[CC 1997 §5-7]
Anyone wishing to move a building or mobile home into the City, for use other than for resale, must first obtain a building permit to do so and the building or mobile home must fully conform to the requirements. This building permit does not apply to mobile homes being moved to an established mobile home park.
[CC 1997 §5-10; Ord. No. 1054, 1-10-1995]
Any person who shall continue any work in or about the structure after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be liable to a fine as set forth in Section 500.030.
[Ord. No. 1220 §5-11, 11-10-1998; Ord. No. 8-2013, 5-14-2013]
Prior to granting a permit, the City Clerk and City Building Inspector shall ensure that the applicant is in compliance with all City ordinances and State laws, including, but not limited to, ensuring that the applicant is current on all obligations owed the City. If the applicant assures the City Clerk by its application that it is in compliance and it is subsequently determined that the applicant is not in compliance, said non-compliance shall be grounds for suspending or revoking said permit.
The set of standard specifications titled as:
Division 100 Sanitary Sewer System
Division 200 Potable Water System
Division 300 Storm Sewers and Appurtenances
Division 400 Streets and Roadways
Division 500 Sidewalks and Drives
Standard Details
are hereby established as the standards by which the infrastructure of Branson West be built and is on file in the City offices.
[1]
Editor's Note: As to Design Standards for Public Improvements, Ch. 400, Art. XI.
[Ord. No. 46-2007 §1, Attachment C, 12-13-2007; Ord. No. 11-110 §§1 — 2, 4-12-2011; Ord. No. 11-2016, 11-8-2016]
A. 
The Board of Aldermen hereby establishes that the building permit fee for one-family to four-family residential structure should be four dollars ($4.00) per thousand dollars ($1,000.00) of value of each such structure, with a minimum of sixty-five dollars ($65.00). The building permit fee is in addition to the plan review fee, which shall be one hundred twenty-five thousandths percent (0.125%) of the valuation, with a minimum plan review fee of forty dollars ($40.00).
B. 
Fee Schedule.
2012[1] International Building Code
Type of Construction (2012 IBC)
Use Groups
IA
IB
IIA
IIB
IIIA
IIIB
IV
VA
VB
A-1
Assembly, theaters, with stage
1.78
1.73
1.69
1.6
1.5
1.5
155
1.4
1.35
A-1
Assembly, theaters, no stage
1.61
1.56
1.52
1.43
1.33
1.33
1.38
1.23
1.18
A-2
Assembly, nightclubs
1.28
1.24
1.21
1.14
1.06
1.06
1.1
0.97
0.94
A-2
Assembly, restaurants, banquet halls, bars
1.26
1.23
1.18
1.12
1.04
1.05
1.09
0.94
0.92
A-3
Assembly, churches
1.63
1.57
1.53
1.44
1.35
1.34
1.4
1.24
1.2
A-3
Assembly, libraries, museums, community halls, etc.
1.28
1.22
1.17
1.09
0.98
0.99
1.05
0.88
0.85
A-4
Assembly, arenas
1.26
1.23
1.18
1.12
1.04
1.05
1.09
0.94
0.92
B
Business
1.22
1.17
1.13
1.06
0.94
0.94
1.02
0.83
0.8
E
Education
1.36
1.31
1.28
1.2
1.11
1.06
1.16
0.96
0.95
F-1
Factory and Industrial, moderate hazard
0.77
0.73
0.68
0.65
0.56
0.57
0.63
0.47
0.45
F-2
Factory and Industrial, low hazard
0.76
0.72
0.68
0.63
0.56
0.56
0.61
0.47
0.44
H-1
High hazard, explosives
0.74
.07
0.67
0.62
0.54
0.54
0.6
0.46
N.P.
H-2 through H-4
High hazard
0.74
.07
0.67
0.62
0.54
0.54
0.6
0.46
0.42
H-5
HPM
1.22
1.17
1.13
1.06
0.94
0.94
1.02
0.83
0.8
I-1
Institutional, supervised environment
1.23
1.18
1.15
1.09
1
1
1.06
0.91
0.88
I-2
Institutional, incapacitated
1.81
1.76
1.72
1.65
1.53
N.P.
1.6
1.42
N.P.
I-3
Institutional, restrained
1.41
1.36
1.32
1.25
1.15
1.14
1.21
1.04
0.96
I-4
Institutional, day care facilities
1.23
1.18
1.15
1.09
1
1
1.06
0.91
0.88
M
Mercantile
0.98
0.94
0.89
0.84
0.75
0.76
0.8
0.66
0.64
R-1
Residential, hotels
1.34
1.29
1.26
1.19
1.11
1.11
1.18
1.02
0.98
R-2
Residential, multi-family
1.12
1.06
1.04
0.96
0.89
0.89
0.97
0.81
0.77
R-3 and IRC
Residential, 1 and 2 family
0.93
0.9
0.87
0.83
0.79
0.79
0.82
0.73
0.69
R-4
Residential, care/assisted living
1.23
1.18
1.15
1.09
1
1
1.06
0.91
0.88
S-1
Storage, moderate hazard
0.73
0.69
0.64
0.6
0.51
0.53
0.58
0.43
0.41
S-2
Storage, low hazard
0.71
0.68
0.64
0.59
0.51
0.51
0.57
0.43
0.4
U
Utility
0.56
0.53
0.5
0.46
0.4
0.4
0.43
0.33
0.31
All
Open shells
0.73
0.69
0.64
0.6
0.51
0.51
0.58
0.43
0.41
All
Unfinished basements
$15.00 per square foot
All
Finished basements
$30.00 per square foot
R-3
Garages
$14.00 per square foot
R-3
Sheds
$10.00 per square foot
R-3
Decks
$8.00 per square foot
R-3
Carports
$5.00 per square foot
*Minimum fee for residential building permit sixty-five dollars ($65.00) and forty-five dollars ($45.00) per inspection fee for each site visit by the City's Building Inspector.
Project Valuation Equation: (Gross area) x (Area modifier*) x (Type of construction factor from table above) = Cost of construction
*Area modifier is .75 (as established by the ICC).
[1]
Editor's Note: Ord. No. 11-2016 adopted the 2012 version of this Code, reference to the 2003 IBC was updated by implication within this table.