[Ord. No. 1954 §2, 1-7-1997; Ord. No. 2251 §1, 11-6-2001; Ord. No. 2544 §§1 — 3, 2-20-2007; Ord. No. 3010, 8-1-2017; Ord. No. 3352, 12-20-2022]
A certain document, copies of which are on file in the office of the City Clerk of the City of Pacific, being marked and designated as the 2018 International Mechanical Code as published by the International Code Council, is hereby adopted as the Mechanical Code of the City of Pacific and the terms of said Mechanical Code are hereby referred to, adopted and made a part hereof as if fully set out in this Section with the additions, insertions, deletions and changes, if any, described in Section 500.080.
[Ord. No. 1954 §2, 1-7-1997; Ord. No. 2251 §2, 11-6-2001; Ord. No. 2544 §§1 — 2, 4, 2-20-2007; Ord. No. 3010, 8-1-2017; Ord. No. 3352, 12-20-2022]
The following Sections of the International Mechanical Code,
2018 Edition, are hereby revised as follows:
1.
M101.1 Title: Insert: These regulations shall be known
as "the Mechanical Code of the City of Pacific, Missouri," hereinafter
referred to as "this code."
2.
M106.4.3 Expiration: Change: every permit issued shall
become invalid after three hundred sixty-five (365) days of issuance.
The Code Official is authorized to grant, in writing, one (1) or more
extensions of time, for a period not more than one hundred eighty
(180) days each. The extension shall be requested in writing and justifiable
cause demonstrated.
3.
M106.5.2 Fee Schedule: Insert: The fees for mechanical
work shall be paid in accordance with the schedule of fees as established
by City of Pacific ordinance.
4.
M106.5.3 Fee Refunds: Delete in its entirety.
5.
M108.4 Violation Penalties: Delete in its entirety and add the following: Any person who shall violate a provision of this code or shall fail to comply with any of the requirements thereof or who shall erect, install, alter or repair mechanical work in violation of the approved construction documents or directive of the Code Official, or of a permit or certificate issued under the provisions of this code, shall be guilty of an ordinance violation and is punishable as provided in Section 100.170 of the Code of Ordinances of the City of Pacific.
6.
M108.5 Stop Work Orders: Delete in its entirety and
add the following: Upon notice from the Code Official, work on any
mechanical system that is being done contrary to the provisions of
this code or in a dangerous or unsafe manner shall immediately cease.
Such notice shall be in writing and shall be given to the owner of
the property, or the owner's agent, or to the person doing the
work. The notice shall state the condition under which work is authorized
to resume. Where an emergency exists, the Code Official shall not
be required to give a written notice prior to stopping of work. Any
person who shall continue any work in or about the structure after
being served a stop work order, except such work as the person is
directed to perform to remove a violation or unsafe condition, shall
be guilty of an ordinance violation punishable as provided in Section 100.170 of the Code of Ordinances of the City of Pacific.
7.
M508.1.1.2 Make-up Air Shutdown: Mechanical make-up
air systems shall automatically shut down at the time of discharge
of the fire extinguishing system.