home
Home
code
Code
Code
Index
law
Laws (0)
New Laws (0)
pubdocs
Public Documents
Public Documents
Resolutions (295)
help_center
Help
Help
About Us
ecode
ecode
search
warning
Login
Township of Ferguson, PA
chevron_right
2023-02-07
info
chevron_right
MUNICIPAL CODE
chevron_right
Chapter 21 Streets and Sidewalks
chevron_right
Part 1 PAVE CUT AND RIGHT-OF-WAY OCCUPANCY
FOREWORD
Ch FWD
Foreword
ADOPTING ORDINANCE
Ch AO
Adopting Ordinance
HOME RULE CHARTER
Ch HRC
Home Rule Charter
MUNICIPAL CODE
Ch 1
Administration and Government
Ch 2
Animals
Ch 3
Anti-Discrimination
Ch 4
Buildings
Ch 5
Code Enforcement
Ch 6
Conduct
Ch 7
Fire Prevention and Fire Protection
Ch 8
(Reserved)
Ch 9
(Reserved)
Ch 10
Health and Safety
Ch 11
Housing
Ch 12
(Reserved)
Ch 13
Licenses, Permits and General Business Regulations
Ch 14
Mobile Homes and Mobile Home Parks
Ch 15
Motor Vehicles and Traffic
Ch 16
Parks and Recreation
Ch 17
(Reserved)
Ch 18
Sewers and Sewage Disposal
Ch 19
Signs and Billboards
Ch 20
Solid Waste
Ch 21
Streets and Sidewalks
Ch 21 Pt 1
PAVE CUT AND RIGHT-OF-WAY OCCUPANCY
Ch 21 Pt 1 Art A
General.
ยงย 21-101
Name.
Ch 21 Pt 1 Art B
Definitions.
ยงย 21-111
Definitions.
Ch 21 Pt 1 Art C
Permits.
ยงย 21-121
Permit Procedure.
ยงย 21-122
Penalty for Failure to Obtain a Permit.
ยงย 21-123
Penalties.
Ch 21 Pt 1 Art D
Construction Procedures.
ยงย 21-131
Road Closing.
ยงย 21-132
Time Periods for Pave Cut Restoration.
ยงย 21-133
Scheduling.
ยงย 21-134
Excavated Material and Waste Material.
ยงย 21-135
Opening of a Street.
ยงย 21-136
Responsibility for Damages.
ยงย 21-137
Backfilling.
ยงย 21-138
Temporary Restorations.
ยงย 21-139
Permanent Restoration.
ยงย 21-140
Restoration - Special.
ยงย 21-141
Linestone and Monuments.
ยงย 21-142
Test Borings.
ยงย 21-143
Replacement of Pavement Markings.
ยงย 21-144
Replacement of Electronic Traffic Control Devices and Ancillary Equipment.
ยงย 21-145
Testing and Inspection.
ยงย 21-146
Repaving and Reconstruction.
ยงย 21-147
Preparation of Streets for Paving, Repair, or Construction.
ยงย 21-148
Determination of Lines and Grades by the Engineer.
ยงย 21-149
Utility Corridor; Vertical Assignments for New Street Construction.
ยงย 21-150
Horizontal and Aerial Utility Corridors.
ยงย 21-151
Determination of Reimbursement.
ยงย 21-152
Commencement of Utility Relocation Activities.
Ch 21 Pt 1 Art E
Right-of-Way Occupancy.
ยงย 21-161
Application for Permit.
ยงย 21-162
Maintenance of Drainage on Right-of-Way.
ยงย 21-163
Pipe Size Requirements.
ยงย 21-164
Permit.
Ch 21 Pt 1 Art F
Enforcement.
ยงย 21-171
Delegation of Authority to Director of Public Works.
ยงย 21-172
Street Inspectors.
ยงย 21-173
Noncompliance.
ยงย 21-174
Resumption of Suspended Work.
ยงย 21-175
Penalties for Noncompliance.
ยงย 21-176
Non-Issuance.
ยงย 21-177
Effect on Existing Proceedings, Regulations and Contracts.
ยงย 21-178
Penalty for Violation.
Ch 21 Pt 1 Art G
Traffic Control and Protection.
ยงย 21-181
Traffic Control and Protection.
Ch 22
Subdivision and Land Development
Ch 23
(Reserved)
Ch 24
Taxation, Special
Ch 25
Trees
Ch 26
Stormwater Management
Ch 27
Zoning
APPENDIX
Apx A
Annexation of Territory
Apx B
Bond Issues and Loans
Apx C
Franchises and Services
Apx D
Governmental and Intergovernmental Affairs
Apx E
Plan Approval
Apx F
Public Property
Apx G
Sewers
Apx H
Streets and Sidewalks
Apx I
Water
Apx J
Table of Zoning Reclassifications
KEYS
Ch KO
Key to Disposition of All Ordinances
Ch KR
Key to Disposition of Significant Resolutions
Ch PR
Key to Disposition of Petitions and Referenda
arrow_back
print
Print
email
Email
download
Download
share
Share
add_alert
Get Updates
arrow_forward
Part 1
PAVE CUT AND RIGHT-OF-WAY OCCUPANCY
A
General.
chevron_right
ยงย 21-101
Name.
chevron_right
B
Definitions.
chevron_right
ยงย 21-111
Definitions.
chevron_right
C
Permits.
chevron_right
ยงย 21-121
Permit Procedure.
chevron_right
ยงย 21-122
Penalty for Failure to Obtain a Permit.
chevron_right
ยงย 21-123
Penalties.
chevron_right
D
Construction Procedures.
chevron_right
ยงย 21-131
Road Closing.
chevron_right
ยงย 21-132
Time Periods for Pave Cut Restoration.
chevron_right
ยงย 21-133
Scheduling.
chevron_right
ยงย 21-134
Excavated Material and Waste Material.
chevron_right
ยงย 21-135
Opening of a Street.
chevron_right
ยงย 21-136
Responsibility for Damages.
chevron_right
ยงย 21-137
Backfilling.
chevron_right
ยงย 21-138
Temporary Restorations.
chevron_right
ยงย 21-139
Permanent Restoration.
chevron_right
ยงย 21-140
Restoration - Special.
chevron_right
ยงย 21-141
Linestone and Monuments.
chevron_right
ยงย 21-142
Test Borings.
chevron_right
ยงย 21-143
Replacement of Pavement Markings.
chevron_right
ยงย 21-144
Replacement of Electronic Traffic Control Devices and Ancillary Equipment.
chevron_right
ยงย 21-145
Testing and Inspection.
chevron_right
ยงย 21-146
Repaving and Reconstruction.
chevron_right
ยงย 21-147
Preparation of Streets for Paving, Repair, or Construction.
chevron_right
ยงย 21-148
Determination of Lines and Grades by the Engineer.
chevron_right
ยงย 21-149
Utility Corridor; Vertical Assignments for New Street Construction.
chevron_right
ยงย 21-150
Horizontal and Aerial Utility Corridors.
chevron_right
ยงย 21-151
Determination of Reimbursement.
chevron_right
ยงย 21-152
Commencement of Utility Relocation Activities.
chevron_right
E
Right-of-Way Occupancy.
chevron_right
ยงย 21-161
Application for Permit.
chevron_right
ยงย 21-162
Maintenance of Drainage on Right-of-Way.
chevron_right
ยงย 21-163
Pipe Size Requirements.
chevron_right
ยงย 21-164
Permit.
chevron_right
F
Enforcement.
chevron_right
ยงย 21-171
Delegation of Authority to Director of Public Works.
chevron_right
ยงย 21-172
Street Inspectors.
chevron_right
ยงย 21-173
Noncompliance.
chevron_right
ยงย 21-174
Resumption of Suspended Work.
chevron_right
ยงย 21-175
Penalties for Noncompliance.
chevron_right
ยงย 21-176
Non-Issuance.
chevron_right
ยงย 21-177
Effect on Existing Proceedings, Regulations and Contracts.
chevron_right
ยงย 21-178
Penalty for Violation.
chevron_right
G
Traffic Control and Protection.
chevron_right
ยงย 21-181
Traffic Control and Protection.
chevron_right