[Ord. No. 1527 §1, 8-7-2006]
A. 
The ROW user shall coordinate the placement of facilities in a manner that minimizes adverse impact on any public improvement as reasonably determined by the City. Where placement is not regulated, the facilities shall be placed with adequate clearance from such public improvements so as not to impact or be impacted by such public improvement.
B. 
All facilities shall be located and laid so as not to disrupt or interfere with any pipes, drains, sewers, irrigation systems or other structures or public improvements already installed. In addition, the ROW user shall, in doing excavation or work in connection with its facilities, avoid, so far as may be practicable, disrupting or interfering with the lawful use of the streets, alleys, sidewalks or other public lands of the City.
C. 
All facilities of the ROW user shall be placed so that they do not interfere with the use of right-of-way and public lands. The City, through its City Inspector, shall have the right to consult and review the location, design and nature of the facility prior to installation.
D. 
The ROW user shall not interfere with the facilities and structures of the other ROW users without their permission. If and when the City requires or negotiates to have a ROW user cease using its existing poles and to relocate its facilities underground, all other ROW users using the same poles shall also relocate their facilities underground at the same time. The cost of such relocation shall be borne in accordance with this Article and the Commission approved applicable tariff governing that ROW user.
E. 
All facilities and other appurtenances laid, constructed and maintained by the ROW user shall be laid, constructed and maintained in accordance with acceptable engineering practice and in full accord with any and all applicable engineering codes adopted or approved by the City, the Code, applicable Statutes of the State of Missouri and rules and regulations of the FCC, the Commission or any other local, State or Federal agency having jurisdiction over the ROW user.
F. 
The ROW user shall cooperate promptly and fully with the City and take all reasonable measures necessary to provide accurate and complete on-site information regarding the nature and location of its facilities within the right-of-way, both underground and overhead, when requested by the City or its authorized agent for a public improvement. Such location and identification shall be at the sole expense of the ROW user without any expense to the City, its employees, agents or authorized contractors.
G. 
Unless otherwise agreed to by the City and the ROW user by license, agreement or permit, the City shall not be liable for any damage to or loss of any of the ROW user's facilities within the right-of-way unless the damage is the result of the sole negligence or willful, intentional or malicious acts or omissions of the City.
[Ord. No. 1527 §1, 8-7-2006]
A. 
In the event that the ROW user shall sell, lease, assign, sublet or dispose of its facilities or any portion thereof that are located in the right-of-way or any right, title or interest in the same or transfer any rights granted by the City to any person either by forced or involuntary sale or by ordinary sale, consolidation or otherwise, the ROW user shall notify the City of the same. In such case, the buyer, transferee, lessee or assignee shall be subject to all provisions of this Article, including the requirement to register. This provision shall not apply to the sale of property or equipment in the normal course of business or to the sale or lease of facilities to reseller ROW users. No notice to the City shall be required for a transfer in trust, mortgage or other similar instrument, in whole or in part, to secure an indebtedness or for a pro forma transfer to a corporation, partnership or other entity controlling, controlled by or under common control with the ROW user.
B. 
A ROW user may permit and has the authority to sell, sublet or lease any use of excess capacity and sell services for resale to any reseller service provider providing service within the City, including the ROW user's subsidiary or affiliate. The reseller service provider shall first register and obtain any necessary permit, license, certification, grant, registration, franchise agreement or any other authorization required by any appropriate governmental entity including, but not limited to, the City, the FCC or the Commission. The ROW user shall also provide the City, on at least a semi-annual basis, the identity of entities with which the ROW user has entered into an interconnection and/or resale agreement within the City.
This notice will not relieve the reseller service provider from its own obligation to register and obtain any necessary franchise with the City. Nothing in this Article shall prevent a facility based service provider from providing to any reseller service provider the use of the facility based service provider's facilities in the right-of-way as authorized by Federal or State law.
[Ord. No. 1527 §1, 8-7-2006]
The City Inspector may designate specific utility corridors by assigning specific locations for each type of facility that is currently or that the City Inspector expects will someday be located within the right-of-way. All right-of-way permits issued by the City Inspector shall indicate the proper location for the ROW user's facilities. Specific locations may be specified by the City and can include reservation of space for any planned or future anticipated uses of the City in its sole discretion.
[Ord. No. 1527 §1, 8-7-2006]
If, in the preparation and planning of a public improvement, the City Inspector deems it appropriate for a conduit to be constructed by the City along, across or under the right-of-way, the City Inspector shall contact all appropriate ROW users for their input on the planning and design of such conduit. If a ROW user desires to construct, maintain or operate facilities along such right-of-way concurrently, the City Inspector may allow the ROW user to use such conduit if the ROW user agrees to contribute to the expense of such conduit.
[Ord. No. 1527 §1, 8-7-2006]
A. 
Applicants may apply jointly for right-of-way permits to excavate the right-of-way at the same time and place. Applicants who apply jointly for a right-of-way permit may share in the payment of the right-of-way permit fee. Applicants must agree among themselves as to the portion each shall pay.
B. 
The ROW user shall participate in any joint planning, construction and advance notification of excavation or work, including coordination and consolidation of excavation or work as required by the City Inspector. In addition, the ROW user shall cooperate with other ROW users and the City for the best, most efficient, most aesthetic and least obtrusive use of the right-of-way.
[Ord. No. 1527 §1, 8-7-2006]
A. 
A ROW user shall promptly relocate or adjust any facilities located in the right-of-way as directed by the City for a public improvement. The ROW user shall promptly remove, relocate or adjust any facilities located in the right-of-way as directed by the City which create a threat to public safety. Such removal, relocation or adjustment shall be performed by the ROW user at the ROW user's sole expense without expense to the City, its employees, agents or authorized contractors and shall be specifically subject to rules, regulations and schedules of the City pertaining to such. The ROW user shall proceed with the removal, relocation or adjustment of facilities with due diligence upon notice by the City to begin removal, relocation or adjustment.
B. 
The ROW user shall promptly relocate or adjust any facilities located in private easements for the construction of a public improvement at the cost of the ROW user if:
1. 
The City has condemned the private easement or the City has purchased from the ROW user the portion of the private easement necessary for the public improvement; and
2. 
The City has compensated the ROW user, through the condemnation, purchase process or other means of compensation, for the cost of relocation of the ROW user's facilities.
C. 
As soon as the City has prepared working drawings available for public improvements that will require the ROW user to relocate or adjust its facilities, the City shall provide the ROW user with written notice of required relocations or adjustments, the anticipated bid letting date of the public improvement and notice of the deadline for completion of the relocations or adjustments. The ROW user shall respond with any conflicts and a proposed construction schedule within thirty (30) days, subject to approval by the City Inspector.
D. 
Following delivery of final design plans for such public improvements, the ROW user shall relocate or adjust its facilities in accordance with the schedule set by the City Inspector, provided the project is not delayed by adverse weather conditions and other factors beyond the control of the ROW user. The ROW user shall certify to the City, in writing, that its facilities have been relocated or adjusted in accordance with project plans provided by the City so as to allow the City and its contractors to proceed with the public improvement.
E. 
If any facilities are not relocated in accordance with this Section, the City or its contractors may relocate the facilities. The ROW user and its surety shall be liable to the City for any and all costs incurred by the City.
F. 
In the event the ROW user is required to move its facilities in accordance with this Section, any ordinary right-of-way permit fee shall be waived.
G. 
It is the intent of this Section for both the City and the ROW user to cooperate with one another so that the need for facility relocation is minimized and, when required and feasible, relocations may be completed prior to receipt of bids by the City for a public improvement.
H. 
Failure to comply with the relocation schedule set by the City Inspector will subject the ROW user to penalties as provided in Article XI hereof.
[Ord. No. 1527 §1, 8-7-2006]
A. 
A ROW user owning abandoned facilities in the right-of-way must notify the City of its intent to abandon the facilities and must either:
1. 
Remove its facilities and replace or restore any damage or disturbance caused by the removal at its own expense. The City Inspector may allow underground facilities or portions thereof to remain in place if the City Inspector determines that it is in the best interest of public safety to do so. At such time, the City may take ownership and responsibility of such abandoned facilities left in place; or
2. 
Provide information satisfactory to the City that the ROW user's obligations for its facilities in the right-of-way have been lawfully assumed by another authorized ROW user; or
3. 
Submit to the City a proposal and instruments for transferring ownership of its facilities to the City. If the ROW user proceeds under this Subsection, the City may, at its option, purchase the equipment, require the ROW user, at its own expense, to remove it or require the ROW user to post a bond in an amount sufficient to reimburse the City for reasonable anticipated costs to be incurred to remove the facilities, except as otherwise provided herein.
B. 
If the City discovers abandoned facilities in its right-of-way and the owner of the abandoned facilities fails to respond within thirty (30) days to a written notice sent by the City stating that the City considers the facilities abandoned or the City is unable to locate the owner of the abandoned facilities after reasonable attempts, the City shall deem the facilities to be abandoned, unless the City receives confirmation that the ROW user intends to use the facilities. Abandoned facilities are deemed to be a nuisance. The City may exercise any remedies or rights it has at law or in equity including, but not limited to:
1. 
Abating the nuisance,
2. 
Taking possession and ownership of the facility and restoring it to a useable function, or
3. 
Requiring the removal of the facility by the ROW user.
[Ord. No. 1527 §1, 8-7-2006]
A. 
If the City vacates a right-of-way which contains the facilities of a ROW user, the vacation requires the relocation of facilities and:
1. 
Vacation proceedings are initiated by the ROW user and then the ROW user must pay the relocation costs.
2. 
Vacation proceedings are initiated by the City and then the ROW user must pay the relocation costs unless otherwise agreed to by the City and the ROW user.
3. 
Vacation proceedings are initiated by a person other than the ROW user or the City and then such other person must pay the relocation costs, unless otherwise agreed.