[HISTORY: Adopted by the Board of Selectmen of the Town of Conway 1-23-1959. Amendments noted where applicable.]
GENERAL REFERENCES
Building construction — See Ch. 23.
Excavations — See Ch. 47.
Sewers — See Ch. 105.
Site plan review — See Ch. 110.
Streets and sidewalks — See Ch. 125.
Subdivision of land — See Ch. 130.
No connections shall be made to any part of the Town highway storm drainage system for any purpose, except for the drainage of surface runoff water.
A. 
No connections shall be made to any part of the Town highway storm drainage system for the purpose of surface water disposal without the written permission of the Board of Selectmen.
B. 
Application for such connection must be made in writing to the Board of Selectmen and must be accompanied by a sketch showing the location of the proposed connection and the area to be drained.
This chapter does not affect connections to the Town highway drainage system existing on this date.
[Amended 4-11-2017 ATM by Art. 29]
Any person violating this chapter shall be fined a sum as set from time to time by the Board of Selectmen. Each day of violation shall be considered a separate offense.