Applicants of small projects, minor and major plans are encouraged
to schedule a pre-application meeting to review the overall stormwater
management concept with Borough staff/engineer. The pre-application
meeting is not mandatory and shall not constitute formal filing of
a plan with the Borough. Topics discussed may include the following:
A. Available geological maps, plans and other available data provided
by the applicant.
B. Findings of the site analysis including identification of any environmentally
sensitive areas, wellhead protection areas, riparian corridors, hydrologic
soil groups, existing natural drainageways, karst features, areas
conducive to infiltration to be utilized for volume control, etc.
C. Results of infiltration tests.
D. Applicable Borough Subdivision and Land Development and/or Zoning
Ordinance provisions.
E. The conceptual project layout, including proposed structural and
nonstructural BMPs.
Approval of an SWM site plan shall be valid for a period of one year unless extended by the Borough. Any time extensions shall not exceed four additional years for a total of five years. This time period shall commence on the date that the Borough approves the SWM site plan. If a certificate of completion as required by §
161-51 has not been submitted within the specified time period, then the Borough may consider the SWM site plan disapproved and may revoke any and all permits issued by the Borough. SWM site plans that are considered disapproved by the Borough of Denver may be resubmitted in accordance with Article
IV of this chapter.