[Ord. No. 508 §1, 11-4-2002]
In the Board of Aldermen and Commission's consideration of applications for plat approval, the standards as set forth in this Chapter shall be considered minimum requirements.
Before streets are constructed, soil tests shall be performed on the subgrade by a licensed soil-testing firm and submitted to the City Engineer for approval. Soil tests by a licensed soil-testing firm for every two (2) feet of fill, on all fill areas in the roadways shall also be submitted to the City Engineer for approval. No traffic will be allowed on newly constructed streets until it has cured for at least seven (7) days, and has reached four thousand (4,000) psi, as certified by an Engineering Test Lab. The street shall not be approved unless it reaches four thousand (4,000) psi. |