All construction in the City shall comply with the requirements
of Sections 319.200 through 319.207, RSMo., and any amendments thereto,
relating to earthquakes and seismic construction requirements.
[Ord. No. 179 §§2 —
3, 12-2-1980; Ord. No.
337 §§1 — 3, 10-3-2000; Ord. No. 2005-05 §1, 12-6-2005; Ord. No. 2017-009, 9-12-2017; Res.
9-12-2017[1]; Ord. No. 2018-010, 6-12-2018; Ord. No. 2019-009, 7-3-2019]
A.
The
Board of Aldermen does hereby adopt a Development Application and
Building Permit Fee Schedules to be in effective until amended by
the Board.
Development Application And Building Permit Fee Schedules
| ||
---|---|---|
Type of Application
|
Fees
| |
Rezoning
|
$250.00
| |
Special Use Permit
|
$100.00
| |
Development Plan Applications:
| ||
Minor Development Plan
|
$100.00
| |
Preliminary Development Plan
|
$100.00
| |
Final Development Plan
|
$100.00
| |
Change of Use Permit
|
$100.00
| |
Vacation (Vacating of Land)
|
$100.00
| |
Variance (BZA)
|
(City does not presently have a variance plan)
$100.00
| |
Appeals (BZA)
|
(City does not presently have a variance plan)
$100.00
| |
Sign and Billboard Permits:
| ||
Sign Permit
|
$100.00
| |
Billboard Sign Permit
|
No Fee - Business License issued for 1 year $1,000.00
| |
Digital Billboard Permit
|
$2,000.00
| |
Fireworks Signs
|
1 free/$50.00 per each additional sign over 6 sq. ft. (2 ft.
by 3 ft.)
| |
Temporary Sign Permit
|
$50.00
| |
Cell Tower Permit/License/Communication
|
$1,500.00
| |
Cell Tower Repair/Upgrade
|
$250.00
| |
Fence Permit
|
(drawing/description required) $75.00
| |
Building Permits:
| ||
New Home Plans
|
(7 inspections - deck is an additional charge)
$950.00
| |
Room Addition
|
$450.00
| |
(Structural – additional permits needed for electrical,
mechanical/HVAC, plumbing)
| ||
Remodeling
|
$250.00
| |
Decks
|
$250.00
| |
Roofs
|
No fees
| |
Fence Permit
|
(Height 6 feet front, 48 inches back)
| |
No fee
| ||
(If different – drawing/description required)
| ||
$75.00
| ||
Tenant Finish
|
$250.00
| |
Detached Garage
|
$450.00
| |
Sheds over 200 sq. ft.
|
$250.00
| |
New Commercial Building
|
Up to 10,000 sq. ft = $1,500.00
+ additional 1,000 sq. ft. = $50.00
| |
Mechanical, Electrical and Plumbing
| ||
Commercial Building
|
$100.00
| |
Residential
|
$100.00
| |
Demolition Permit (liability insurance, appropriate safety measures
and debris cleaning required)
|
$250.00
| |
Right-of-Way Permit
|
$20.00
| |
Court Reporter and transcript fees
|
Down payment $300.00
plus balance of actual fees incurred
|
[1]
Editor's Note: Ord. No. 2017-009 set out the provisions in Ch. 415 and repealed this Section, previously titled Fees, and Resolution dated 9-12-2017 added the regulations regarding Development Application and Building Permit Fee Schedules. At the City's direction we have placed these regulations in the Code as an updated Section 500.020.