[Ord. No. 678 §1(Art. 2A), 1-10-2005]
This Chapter shall apply to all areas within the jurisdiction of the City of Oakland, Missouri, identified as numbered and unnumbered A Zones and AE Zones on the Flood Insurance Rate Map (FIRM) and Flood Boundary and Floodway Map (FBFM) dated August 23, 2000, as amended, and any future revisions thereto. In all areas covered by this Chapter, no development shall be permitted except through the issuance of a floodplain development permit granted by the Board of Aldermen or its duly designated representative under such safeguards and restrictions as the Board of Aldermen or the designated representative may reasonably impose for the promotion and maintenance of the general welfare, health of the inhabitants of the community, and as specifically noted in Article
V.
[Ord. No. 678 §1(Art. 2B), 1-10-2005]
The Mayor or his/her designee is hereby designated as the Floodplain
Administrator under this Chapter.
[Ord. No. 678 §1(Art. 2C), 1-10-2005]
No development located within the special flood hazard areas
of this community shall be located, extended, converted or structurally
altered without full compliance with the terms of this Chapter and
other applicable regulations.
[Ord. No. 678 §1(Art. 2D), 1-10-2005]
It is not intended by this Chapter to repeal, abrogate or impair
any existing easements, covenants or deed restrictions. However, where
this Chapter imposes greater restrictions, the provisions of this
Chapter shall prevail. All other ordinances inconsistent with this
Chapter are hereby repealed to the extent of the inconsistency only.
[Ord. No. 678 §1(Art. 2E), 1-10-2005]
In their interpretation and application, the provisions of this
Chapter shall be held to be minimum requirements, shall be liberally
construed in favor of the Governing Body and shall not be deemed a
limitation or repeal of any other powers granted by State Statutes.
[Ord. No. 678 §1(Art. 2F), 1-10-2005]
The degree of flood protection required by this Chapter is considered
reasonable for regulatory purposes and is based on scientific and
engineering methods of study. Larger floods may occur on rare occasions
or the flood heights may be increased by manmade or natural causes
such as ice jams and bridge openings restricted by debris. This Chapter
does not imply that areas outside the floodway and flood fringe or
land uses permitted within such areas will be free from flooding or
flood damages. This Chapter shall not create a liability on the part
of the City of Oakland, any officer or employee thereof, for any flood
damages that may result from reliance on this Chapter or any administrative
decision lawfully made thereunder.
[Ord. No. 678 §1(Art. 2G), 1-10-2005]
If any Section, clause, provision or portion of this Chapter
is adjudged unconstitutional or invalid by a court of appropriate
jurisdiction, the remainder of this Chapter shall not be affected
thereby.