(a)
New and tenant-finish FSEs shall be required to submit three copies of facility site plans, floor plans, mechanical and plumbing plans, and details to show all sewer locations and connections, grease control devices or other pretreatment equipment and appurtenances by size, location, and elevation for evaluation. The submittal shall also include a description of any food processing that is or will occur on site, including but not limited to the type of food service (sit down or take out), types of cooking (saute, deep fry, etc.), a description of the menu, and a list of kitchen fixtures with potential to contribute FOG to the sanitary sewer; schematics of process areas illustrating drains and discharge points connected to the sewer; and specific performance goals and implementation schedule, including cleaning frequency and waste disposal procedures if the business will self-clean grease traps. The submittal may be submitted online or to the Director or Director's designee, in a form and content acceptable to the City for expeditious review prior to construction. The review of the plans and procedures shall in no way relieve the FSE of the responsibility of modifying the facility or procedures in the future, as necessary to produce an acceptable discharge, and to meet the requirements of this article or any requirements of other regulatory agencies. The Director will confer with the Codes Department and IPC to determine the adequacy of the proposed FOG control mechanism(s), and may require changes to the plans when needed.
(b)
The Director or Codes Office may require the drawings be prepared by a Maine registered professional engineer.