Exciting enhancements are coming soon to eCode360! Learn more 🡪
City of Strafford, MO
Greene County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[Ord. No. 742 §1, 3-16-2015]
As used in this Article, the following terms shall mean:
PRIVATE WATER SUPPLY SYSTEM
Any water well or other water system serving at least one (1) person, residence, business, property or multi-dwelling unit.
[Ord. No. 742 §1, 3-16-2015]
A. 
The construction of any private water supply system within the corporate limits of the City of Strafford, Missouri, is hereby prohibited unless an application has been submitted and the following requirements have first been met:
1. 
The Board of Aldermen has voted to approve the construction of said private water supply system, and the applicant has received written notification of said approval; and
2. 
The operator of any such private water supply system has obtained an operating permit from the City of Strafford and the Missouri Department of Natural Resources; and
3. 
The system is constructed and operated in accordance with the rules, regulations and requirements of the Missouri Department of Natural Resources; and
4. 
The system is not placed into operation until such time as the City of Strafford, Missouri, and the Missouri Department of Natural Resources has inspected and approved the completed system.
[Ord. No. 742 §1, 3-16-2015]
A. 
The construction of a private water supply system as set forth in Section 700.260 above shall not be given by the Board of Aldermen if it is determined:
1. 
The City has the ability to provide water service to the area to be served by the proposed private water supply system; or
2. 
If the construction of the system would be adverse to planning goals of the City or adverse to the health, safety or welfare or the residents of the City.