[Ord. 1399, 7/13/1981, § I; as amended by Ord.
2288, 4/12/2010]
A permit shall be required for all alterations and new connections
of any driveway with any Township street. The application for such
permit shall be obtained from the Building Code Official and shall
indicate the width of the opening, the grade of the driveway and any
change in grading of the street right-of-way. The application shall
also contain a notice that the applicant shall notify the Building
Code Official at least 24 hours in advance of any grading in connection
with the construction of the driveway for pre-inspection by the Building
Code Official.