A schedule of required inspections shall be determined through a
preconstruction meeting with Borough staff. The schedule shall include,
but not be limited to, inspections for erosion and sedimentation control
measures, pipe installation prior to backfilling, outlet structure
installation prior to backfilling, seepage bed installation, underdrain
installation prior to backfilling, site grading, antiseep collar installation,
impermeable liner installation, roof leader installation and connection,
site stabilization, etc.