The Board of Zoning Adjustment as established by the City of Lawson shall hear and decide appeals and requests for variances from the floodplain management requirements of this Chapter.
Where an application for a floodplain development permit or request for a variance from the floodplain management regulations is denied by the City Administrator, the applicant may apply for such floodplain development permit or variance directly to the Appeal Board, as defined in Article V, Section 405.200.
The Board of Zoning Adjustment shall hear and decide appeals when it is alleged that there is an error in any requirement, decision or determination made by the City Administrator in the enforcement or administration of this Chapter.
Any person aggrieved by the decision of the Board of Zoning Adjustment or any taxpayer may appeal such decision to the Clay County Circuit Court as provided in Section 89.110, RSMo.
In passing upon such application for variances, the Board of Zoning Adjustment shall consider all technical data and evaluations, all relevant factors, standards specified in other Sections of this Chapter, and the following criteria:
The costs of providing governmental services during and after flood conditions, including maintenance and repair of public utilities and facilities such as sewer, gas, electrical and water systems, streets and bridges.
Generally, variances may be issued for new construction and substantial improvements to be erected on a lot of one-half (1/2) acre or less in size contiguous to and surrounded by lots with existing structures constructed below the base flood elevation, providing Subsections (B) through (F) below have been fully considered. As the lot size increases beyond the one-half (1/2) acre, the technical justification required for issuing the variance increases.
Variances may be issued for the reconstruction, rehabilitation, or restoration of structures listed on the National Register of Historic Places, the State Inventory of Historic Places, or local inventory of historic places upon determination, provided the proposed activity will not preclude the structure's continued historic designation.
A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, create nuisances, cause fraud on or victimization of the public, or conflict with existing local laws or ordinances.
The issuance of a variance to construct a structure below base flood elevation will result in increased premium rates for flood insurance up to amounts as high as twenty-five dollars ($25.00) for one hundred dollars ($100.00) of insurance coverage, and