purpose
other than loading water shall be a violation of this Schedule.
|
Loading Zone. The south side of East South Railroad
from a point one hundred twenty (120) feet to a point two hundred
seventy-two (272) feet from the east line of the State Street right-of-way.
Use of this zone for any purpose other than loading or unloading vehicles
shall be a violation of this Schedule.
|