[Adopted 10-1-2008 by L.L. No. 3-2008]
The purpose of this article is to prohibit the installation
of nondriveway culvert pipe in the Town's right-of-way with certain
exceptions. The Town Board, on a case-by-case basis, may waive the
prohibition after considering:
No culverts shall be located within a right-of-way where water
lines or sewer lines are located.
A.
The following
public improvement procedure (PIP) shall be followed:
(1)
The
permit fee shall be set annually, or as needed by the Board; and
(2)
The
applicant shall provide his own engineer's plans and specifications
for the project; said specifications will be reviewed by the Town
Engineer. Any costs incurred by the Town Engineer for that review
will be paid for by the applicant.
C.
The installation
will be inspected by the Town Engineer. The applicant will be responsible
for the payment of the inspection fees; said inspection to include
final grade.
D.
Additionally,
all culvert pipe shall be maintained by the property owner; and if
not maintained and after notification by the Highway Department, any
costs associated with cleaning out the culvert pipe by the Town Highway
Department shall be paid for by the property owner, and if not paid,
charged back to the property as a tax.[2]