[Ord. 550, 6/8/2011]
Fees shall be established by the municipality to cover plan review and construction inspection costs incurred by the municipality. All fees shall be paid by the applicant at the time of SWM site plan submission. A review and inspection fee schedule shall be established by resolution of the municipal governing body based on the size of the regulated activity and based on the municipality's costs for reviewing SWM site plans and conducting inspections pursuant to §
17-501. The municipality shall periodically update the review and inspection fee schedule to ensure that review costs are adequately reimbursed.
[Ord. 550, 6/8/2011]
The fees required by this chapter (unless otherwise waived by
the municipality) shall, at a minimum, cover:
B. The review of the stormwater (SWM) site plan by the municipality.
C. The review of as-built drawings.
E. The inspection of SWM facilities and drainage improvements during
construction.
F. The final inspection at the completion of the construction of the
SWM facilities and drainage improvements presented in the SWM site
plan.
G. Any additional work required to enforce any permit provisions regulated
by this chapter, correct violations and assure proper completion of
stipulated remedial actions.