[Ord. 447, 1/2/2007, § 401]
1.
The following items shall be included in the SWM site plan:
A.
Appropriate sections from the municipal subdivision and land development ordinance shall be followed in preparing the SWM site plans. In instances where the municipality lacks subdivision and land development regulations, the County Subdivision and Land Development Ordinance shall be followed.
B.
The SWM site plan shall provide the following supplemental information:
(1)
The overall stormwater management concept for the project.
(2)
A determination of site conditions in accordance with Appendix 23-B. A detailed site evaluation shall be completed for projects proposed in karst topography.
(3)
Stormwater runoff computations as specified in this chapter.
(4)
Expected project time schedule.
(5)
A soil erosion and sedimentation control plan, where applicable, as prepared for and submitted to the approval authority.
(6)
The effect of the project (in terms of runoff volumes and peak flows) on adjacent properties and on any existing municipal stormwater collection system that may receive runoff from the project site.
(7)
Plan and profile drawings of all SWM BMPs including open channel and swales. Drawings shall indicate hydraulic facility.
(8)
SWM site plan shall show the locations of existing and proposed septic tank infiltration areas and wells.
(9)
A permanent fifteen-foot wide pathway for use by vehicles shall be provided around all SWM BMPs, such as ponds and infiltration structures. The pathways shall connect to a public thoroughfare.
(10)
The following signature block for the Township:
"West Lebanon Township, on this date has reviewed and hereby certify that the SWM site plan meets all design standards and criteria of the Township Ordinance." |