[Ord. 2011-09, 9/7/2011, § 501]
1. The Township Engineer or his municipal assignee shall inspect phases
of the installation of the permanent stormwater management facilities
as deemed appropriate by the Township Engineer. It is the responsibility
of the permittee to notify the Township Engineer 48 hours in advance
of the beginning of construction of stormwater management facilities.
Individual residential on-lot stormwater management systems shall
be inspected by Township staff.
2. During any stage of the work, if the Township Engineer determines
that the permanent stormwater management facilities are not being
installed in accordance with the approved stormwater management plan,
the Township shall revoke any existing approvals issued under this
Chapter until a revised drainage plan is submitted and approved, as
specified in this Chapter.