The purpose of this article is to regulate the outdoor application
of fertilizer so as to reduce the overall amount of excess nutrients
entering waterways, thereby helping to protect and improve surface
water quality.
For the purpose of this article, the following terms, phrases,
words and their derivations shall have the meanings stated herein,
unless their use in the text of this article clearly demonstrates
a different meaning. When not inconsistent with the context, words
used in the present tense include the future, words used in the plural
number include the singular number, and words used in the singular
number include the plural number. The word "shall" is always mandatory
and not merely directory.
BUFFER
The land area, 25 feet in width, adjacent to any water body.
COMMERCIAL FARM
A farm management unit producing agricultural or horticultural
products worth $2,500 or more annually.
FERTILIZER
A fertilizer material, mixed fertilizer or any other substance
containing one or more recognized plant nutrients, which is used for
its plant nutrient content, which is designed for use or claimed to
have value in promoting plant growth, and which is sold, offered for
sale or intended for sale.
IMPERVIOUS SURFACE
A surface that has been covered with a layer of material
so that it is highly resistant to infiltration by water. This term
shall be used to include any highway, street, sidewalk, parking lot,
driveway or other material that prevents infiltration of water into
the soil.
PERSON
Any individual, corporation, company, partnership, firm,
association or political subdivision of this state subject to municipal
jurisdiction.
PHOSPHORUS FERTILIZER
Any fertilizer that contains phosphorus, expressed as P205, with a guaranteed analysis
of greater than zero, except that it shall not be considered to include
animal (including human) or vegetable manures, agricultural liming
materials, or wood ashes that have not been amended to increase their
nutrient content.
SOILS TEST
A technical analysis of soil conducted by an accredited soil
testing laboratory following the protocol for such a test established
by Rutgers Cooperative Research and Extension.
WATER BODY
A surface water feature, such as a lake, river, stream, creek,
pond, lagoon, bay or estuary.
No person may do any of the following:
A. Apply fertilizer when a runoff-producing rainfall is occurring or
predicted and/or when soils are saturated and a potential for fertilizer
movement off site exists.
B. Apply fertilizer to an impervious surface. Fertilizer inadvertently
applied to an impervious surface must be swept or blown back into
the target surface or returned to either its original or another appropriate
container for reuse.
C. Apply fertilizer within the buffer of any water body.
D. Apply fertilizer more than 15 days prior to the start of or at any
time after the end of the recognized growing season, March 15 to October
31. Should the ground still be frozen or susceptible to heavy frost,
the March 15 starting date shall be rescheduled to a date where the
threat of frost and frozen ground conditions no longer exist. Likewise,
should frost occur prior to October 31, care should be given to applying
fertilizer when the colder weather sets in and the likelihood of frozen,
or continuously frosted, ground will not allow the applied fertilizer
to break down and be absorbed into the lawn.
This article shall be enforced by the Police Department, Engineering
Department and those other appropriate municipal officials of the
Township of Morris.
Any person(s) found to be in violation of the provisions of this article shall be punishable as provided in §
1-3, General penalty, of this Code.