[1997 Code § 224-154]
The standards of the City of Absecon City as established within the various zoning districts of the City (Articles IV to XVII) and as listed in this Article are to be considered minimum. Prior to the granting of final approvals for subdivision or site plan, the developer shall have installed improvements required by the Planning Board or have posted a performance guaranty sufficient to cover the costs of said improvements. Improvements may include those recommended by State and County agencies which have participated in the review. Construction standards and required improvements are intended to protect the general health, safety and welfare. In certain instances, all of the improvements listed in this Article may not be appropriate, in which case the Planning Board may issue a waiver. Standards established within this chapter and those hereafter adopted by the City shall govern design, construction and installation of improvements within the City of Absecon City. Failure by a subdivider, developer, constructor or agent to conform to these specifications shall be just cause for suspension of work without right to claim damages from the City, its officers or agents for such stoppage.
[1997 Code § 224-155]
In the event that the City has not adopted standards for a specific type of improvement, generally accepted engineering standards as set forth in accepted engineering and construction manuals and modified as necessary by the City Engineer shall be used.
[1997 Code § 224-156]
A. 
Prior to construction, all stakes and grades shall be set by a licensed land surveyor and a set of the notes resulting shall be filed with the City Engineer. Before work commences, the City Engineer shall be notified, and under no circumstances shall underground work be covered until inspected by the appropriate official.
B. 
If, during construction, the subdivider/developer fails to meet specified requirements or to correct unacceptable work, he shall be notified of such failure by certified mail, return receipt requested, with instructions for correcting the situation. If corrections have not been made within 10 days, the City shall serve the subdivider/developer with notice of failure to comply, with a copy to the Planning Board, and work may be suspended.
[1997 Code § 224-157]
A. 
Prior to and during construction, no topsoil shall be removed from the site or utilized as fill without approval of the Construction Official or City Engineer. Soil displaced by construction shall be redistributed so as to provide a six-inch base throughout the development, which shall be stabilized by seeding and planting.
B. 
Developed areas shall be cleared of all stumps, litter, rubbish, brush, dead and dying trees, roots, debris and scrap building materials prior to receipt of a certificate of occupancy. None of these materials shall be buried within the City of Absecon City.
C. 
All fill shall be clean and free of decaying materials.
D. 
No changes shall be made in elevations or contours on the site other than those shown and approved on the preliminary plat.
E. 
During construction, the site shall be left daily in sanitary and safe condition. The Construction Official may require installation or construction of temporary improvements on the site to prevent personal injury, property damage, health hazards, erosion and flooding. Such improvements may include grading, retaining walls, pipes, culverts and other site-specific improvements to limit negative impacts.
F. 
Where existing materials and soil conditions are not satisfactory for utility and street construction, the unsatisfactory material shall be excavated and replaced with approved fill.
[1997 Code § 224-158]
A. 
Roadways. The subdivider/developer shall observe the following requirements and standards:
(1) 
The Planning Board will take into consideration the officially adopted Master Plan or an Official Map in review and approval of subdivision plats.
(2) 
Local streets shall be so designed as to discourage through traffic.
(3) 
Subdivisions abutting arterial roads shall provide a marginal service road with an approved buffer strip as a means of separation of through and local traffic.
(4) 
The right-of-way width on all streets shall be measured from lot line to lot line and shall not be less than the following:
(a) 
Arterial streets: 80 feet.
(b) 
Collector streets: 60 feet.
(c) 
Local streets: 50 feet.
(d) 
Marginal access streets: 50 feet.
(5) 
The right-of-way width for internal roads and alleys in multifamily and commercial developments shall be determined on an individual basis.
(6) 
No residential service street may be connected directly to any artery other than a collector street.
(7) 
Streets having a right-of-way of 50 feet shall not be less than 30 feet wide between curblines, and streets having a right-of-way of 60 feet shall not be less than 40 feet wide between curblines.
(8) 
Subdivisions that adjoin or include existing streets that do not conform to widths as shown on the Master Plan or Official Map or the street width requirements contained in this section shall dedicate additional width along either one or both sides of said road. If the subdivision is along one side only, 1/2 of the required extra width shall be dedicated. This requirement shall apply to minor subdivisions, unless waived by the Board.
(9) 
No street shall have a minimum grade of less than 75%. All streets shall have a crown of not less than six inches.
(10) 
Streets shall be as nearly at right angles as is possible, and in no case shall such streets be at an angle of less than 75°. The block corners at intersections shall be rounded at the curbline with a curve having a radius of not less than 15 feet.
(11) 
Street jogs with center-line offsets of less than 100 feet shall be prohibited.
(12) 
A tangent at least 100 feet long shall be introduced between reverse curves on arterial and collector streets.
(13) 
When connecting street lines deflect from each other at any one point by more than 10° but not more than 45°, they shall be connected by a curve with a radius of not less than 100 feet for minor streets and 300 feet for arterial and collector streets.
(14) 
Dead-end streets (cul-de-sacs) shall not be longer than 600 feet. They shall be provided with an unobstructed turning radius of at least 50 feet, the end of which shall be tangent, whenever possible, to the right side of the street. If a dead-end street is of a temporary nature, a similar turnaround shall be provided and provisions made for future extension of the street and reversion of the excess right-of-way to the adjoining properties.
B. 
Surface drainage. Where drainage water from the streets shown on the plat discharges on the property of either the owner or others, proper easements shall be obtained by the applicant and shall be furnished to the City covering the rights to discharge such drainage water.
C. 
Blocks.
(1) 
Block lengths and widths or acreage within bounding roads shall be such as to accommodate the size of the lot required in the area by the Zoning Ordinance and to provide for convenient access, circulation control and safety of street traffic.
(2) 
In blocks over 700 feet long, pedestrian crosswalks shall be required in locations deemed necessary by the Planning Board. Such walkway shall be 10 feet wide.
D. 
Street surfacing and curbs and gutters. Road construction shall conform to New Jersey Department of Transportation standard specifications.
(1) 
Subgrade. Where fill is required, the underlying ground surface shall be stripped of all brush and trees before filling is commenced. The material used for fill shall be suitable therefor and shall be free from any matter that may decay. The fill shall be formed in successive layers and each layer compacted by operating the construction equipment over it until it is firm and unyielding before the next layer is placed. Before construction of the gravel base is commenced, the subgrade shall be neatly dressed to the proper lines, grades and cross sections.
(2) 
Pavement foundation.
(a) 
The pavement foundation shall consist of six inches of compacted gravel and four inches of bituminous stabilized base. The gravel base course may require a prime coat of asphaltic oil, if so directed by the City Engineer. Base course may be recycled asphalt or concrete.
(b) 
The gravel base course shall consist of six inches of compacted road gravel, Type 2, Class A or B, conforming to the requirements of the New Jersey State Highway Department standard specifications. The finished subbase shall be thoroughly compacted and bound together, hard, smooth and even, free from defects and at the proper grade and contour.
(c) 
The bituminous stabilized base course shall comply with the requirements of Section 3.2A (Mix No. 1) of the New Jersey State Highway Department standard specifications, latest edition.
(3) 
Bituminous concrete pavement. Streets shall be permanently paved with two-inch-thick bituminous concrete pavement, Type FABC-1. The pavement shall be constructed in accordance with the requirements of the New Jersey State Highway Department standard specifications, latest edition, for both materials and methods of construction.
(4) 
Concrete curbs, gutters and sidewalks.
(a) 
Materials for concrete shall conform to the requirements of the New Jersey State Highway Department standard specifications. Concrete shall be Class B. Metal forms shall be used for the construction of concrete curbs and gutters. Curbs are to be six inches wide and 18 inches deep and are to be constructed true to the required lines, grades and curvatures. Gutters are to be six inches thick and 24 inches wide. Sidewalks are to be four inches thick and five feet wide.
(b) 
At all intersections the sidewalk on each roadway corner shall be designed to meet New Jersey barrier-free standards.
E. 
Sanitary sewage.
(1) 
Provisions shall be made to convey sanitary waste from each lot through laterals and interceptors of sufficient size, material and capacity to collectors and then to trunk sewers to public treatment facilities. Such provisions shall be shown on a set of plans accompanying the preliminary plat. The following information shall accompany the detailed provisions:
(a) 
An estimate from the subdivider/developer of the daily flow from the proposed development based upon an average daily flow of 100 gallons per person per day for residential use and comparable data for commercial uses.
(b) 
An estimate of total per capital water use for the proposed development based upon an average usage of 100 gallons per person per day for residential use and comparable use data for commercial uses.
(c) 
Minimum grades for sewers for each size used and all sizes, slopes and inverts elevations.
(2) 
Sanitary sewer designs shall receive all required County and State permits and approvals prior to construction.
(3) 
Sewers will be designed to carry twice the estimated average design flow when flowing half full and shall be designed for a twenty-five-year period. Sewers shall be constructed of PVC pipe sloped to permit a minimum mean velocity of not less than two feet per second when half or more full, based upon the Manning or Kutters Formula. Minimum diameter of sewer pipe shall be eight inches. It shall be laid in straight alignment unless the Planning Board specifically waives this requirement to better fit design.
(4) 
In areas where groundwater elevation or soil conditions make subbase instability likely, the sewer shall be designed for these conditions.
(5) 
Sewer lines and waterlines shall be separated 10 feet horizontally and 18 inches vertically or as approved by regulatory agencies.
(6) 
Manholes shall be located at the end of each sewer line, at maximum distances of 400 feet and in intersections, and all changes in slope, pipe size and direction shall be confined to manholes.
F. 
Water supply.
(1) 
Provisions shall be made and shown on a set of plans accompanying the preliminary plat for adequate water supply to each lot. In addition to locations and diameters of pipes, hydrants, blowoffs and valves, the plan submitted shall include:
(a) 
Capacity and size of mains. Design capacity of mains shall be such as to provide a minimum pressure of 20 pounds per square inch at peak demand plus fire flow. All pipes used in water mains shall be ductile iron with a minimum diameter of six inches.
(b) 
General design requirements. Wherever possible, distribution mains shall be laid in the loop system to eliminate dead ends. Dead ends, if unavoidable, shall have a fire hydrant, flushing hydrant or blowoff for flushing purposes.
(c) 
All distribution mains shall be provided with sufficient earth or other suitable cover to prevent freezing. All water distribution mains shall have a minimum of three feet of cover.
(d) 
Adequate disinfection of all new distribution mains prior to use shall be required.
(e) 
Water mains and sewers shall be separated by a horizontal distance of 10 feet. If such lateral separation is not possible, water and sewer lines shall be in separate trenches, with the sewer at least 18 inches below the water main or with other such separation as approved by the regulatory or permitting agencies.
(2) 
At crossings of sewers and water mains, the sewer shall, in general, be at least 18 inches below the bottom of the water main. Where this is not possible, the sewer shall be constructed of cast-iron pipe for a distance of at least 10 feet on either side of the crossing or other suitable protection as approved by regulatory or permitting agencies.
G. 
Stormwater. Provisions shall be made and shown on a set of plans accompanying the preliminary plat for collection and conveyance of stormwater on and, as required, off site and for proper connection with an approved system.
(1) 
Collection system basis shall be in accordance with the rational method of design, using the formula
Q=AIR,
Where:
"Q" is the required capacity in cubic feet per second for the collection system at the point of design.
"A" is the tributary drainage area in acres and shall include areas tributary from outside sources as well as from within the subdivision itself.
"I" is the rainfall intensity in inches per hour and shall be determined from Rainfall Intensity Duration Curves for New Jersey, as prepared by the New Jersey Department of Transportation.
"R" is the coefficient of runoff applicable to the area based upon soil conditions, average slope of the area and degree of ultimate area development. In no case shall "R" equal less than .30.
Land Use Type
Runoff Coefficients
Business
Downtown area
0.70 to 0.95
Neighborhood area
0.50 to 0.70
Design commercial centers
0.35 to 0.50
Residential
Single-family areas
0.30 to 0.50
Multifamily areas
0.60 to 0.75
Residential (suburban)
0.25 to 0.40
Planned industrial
0.50 to 0.80
Parks and cemeteries
0.10 to 0.25
Playgrounds
0.20 to 0.35
Unimproved areas
0.10 to 0.30
Surface type streets
Asphalt
0.90 to 0.95
Concrete
0.90 to 0.95
Drives and walks
0.75 to 0.85
Roofs
Lawns, sandy soil
Flat, grade of 2%
0.05 to 0.10
Average, grade of 2% to 7%
0.10 to 0.15
Lawns, heavy soil
Flat, grade of 2%
0.18 to 0.22
Average, grade of 2% to 7%
0.18 to 0.22
Using the above runoff coefficients, composite coefficients shall be calculated for use in the form sewer design.
(2) 
Flow design criteria shall be based upon a design storm that will be equaled or exceeded on a frequency of once every 15 years. System design will be based upon Manning Formula. "N" valves (coefficient of friction) used shall be approved by the reviewing engineer. The minimum velocity at flowing full condition shall be three feet per second.
(3) 
The system of collection shall include:
(a) 
Curbs six inches wide and 18 inches deep constructed of Class B concrete and true required lines, grades and curvatures.
(b) 
Catch basins and manholes constructed in accordance with New Jersey Standard Specifications for Road and Bridge Construction, latest revision. Access manholes shall be required at three-hundred-foot intervals. Sufficient catch basins will be installed at each intersection to avoid gutter overflow and at low points in street grades. Bicycle-safe grates shall be used in all catch basins.
(c) 
Reinforced concrete pipe shall be utilized which shall be minimally 15 inches in diameter laid in straight alignment. All transitions in slope, change of direction or pipe size shall be confined to manholes or catch basins. Such pipes shall conform to AASHOM 170 for specified diameter and strength class. Installation shall be inspected by the appropriate City official and shall be in accordance with accepted engineering practice.
(d) 
Catch basins shall be spaced so that the runoff water in gutters does not create flooding in streets for a fifteen-year-storm-frequency design. Calculations shall be submitted verifying both the depth of water in gutters and that proposed catch basins are of sufficient capacity to remove design stormwater runoff.
(e) 
In certain limited traffic areas, concrete valley gutters shall be permitted at "T" intersections.
(f) 
In no case shall provisions for storm drainage overload an existing facility, and in those instances where increased flow may create increased potential for erosion or flooding, the subdivider/developer may be required to improve the off-tract facility in accordance with Article XXIV, Section 224-179.
(g) 
Where a subdivision is transversed by a watercourse, surface water or groundwater drainage or drainage system, channel or stream or a dedicated drainage right-of-way easement at least 10 feet in width shall be granted to the City of Absecon City.
(h) 
Construction of all drainage facilities shall conform to the specifications contained herein. In the event that detailed specifications are not included, standard specifications of the New Jersey Department of Transportation, latest revision, shall govern.
H. 
Stormwater management system.
(1) 
Provision shall be made to control stormwater runoff, using the following general guidelines:
(a) 
Channeling runoff directly to water bodies should be discontinued. Instead, runoff should be routed through swales and other drainage systems designed to increase the time of concentration, decrease velocity, increase infiltration and allow suspended material to settle.
(b) 
Natural watercourses should not be dredged, cleared of vegetation, deepened, widened, straightened, stabilized or otherwise altered without a stream encroachment permit from the New Jersey Department of Environmental Protection, Division of Water Resources, Bureau of Floodplain Management. Water should be retained or detained before it enters any natural watercourse in order to preserve the natural hydrodynamics of the watercourse and to prevent siltation or other forms of pollution.
(c) 
Retention and detention facilities shall be used to retain and detain the increased accelerated runoff which the development generates. Water should be released from detention facilities into a watercourse or wetlands at a rate and in a manner approximating the natural flow which occurred before development. Care must be taken, since the design of detention/retention facilities without an associated analysis of downstream impact can create increased stormwater runoff problems even when a stormwater management system is in place.
(d) 
The sides of detention and/or retention basins shall slope at a gentle grade into the basin bottom as a safeguard against drowning and personal injury and to ensure the structural integrity of the facility.
(e) 
The bottom of all proposed retention structures shall be at least two feet above the seasonal high water table found in the soil logs. In the event of impervious strata, provision shall be made for percolation through this strata.
(f) 
Runoff from parking areas should incorporate measures (i.e., grit and oil chamber or sediment traps) to prevent oil and sediment from entering receiving waters and/or clogging the interstices, preventing infiltration in subsurface recharge and/or retention facilities.
(g) 
Artificial watercourses, such as swales, should be designed considering soil type, so that the velocity of flow is low enough to prevent erosion.
(h) 
Intermittent watercourses, such as swales, should be vegetated.
(i) 
The area of land disturbed by development should be as small as practicable (footprint: only removing the vegetation necessary to build the structure). Those areas which are not to be disturbed should be protected by an adequate barrier from construction activity using acceptable soil erosion and sedimentation control techniques. Whenever possible, natural vegetation should be retained and protected.
(j) 
Although the use of wetlands for storing and purifying water is sometimes encouraged, care must be taken not to overload their capacity, thereby harming wetlands and transitional vegetation. Wetlands should be not damaged by the construction of detention ponds.
(k) 
Wetlands and other water bodies should not be used as sediment traps during development.
(l) 
Vegetated buffer strips should be created or, where practicable, retained in their natural state along the banks of all watercourses, water bodies or wetlands. The width of the buffer should be sufficient to prevent erosion, trap the sediment carried with overland runoff, provide access to the water body and allow for periodic flooding without damage to structures.
(m) 
The use of drainage facilities and vegetated buffer zones as open space, recreation and conservation areas should be encouraged.
(n) 
Erosion and sedimentation facilities should receive regular maintenance during construction to ensure that they continue to function properly.
(o) 
No grading, cutting or filling should be commenced until the plan is approved by the Municipal and County Planning Boards and the Soil Conservation District.
(p) 
Land which has been cleared for development and upon which construction has not commenced should be protected from erosion by appropriate techniques designed to revegetate the area.
(q) 
Adherence to the development time schedule contained in the erosion and sediment control plan should be followed.
(r) 
Sediment should be retained on the development site.
(s) 
Volumes and rate of runoff are to remain at predevelopment levels for the two-, ten- and fifty-year storm.
(t) 
The developer shall formulate a maintenance plan for retention and detention facilities. This plan shall include maintenance schedules, type of maintenance required and a periodic inspection program. In the case of homeowner or condominium associations or commercial development, the plan shall include provisions for inspection at specified intervals by the City Engineer. The cost of such inspections shall be borne by the applicant or developer.
(2) 
Stormwater management plan, details and design criteria:
(a) 
The proposed finished grade elevations at the corners of any structure or structures.
(b) 
Existing topography and proposed grading at contour intervals of two feet or less.
(c) 
The lowest elevation within any proposed structure after its completion.
(d) 
The location, type and size of all existing and proposed storm drainage facilities and other utilities servicing the premises in question.
(e) 
The location, size and nature of all existing and proposed drainage rights-of-way or easements and the location, size and description of any land to be dedicated to the City.
(f) 
The layout and size of any existing and proposed public streets.
(g) 
The location, type and size of all existing and proposed erosion and siltation control measures, such as slope protection, soil stabilization, sedimentation basins, sediment traps, headwalls and water retention facilities.
(h) 
All the pertinent rainfall data, stream flow data, gaugings, etc., on which calculations were based.
(i) 
Complete calculations and hydraulic profiles for normal, average and storm of record.
(j) 
In addition, the developer shall furnish information relating to subsurface conditions, based on percolation tests and soil borings or probes. Borings to determine depth to seasonal high water shall be witnessed and be approved by the engineer.
(3) 
No land area, except for single- or two-family residential construction not part of a major subdivision, shall be developed such that:
(a) 
The volume and/or rate of stormwater runoff occurring at the area is increased over what occurred there under conditions existing on or before the effective date of this chapter. The Planning Board engineer shall determine storm frequencies to be used in the design of stormwater management facilities.
(b) 
The drainage of adjacent areas is adversely affected.
(c) 
Soil erosion during and after development is increased over what naturally occurs there.
(d) 
Soil absorption and groundwater recharge capacity of the area is decreased below the conditions existing on or before the effective date of this chapter.
(e) 
The natural drainage pattern of the area is significantly altered.
(4) 
In order to duplicate as nearly as possible natural drainage conditions, regulation and control of stormwater runoff and erosion shall be through on-site stormwater retention and/or ground absorption systems which include, but are not limited to, the following:
(a) 
Detention areas, which may be depressions in parking areas, excavated basins or basins created through use of curbs, or any other form of grading which serves to temporarily impound and store water.
(b) 
Rooftop storage through temporary impoundment and storage of stormwater on flat or slightly pitched building rooftops by use of drain outlets which restrict the stormwater runoff from the roof surface.
(c) 
Dry wells or leaching basins which control stormwater runoff through ground absorption and temporary storage.
(d) 
Retention of natural vegetation to the greatest extent possible which preserves the natural ground-absorption capacity of the site.
(e) 
Any system of porous media, such as gravel trenches drained by porous wall or perforated pipe, which temporarily stores and dissipates stormwater through ground absorption.
(f) 
Any combination of the above mentioned or other techniques, as approved by the City Engineer, which serve to limit and control stormwater runoff from a given site.
(5) 
Stormwater retention facilities shall be designated so that the peak rate and volume of surface runoff that occurred prior to development is not exceeded after development. The engineer shall submit calculations, based on the following table, verifying that the above criteria is met for the two-, ten- and fifty-year storms. Calculations shall be based on a twenty-four-hour storm event in accordance with United States Soil Service Technical Release No. 55 or the Soil Conservation Service National Engineering Handbook.
New Jersey Twenty-Four Hour Rainfall
County of Atlantic
(inches)
1-year
2-year
5-year
10-year
25-year
50-year
100-year
2.8
3.5
4.5
5.5
6.2
6.8
7.6
(6) 
The weighted CN (curve number) shall be determined for each site for both existing and proposed conditions, and the difference shall be used to compute the volume of excess for the design of stormwater retention facilities. The volume is equal to the depth of the rainfall excess multiplied by the area of the site.
(7) 
The outlet for any stormwater retention facility shall be designed such that the discharge rate does not exceed the peak runoff rate for conditions existing on or before the effective date of this chapter such that there is no adverse effect on any other property.
(8) 
In the case of detention facilities utilizing porous media for ground absorption, such as dry well, porous media shall be large enough to contain the total volume of rainfall excess within the voids. Ground absorption systems shall be used only where the soil infiltration rate is acceptable, as determined by percolation tests and soil borings provided by the developer and witnessed by the reviewing engineer. Seasonal high groundwater shall be determined by the mottling method or other approved methods.
(9) 
If a combination of different retention techniques is used, combined volume of the systems shall be large enough to fully contain the total volume of rainfall excess.
(10) 
Stormwater retention facilities shall be maintained regularly by the owner to ensure continual functioning of the systems at design capacity and to prevent the health hazards associated with debris buildup and stagnant water.
(11) 
As-built plans (two sets) shall be submitted to the City after construction. They shall reflect all or any revisions made in the stormwater management plan during construction.
[1997 Code § 224-159]
Landscape plans for major subdivisions and commercial and residential site plans shall utilize plant material from the following list:
Suggested Landscape Plants for the City of Absecon City
Scientific Name
Common Name
Deciduous shade trees
Acer Pseudoplatanus
Sycamore Maple
Acer Rubram
Red Maple
Amelanchier Candensis
Shadblow Serviceberry
Betula Populifolia
Gray Birch
Celtis Australis
European Hackberry
Crataegus Oxyacantha
English Hawthorn
Crataegus Crus-galli
Cockspur Hawthorn
Crataegus Phaenopyrum
Washington Hawthorn
Elaeagnus Augustifolia
Russian Olive
Fraxinus Pennsylvania
Green Asb
Fraxinus Pennsylvania Lanseolata
Marshall's Seedless Green
Marshall's Seedless
Ash
Ginkgo Biloba
Ginkgo
Gleditsia Triacanthos "inermis"
Thornless Honeylocust
Liquidambar Styraciflua
Sweetgum
Magnolia Virginia
Sweetbay Magnolia
Nyssa Svlvatics
Black Tupelo
Ostrya Virginia
Hop Hornbeam
Platanus X Acerifolia
London Plane
Populus Alba
White Popular
Pyrus Calleryana "Bradford"
Bradford Callery Pear
Quercus Alba
White Oak
Quercus Bicolor
Swamp White Oak
Quercus Palustris
Pin Oak
Quercus Phellos
Willow Oak
Quercus Rubra
Red Oak
Sassafras Albidum Officinale
Sassafras
Saliz Species
Willow Species
Sophora Japonica
Japanese Pagoda Tree
Tilia Cordata
Littleleaf Linden
Zelkova Serrata
Japanese Zelkova
Evergreen trees
Cedrus Atlantica
Atlas Cedar
Chamaecyparis Thiodes
White Cedar
Ilex Opaca
American Holly
Juniperus Virginia
Eastern Red Cedar
Picea Species
Spruces
Picea Pungens Glauca
Colorado Blue Spruce
Pinus Mugo
Swiss Mountain Pine
Pinus Nigra
Austrian Pine
Pinus Rigida
Pitch Pine
Pinus Sylvestris
Scotch Pine
Pinus Thunbergii
Japanese Black Pine
Taxus Cuspidata
Japanese Yew
Thuja Occidentalis
American Arborvitae
Small trees
Acer Ginnala
Amur Maple
Acer Palmatum
Japanese Maple
Amelanchier Canadensis
Shadblow Serviceberry
Betula Pendula
European Birch
Betula Populifolia
Gray Birch
Carpinus Caroliniana
American Hornbeam
Comus Florida
Flowering Dogwood
Comus Florida Rubra
Pink Flowering Dogwood
Comus Kousa
Japanese Dogwood
Comus Mas
Comelian-cherry Dogwood
Crateagus Crus-galli
Cockspur Thom
Crateagus Phaenopyrum
Washington Hawthorn
Elaeagnus Angustifolia
Russian Olive
Magnolia Soulangiana
Saucer Magnolia
Magnolia Stellata
Star Magnolia
Magnolia Virginiana
Sweetbay Magnolia
Malus Floribunda
Japanese Flowering Crab Apple
Malus X "Katherine"
Katherine Crab Apple
Malus X "Hopa"
Hopa Crab Apple
Malus Sargentii
Sargent Crab Apple
Malus X Zumi Calocarpa
Zumi Crab Apple
Ostrya Virginiana
Hop Hornbeam
Phellodendron Amurense
Amur Cork Tree
Prunus Sargentii
Sargent Cherry
Prunus Serrulata "Kwanzan"
Kwanzan Cherry
Prunus Serotina
Wild Black Cherry
Prunus Subhirtella Pendula
Weeping Cherry
Prunus Virginiana
Chokecherry
Prunus Yedoensis
Yosbino Cherry
Pyrus Calleryana "Bradford"
Bradford Callery Pear
Sophora Japonica
Japanese Pagoda Tree
Styrax Japonica
Japanese Snowbell
Evergreen shrubs
Berberis Species
Barberry
Ilex Species
Holly
Juniperus Species
Junipers
Kalmia Latifolia
Mountain Laurel
Leucothoe Species
Leucothoe
Mahonia Species
Mahonia
Myrica Pennsylvanica
Bayberry
Pieris Floribunda
Mountain Andromeda
Pieris Japonica
Rhondodendrons
Rhododendron Species
Yews
Taxus Cuspidata
Japanese Yew
Deciduous shrubs
Abelia X Grandiflora
Glossy Abelia
Amelanchier Species
Serviceberries
Aronia Arbutiflia
Red Chookberry
Berberis Species
Barberry
Clethra Alnifolia
Summersweet
Cornus Stolinifera
Redosier Dogwood
Cotoneaster Species
Cotoneasters
Euonymus Bungeanus
Winterberry
Ilex Species
Ilexes
Ligustrum Species
Privet
Lonicera Species
Honeysuckles
Prunus Maritima
Beach Plum
Rhus Typhina
Staghorn Sumax
Rosa Species
Roses
Spirea Species
Spireas
Syringa Species
Lilacs
Vaccinium Species
Blueberries
Viburnum Species
Viburnums
Groundcover
Arctostaphylos uva-ursi
Bearberry
Cotoneaster Horizontalis
Rock Cotoneaster
Cotoneaster Apiculata
Cranberry Cotoneaster
Hedera Helix
English Ivy
Hemerocallis Fulva
Common Daylily
Juniperus Species
Junipers
Juniperus Horizontalis
Creeping Juniper
Juniperus Horizontalis "Plumosa"
Andorra Juniper