[Ord. 657, 4/9/2015]
Based upon the application submission requirements specified in this Part of this chapter, a developer shall provide the Township with plans, reports and analyses as part of the preliminary and final application submissions. The specifications, contents and requirements of these plans, reports and analyses are described in §§ 22-302 through 22-319. Sections 22-302 through 22-313 generally apply to preliminary applications. Sections 22-314 through 22-319 generally apply to final applications.
[Ord. 657, 4/9/2015]
A preliminary plat, containing the following information, shall be provided to the Township.
A. 
A boundary survey by a surveyor and topographical survey of the total proposed subdivision by an engineer or surveyor. If the developer and/or landowner intends to develop a tract of land in phases, the preliminary plat shall include the total tract. The total plan area, in acreage, shall be stated on the plan.
B. 
The proposed name of the subdivision or land development.
C. 
The name, address, certification and seal of the registered landscape architect, engineer or surveyor who prepared the plat and the registered surveyor who completed the survey shown on the plat.
D. 
The names and addresses of the developer and/or landowner and, if the developer is not the landowner, the names and addresses of the landowner.
E. 
The names of all adjoining property owners.
F. 
The proposed street layout in the subdivision indicating whether the streets are proposed to be public or private.
G. 
The layout of lots (showing scaled dimensions), lot numbers, house numbers as provided by the Township and the area of each lots in square feet.
H. 
Parcels of land proposed to be reserved for schools, parks, playgrounds or other public, semipublic or community purposes, if any.
I. 
A legend of symbols, lines and appropriate explanatory notes.
J. 
Front yard, side yard and rear yard setback lines and any required bufferyards.
K. 
Zoning classification of the area to be developed and/or subdivided.
L. 
The graphic scale, north arrow and application date.
M. 
Existing and proposed easements and rights-of-way, including locations, widths and purpose.
N. 
A location map showing the subdivision/land development name and location, major existing thoroughfares related to the subdivision/land development, including the distance therefrom. The location map shall also include a title, graphic scale and north arrow.
O. 
Contours at intervals of elevation of not more than five feet where the slope is greater than 10% and at intervals of not more than two feet where the slope is 10% or less.
P. 
Existing streets and rights-of-way on or adjoining the site, including dedicated widths, roadway widths, approximate gradients, types and widths of pavements, curbs, sidewalks and other pertinent data.
Q. 
Proposed public improvements. The size of each should be shown and the location of or distance to each existing utility indicated.
R. 
The existing platting and zoning classification of land adjacent to the subdivision, including land located across a public or private street or other right-of-way. All existing buildings, sewers, water mains, culverts, petroleum or high-pressure gas lines, oil wells and fire hydrants on the site or within 200 feet of the site shall be shown.
S. 
Existing watercourses, wetlands and other significant natural features, including tree lines.
T. 
Areas subject to periodic flooding, as identified on the current Flood Insurance Rate Map for the Township issued by the Federal Emergency Management Agency.
U. 
Certificates. All certificates shall comply with the requirements of this chapter and Appendix 22-A and shall be in a form acceptable to the Township Engineer and Township Solicitor.
V. 
Any and all other plans, details, specifications, etc., needed to demonstrate compliance with this chapter, and as required by the Township.
[Ord. 657, 4/9/2015]
Contours shall be illustrated at intervals of elevation of not more than five feet where the slope is greater than 10% and at intervals of not more than two feet where the slope is 10% or less.
[Ord. 657, 4/9/2015]
1. 
At a minimum, the applicant shall conduct a preliminary geotechnical investigation as outlined in this subsection. The intent of the preliminary investigation is to determine the general geologic and subsurface conditions at the site and their impact on development, especially with respect to limitations/constraints on site grading, including cut slope and fill embankment construction and the capacity of natural soils to support development. The preliminary investigation is not to be considered a final, detailed, or comprehensive investigation of proposed site grading, but only a preliminary evaluation of anticipated limitations. It should be an aid to developing conceptual site grading and development plans. This investigation shall include consultation and review of existing maps such as, but not limited to: "Map of Zones Where Land Use Can Be Affected by Landsliding, Flooding, and Undermining," Allegheny County, PA by Reginald P. Briggs and William R. Cohl 1975, USGS Map MF-685D; "Coal Resources of Allegheny County, PA," Part 1, "Coal Crop Lines, Mined-Out Areas and Structure Contours," compiled by Clifford H. Dodge, Mineral Resource Report 89, 1985, by PA DER; Soil Survey of Allegheny County, PA by United States Department of Agriculture Soil Conservation Service.
2. 
The following requirements are encouraged, but not required as part of the preliminary geotechnical investigation:
A. 
Standard penetration tests (SPTs) should be conducted in all test borings at no greater than three-foot vertical intervals in the soil mantle of all borings in compliance with American Society for Testing and Materials (ASTM) Test Designation, D1586-84. Where SPT refusal on bedrock is encountered prior to reaching the required depth, continuous NX, NQ or NQ-2 rock cores should be procured as required for the engineering analysis. Thin-walled steel (shelby) tube samples of relatively undisturbed soil samples should be procured from selected borings, if and where required for physical laboratory testing to determine relevant soil properties for the preliminary engineering analysis.
B. 
Groundwater encountered in each test boring should be recorded during drilling operations and 24 hours after completing each boring.
C. 
The borings should be accurately located in the field. Ground surface elevations should be obtained at each boring. The final boring locations and their ground surface locations must be shown on a to-scale topographical survey in accordance with § 22-303.
D. 
A suitable boring log should be provided for each boring. At minimum, the logs should include: boring designations; SPT results; depths of strata encountered; percent core recoveries and rock quality designations (RQDs) of rock cores; date boring was drilled; groundwater information; types and descriptions of geomaterials encountered; comments or notes regarding voids, boulders, obstructions, or any other unusual subsurface conditions encountered.
E. 
A written report prepared and signed by the professional geotechnical engineer licensed in the Commonwealth of Pennsylvania performing the preliminary geotechnical investigation shall be submitted to the Township. The report should, at a minimum, include: a description of the existing surface and subsurface site conditions; a review of the site geology and geohydrology; a discussion of any slope movements, sloughs, landslides, rock falls, or mining on or adjacent to the site, and an evaluation of their existing and/or potential impact on the site; the test boring logs and laboratory test results and the to-scale boring location plan described above in § 22-304, Subsection 4. The report should also include preliminary geotechnical engineering recommendations regarding apparent limitations/constraints on grading for land development, including apparent stable grades for proposed cut slopes and fill embankment. Any general measures required to provide for long-term stability including, but not limited to, drainage requirements, benching, erosion protection, and subgrade preparation should also be discussed in the report. This preliminary investigation report will not be considered a detailed engineering evaluation of site grading. The Township Engineer shall review the report and shall provide a summary recommendation to the Planning Director and Planning Commission.
F. 
The amount of buildable area as defined in this chapter and the Zoning Ordinance [Chapter 27] may be adjusted depending upon the results of the preliminary geotechnical investigation and pending Township approval.
3. 
Pending the results of the preliminary geotechnical investigation, the Township's geotechnical engineer may request a comprehensive geotechnical investigation.
[Ord. 657, 4/9/2015]
1. 
Completion of a comprehensive geotechnical investigation shall be dependent upon the results of the preliminary geotechnical investigation. The intent of the comprehensive investigation is to determine the stability of proposed grading operations and develop detailed engineered measures to provide for long-term slope stability. Test borings extending to sufficient depths to evaluate proposed grading should be performed. Specifically, borings should be located at the toes (base) of proposed fill embankments supporting roads or structures, or are eight feet or greater in height and will be graded to a slope steeper than 4:1. Sufficient borings should be located in cut slope areas supporting roads or structures, or that is greater than six feet in height and will be graded to a slope steeper than 4.5:1. The borings should extend at least to bedrock surface, but must also extend to a depth of at least five feet beyond the anticipated cut depth.
2. 
Standard penetration tests (SPTs) should be conducted in all test borings at no greater than three-foot vertical intervals in the soil mantle of all borings in compliance with American Society for Testing and Materials (ASTM) Test Designation: D1586-84. Where SPT refusal on bedrock is encountered prior to reaching the required depth, continuous NX, NQ, or NQ-2 rock cores should be procured as required for the engineering analysis. Thin-walled steel (shelby) tube samples of relatively undisturbed soil samples should be procured from selected borings, if and where required for physical laboratory testing, to determine relevant soil properties for the engineering analysis.
3. 
Groundwater encountered in each test boring should be recorded during drilling operations and 24 hours after completing each boring.
4. 
The borings should be accurately located in the field, Ground surface elevations should be obtained at each boring The final boring locations and their ground surface locations must be shown on a to-scale topographical survey (in accordance to § 22-303) that includes existing contours and proposed site grading contours.
5. 
A suitable boring log should be provided for each boring. At minimum, the logs should include: boring designation; SPT results; depths of strata encountered; percent core recoveries and rock quality designations (RQDs) of rock cores; date boring was drilled; groundwater information (minimum zero hour and 24 hour readings); types and descriptions of geomaterials encountered; comments or notes regarding voids, boulders, obstructions, or any other unusual subsurface conditions encountered.
6. 
A professional geotechnical engineer licensed in the Commonwealth of Pennsylvania shall complete a quantitative geotechnical analysis of proposed cut slopes and fill embankments. At minimum, test boring and relevant laboratory soil or rock test results, site groundwater and surface water findings, anticipated surcharge and/or hydrostatic loads/conditions and any other factors affecting the proposed slopes should be included in the analysis. The geotechnical analysis must be based on a method accepted by the geotechnical engineering community, and that has been published in an accepted engineering textbook, journal, or proceeding. The analysis should ultimately provide a factor of safety (FS) against movement/failure of the proposed slope. A slope will generally be considered stable in the long term when the FS>1.5, unless special circumstances, as approved by the Township, should be allowed. Various slope/embankment construction scenarios can be analyzed by the engineer, but no proposed slopes/embankments indicating a FS less than that approved will be deemed acceptable.
7. 
The written report, prepared and signed by the professional engineer performing the geotechnical analyses, shall be submitted to the Township. The report should, at minimum, include a description of the existing surface and, subsurface site conditions, a review of the site geology and geohydrology; a discussion of any slope movements, sloughs, landslides, rock falls, or mining on or adjacent to the site, and an evaluation of their existing and/or potential impact on the site; subsurface profile drawings depicting all relevant parameters of the slopes that were analyzed; a discussion of the geotechnical analyses; conclusion(s) regarding the stability of proposed site grading; the test boring logs and laboratory test results; a copy of the calculations/computer output for the stability analyses; and the to-scale boring location plan described above in Subsection 4. The report should also include geotechnical engineering recommendations, as required for grades for stable cut slopes and fill embankments; drainage requirements, subgrade preparations; benching requirements; suitable fill material, compaction, and moisture requirements, erosion protection requirements, retaining structures, if necessary, and limitations or constraints to proposed slope construction. The report will be generally reviewed by the Township Engineer, who shall provide a summary recommendation to the Planning Director and the Planning Commission.
[Ord. 657, 4/9/2015]
The applicant shall describe the following existing characteristics about the site proposed for development:
A. 
Total site acreage.
B. 
Existing zoning district(s), land use(s) and covenants.
C. 
Existing land characteristics including general topographic form, site accessibility, length of public road frontage, pattern and density of vegetative cover, significant adjacent and long-range views to and from the site, hydrological patterns.
D. 
Relationship of the proposed subdivision and/or land development to adjoining, existing and proposed community facilities which serve or influence the site; available utilities; number of lots and acreage; business areas; playgrounds; main traffic arteries; elementary and high schools; and street improvements.
E. 
Reservations, if any, by the developer and/or landowner of any area designed for use as public grounds shall be suitable size and location for designated uses.
F. 
Land which is subject to flooding, subsidence or underground fires either shall be made safe for the purpose for which such land is proposed to be used, or that such land shall be set aside for use which shall not endanger life or property, or further aggravate or increase existing menace.
G. 
A copy of the option agreement or certificate of title shall be submitted as evidence of the applicant's interest in the property.
[Ord. 657, 4/9/2015]
1. 
Purpose. The purpose of a phase one environmental site assessment is to identify conditions indicative of releases and threatened releases of hazardous substances or petroleum products on, at, in, or onto the subject property. It involves nonintrusive investigative techniques to establish whether the property is likely to be contaminated and if so, to initiate the next level of environment assessment.
2. 
Content. An environmental site assessment, in general conformance with the guidelines established under ASTM standard E 1527-5 on environmental assessments, shall contain the following:
A. 
Records review.
B. 
Site reconnaissance.
C. 
Interviews of persons familiar with the site.
D. 
Report preparation.
3. 
Findings. If the phase one environmental site assessment report indicates that the property is likely to contain recognized environmental concerns, then the applicant must conduct a site investigation in accordance with the ASTM guidelines for a site investigation to identify areas of the property impacted by the environmental concerns and a remedial investigation/feasibility study to identify the full extent of soil and groundwater contamination and to identify and evaluate the feasibility of remediation alternatives, the site investigation and remedial investigation/feasibility study evaluations shall be in conformance with the guidelines of the governing state or federal regulatory agency.
4. 
Waiver. The Board of Supervisors may waive the requirements of this section, upon the applicant's written request and recommendations from both the Environmental Advisory Council and the Planning Commission. Grounds for a waiver include, but are not limited to:
A. 
A proposal presenting a suitable alternative that conforms to the spirit and intention of this chapter.
B. 
Existing physical characteristics of the property that prevent conformance with requirements.
[Ord. 657, 4/9/2015]
An environmental performance standards analysis shall be provided in accordance with Part 3 of the Zoning Ordinance [Chapter 27].
[Ord. 657, 4/9/2015]
A land development plan shall be provided to the Township, containing the following information:
A. 
Drawing scale.
B. 
North arrow.
C. 
The proposed use, location, area, height and bulk of all proposed structures and dimensions of all yards.
D. 
Preliminary building floor plan(s) including square footage of development, types of rooms, door locations, window locations and service area(s).
E. 
The layout of parking areas and a computation of the number of parking spaces and fire lanes to be provided in accordance with the Zoning Ordinance [Chapter 27], this chapter and any other applicable Township ordinance.
F. 
Location, size and specifications for private improvements such as curbs, sidewalks, driveways, parking areas, landscaping strips or planters, wheelstops and the like.
G. 
Street plan indicating street right-of-way and cartway widths, curbs, sidewalks and connections to existing streets.
H. 
Location and specifications for lighting of parking areas and walkways.
I. 
Lot lines (scale dimensions), lot widths, lot areas in square feet and setback lines from adjacent streets.
J. 
Preliminary locations of sanitary sewer, water and gas lines and their connection(s) to existing systems.
K. 
Storm drainage structures, including storm sewers, culverts, inlets, easements, diversion terraces, debris collection basins, etc.
L. 
Grading to show existing contours to remain, new contours and contours to be altered at two-foot intervals.
M. 
Location, size and general layout of areas to be set aside for recreational use, open space, schools or other public, semi-public or community purposes.
N. 
Divisions of the property into phases for development, indicating the boundaries of each phase and the net residential density and number of dwelling units in each phase.
O. 
Dates of preparation and revisions to the plan.
P. 
Evidence of preparation by a registered architect, landscape architect or engineer. A review of the plan may require additional investigation and reports for approval.
Q. 
Any and all other plans, details, specifications, etc., needed to demonstrate compliance with this chapter, and as required by the Township.
[Ord. 657, 4/9/2015]
Building elevation drawings shall be provided to the Township, containing the following information. A plan drawn to scale showing:
A. 
Preliminary front, rear and side elevations of all proposed buildings including building's architectural features, exterior building materials, colors and/or finishes.
B. 
First floor elevations of the building, the height of the building in feet and number of stories and the building's relationship to the finished grade immediately surrounding the building.
C. 
Spot elevations designating the existing and proposed grading.
[Ord. 657, 4/9/2015]
1. 
A conceptual landscape plan shall be provided to the Township, containing the following:
A. 
Drawing scale.
B. 
North arrow.
C. 
Approximate location and spacing of all proposed plant material with typical dimensions by species.
D. 
Botanical and common names of all plant species.
E. 
Indication of plant size to be installed by species.
F. 
Quantities of species.
2. 
A final landscape plan shall be provided to the Township in accordance with §§ 27-214 and 27-215 of the Zoning Ordinance [Chapter 27].
[Ord. 657, 4/9/2015]
1. 
A stormwater management statement shall be provided to the Township and shall contain the following information:
A. 
Total square footage of pervious and impervious surface of proposed development.
B. 
Preliminary calculations of needed stormwater detention and/or retention quantities.
C. 
The approximate location and size of any proposed permanent stormwater management facilities, such as detention basins, storage tanks, sumps, outlet structures, inlets, culverts, debris collection basins, manholes, piping, permanent swales, etc.
D. 
Methods, standards and rates of release to be used in the design of stormwater management facilities.
2. 
The maintenance of the stormwater facility shall be outlined and the responsible party shall be identified.
[Ord. 657, 4/9/2015]
1. 
Traffic Impact Study Required. A traffic impact study shall be submitted to the Township pursuant to the requirements of this section when:
A. 
A proposed land development or subdivision is expected to generate, on average: (1) 100 or more peak hour trips on any adjacent street; or (2) 1,000 or more average daily trips (ADT) on any adjacent street. The estimated number of trips shall be determined by an analysis of similar uses through data collected by the Institute of Transportation Engineers (ITE) or through similar uses acceptable to the Township.
B. 
A proposed land development or subdivision, or change in use, is expected to generate less than the trip criteria referenced in paragraph .A above, but known traffic deficiencies exist in the area of the proposed land development or subdivision, or change in use, as determined by the Township Traffic Engineer. The Township may waive the study requirement for an individual land development or subdivision, or change in use, where the ITE traffic generation data of said proposed land development or subdivision, or change in use, documents a de minimis increase in the number of trips generated.
C. 
In the opinion of the Township Traffic Engineer, the proposed development or change in use is expected to have a significant impact on street-related safety or traffic flow, even if the criteria of paragraph .A or .B above are not met.
D. 
When specifically required by the Zoning Ordinance [Chapter 27] or any other applicable Township ordinance.
2. 
Study Requirements.
A. 
When a traffic impact study is required by this chapter or any other Township ordinance, the study shall comply with the requirements of this section. The study scope, study area and methodology shall be approved by the Township Traffic Engineer prior to the initiation of the study.
B. 
The traffic impact study shall be conducted by an engineer that has verifiable experience in traffic engineering and preparing traffic impact studies. The traffic impact study shall be prepared in accordance with: the ITE's Recommended Practice Traffic Access and Impact Studies of Site Development, current edition; PennDOT Publications 201, 282 and the Policy and Procedures for Transportation Impact Studies, current editions; and the requirements contained in this section.
C. 
The full cost of completing the traffic impact study and of all reviews by the Township Traffic Engineer and other Township officials and professional consultants shall be borne by the applicant.
D. 
The applicant is responsible for ensuring that any submitted subdivision or development plans meet the minimum state and local standards for street geometric and land use design.
E. 
Upon submission of a draft study, the Township may review the data sources, methods, and findings and provide comments in written form. The applicant will then have the opportunity to incorporate the necessary revisions prior to submitting a final study.
3. 
Study Contents. The traffic impact study shall include the following, if appropriate as determined by the Township:
A. 
A brief description of the proposed project in terms of land use and magnitude.
B. 
An inventory and analysis of existing roadway and traffic conditions in the site environs including:
(1) 
Roadway network and traffic control.
(2) 
Existing traffic volumes in terms of peak hours and average daily trips (ADT).
(3) 
Planned roadway improvements by others.
(4) 
Intersection levels of service (LOS).
(5) 
Design and surveyed vehicle speeds.
(6) 
Other measures of roadway adequacy; i.e., lane widths, traffic signal warrants, vehicle studies, etc.
C. 
Proposed site-generated traffic volumes in terms of:
(1) 
Peak hours and ADT (by development phase if required).
(2) 
Arrival/departure distribution including method of determination.
(3) 
Site traffic volumes on study roadways.
D. 
An analysis of future traffic conditions including:
(1) 
Future opening year combined traffic volumes (site traffic plus future background roadway traffic). Opening year is the projected year of opening for the proposed development or change in use.
(2) 
Future design year, or years with phasing, combined traffic volumes (site traffic plus future roadway traffic). Design year is projected to five years beyond the expected opening year of the development or change in use.
(3) 
Background traffic growth rates for study roadways shall be obtained by the Southwestern Pennsylvania Commission (SPC) and confirmed by the Township Traffic Engineer prior to use. These growth rates shall be consistent with the analysis performed for the Comprehensive Plan and any subsequent updates/revisions to the Comprehensive Plan.
(4) 
Intersection levels of service (LOS).
(5) 
A structural pavement analysis of roadways which are projected to experience significant increases is ADT volumes off-site.
(6) 
Other measures of roadway adequacy; i.e., lane widths, traffic signal warrants, vehicle delay studies, etc.
(7) 
When access is onto a state highway or street, the analysis of future conditions shall be consistent with PennDOT requirements.
E. 
A description of future levels of service (LOS) and their compliance with standards for traffic capacity of streets, intersections and driveways. New streets shall be designed for adequate traffic capacity defined as follows. All references to levels of service (LOS) shall be defined by the Highway Capacity Manual, Special Report 209, current edition, published by the Transportation Research Board. These standards may be waived by the Township if sufficient evidence is provided that criteria cannot be met with reasonable mitigation.
(1) 
Traffic capacity LOS shall be based upon future design year analysis.
(2) 
New or modified (a new approach created) unsignalized intersections or driveways which intersect streets shall be designed for LOS C or better for each traffic movement, unless a modification is recommended by the Township Traffic Engineer and approved by the Board of Supervisors pursuant to the requirements of § 22-209 of this chapter (waivers and modifications).
(3) 
New or modified (a new approach created) signalized intersections shall be designed for LOS C or better for each traffic movement, unless a modification is recommended by the Township Traffic Engineer and approved by the Board of Supervisors pursuant to the requirements of § 22-209 of this chapter (waivers and modifications).
(4) 
All existing unsignalized and signalized intersections impacted by development traffic, which do not fall under the criteria of subparagraphs (2) and (3) above, shall operate at LOS D or better for each traffic movement, unless a modification is recommended by the Township Traffic Engineer and approved by the Board of Supervisors pursuant to the requirements of § 22-209 of this chapter (waivers and modifications).
F. 
A description and analysis of the proposed access plan and site plan including:
(1) 
Access plan including analysis of required sight distances using PennDOT criteria and description of access roadway, location, geometric conditions and traffic control.
(2) 
On-site circulation plan showing parking locations and dimension, loading access circulation roadway and traffic control.
G. 
Traffic circulation mitigating action plan shall include:
(1) 
Project features relative to site access and on-site circulation which could be modified to maximize positive impact or minimize negative impact.
(2) 
Off-site improvement plan depicting required street and signal installation and signing improvements to meet the minimum level of service requirements.
4. 
Final Study Report. A final study report must be prepared to document the results of the traffic impact study and the recommended improvements to accommodate the projected traffic due to the proposed subdivision, land development, and/or change in use. Provide an executive summary, which provides a concise description of the study area, result of the traffic analysis and any recommended improvements. The presentation of data and analyses should be accomplished on schematic diagrams of the study area and the use of charts and/or tables. All sources of data and methodologies that were used in the study must be properly referenced and documented. Provide all computer output and calculations in appendices. Provide electronic Portable Document Format (PDF) copies of the report, figures, tables, appendices, as well as electronic versions of the capacity analyses.
5. 
Completion of Traffic Control Devices and Other Traffic Improvements. Whenever, as a result of additional traffic generated by a proposed land development, subdivision, and/or change in use, the traffic impact study determines the need for traffic signal(s), regulatory sign, traffic control device(s), additional traffic lane(s) (including, but not limited to, acceleration, deceleration or turning), and/or other traffic improvements, to be constructed on the applicant's property or on the property abutting the applicant's property, the applicant shall, as a condition of approval, agree to construct the improvements at the applicant's cost, or in lieu thereof, and with the written consent of the Township, reimburse the Township for the cost of the improvements.
[Ord. 657, 4/9/2015]
The infrastructure demand statement shall be submitted to the Township, containing the following information:
A. 
Pre-development Data for Overall Township Demand.
(1) 
Estimated gallons of sanitary sewage created per average day.
(2) 
Estimated gallons of potable water consumed/utilized per average day.
(3) 
Estimated number of school age children.
(4) 
Estimated total residents and/or employees.
B. 
Post-development Data for Overall Township Demand.
(1) 
Estimated gallons of sanitary sewage created per average day.
(2) 
Estimated gallons of potable water consumed/utilized per average day.
(3) 
Estimated number of school age children.
(4) 
Estimated total residents and/or employees.
[Ord. 657, 4/9/2015]
The final plat shall be provided to the Township in an accurate and final form appropriate for recording. The final plat shall clearly delineate the following:
A. 
Accurate boundary lines, with dimensions and bearings.
B. 
Accurate locations of all existing and recorded streets intersecting the boundaries of the tract of land described in the final plat.
C. 
Street names.
D. 
Complete curve data for all curves included in the final plat, including radius, arc length, chord bearing and chord distance. Lines, which join these curves that are nonradial or nontangential, should be so noted.
E. 
Street lines with accurate dimensions in feet and hundredths of feet, with bearings to the nearest one second of street and lot lines.
F. 
Lot numbers, house numbers as provided by the Township and lot dimensions.
G. 
Easements for public improvements and any limitations on such easements.
H. 
Accurate dimensions of any property to be reserved for public, semipublic or community use.
I. 
Location, type and size of all monuments and lot markers in accordance with the standards and requirements of § 22-401 of this chapter and an indication of whether they were found or set or are to be set.
J. 
The name of the subdivision or land development.
K. 
The names and addresses of the developer and, if the developer is not the landowner, the names and addresses of the landowner.
L. 
The north arrow, graphic scale and date.
M. 
Certificates. All certificates shall comply with the requirements of this chapter and Appendix 22-A and shall be in a form acceptable to the Township Engineer and Township Solicitor.
N. 
Final building lines.
O. 
If applicable, a notation on the plat that access to a state highway shall only be authorized by a highway occupancy permit issued by the Pennsylvania Department of Transportation (PennDOT) under § 420 of the State Highway Law, P.L. 1242, No. 428 of June 1, 1945, 36 P.S. § 670.420, the County of Allegheny or other authority which may have jurisdiction over the road, and a permit issued by the Township pursuant to the Driveway Ordinance [Chapter 21, Part 3]. This subsection shall not be construed as relieving an applicant from the requirements of § 22-105 of this chapter.
P. 
Any and all other plans, details, specifications, etc., needed to demonstrate compliance with this chapter and as required by the Township.
[Ord. 657, 4/9/2015]
Construction plans for public improvements prepared by an engineer drawn on sheets measuring 24 by 36 inches, containing the following:
A. 
Conformity with the design standards specified in Part 5, "Design Standards," and the Township Standard Details.
B. 
Plans in profile of each street in the plan and the intersection of each street in the plan for at least 200 feet beyond the limits of the plan. Street profiles shall include complete vertical curve information.
C. 
At least three cross sections at intervals not to exceed 100 feet and extending 50 feet on each side of the street center line or 25 feet outside of the street right-of-way, whichever is greater.
D. 
All drainage easements over private property.
E. 
The location of all necessary sewers, manholes and catch basins.
F. 
The top and invert elevation of each inlet and manhole, together with the grade, size and material of each sewer line.
G. 
The grade line, distance and pipe size of each line in the storm drainage system within the plan and any storm drainage system immediately adjacent thereto.
H. 
All pipe sizes and distances shown by plan and profile.
I. 
The location of each sanitary sewer wye as proposed for installation.
J. 
Areas set aside for underground utilities.
[Ord. 657, 4/9/2015]
A plan to scale and computations, prepared in accordance with the Stormwater Management Ordinance [Chapter 23].
[Ord. 657, 4/9/2015]
A copy of the erosion and sedimentation plan as filed with the Allegheny County Conservation District including a copy of the transmittal letter and evidence of Allegheny County Conservation District approval shall be provided to the Township.
[Ord. 657, 4/9/2015]
The substance of covenants, grants of easements, rights-of-way, or other restrictions that are involved in the proposed subdivision or land development, or are proposed to be imposed upon the use of the land, any common open space, buildings and structures (including proposed easements or grants for public utilities) shall be provided to the Township.
[Ord. 657, 4/9/2015]
For any applications that propose subdivisions and/or land developments that require approvals from the Zoning Hearing Board in accordance with the Zoning Ordinance [Chapter 27], the applicant shall provide written confirmation of the Zoning Hearing Board's approvals.
[Ord. 657, 4/9/2015]
In addition to the proceeding application requirements, the following plans, reports and analyses are recommended for review during a pre-application conference with the Planning Commission. A pre-application conference is voluntary and no plans, reports or analyses are required for review. The following recommendations are intended to minimize costs to a developer and/or landowner prior to making formal commitments as part of the preliminary and final application processes:
A. 
Site Analysis.
(1) 
A site analysis map drawn at a scale of one inch equals 100 feet with notations, containing the following information may be provided to the Township:
(a) 
The site's existing zoning.
(b) 
The site's existing land use(s).
(c) 
Existing zoning for adjacent parcels.
(d) 
Existing land uses for adjacent parcels.
(e) 
Total acreage for the site(s).
(f) 
Existing buildings, paving areas.
(g) 
Significant on- and off-site views.
(h) 
The names and location of soils series as identified by the Soil Survey of Allegheny County.
(i) 
General Vegetative Cover. Provide a brief description of the site's general vegetative cover (meadows, wetlands, wooded, etc.) Show the approximate location of and wooded areas. Show the number, species, size and approximate location of all trees with an eighteen-inch or greater diameter at breast height (dbh).
(j) 
The location of significant natural features, including plant and, wildlife habitat areas for rare or endangered species, wetlands or any other natural features identified in the Allegheny County Natural Heritage Inventory.
(k) 
Potentially hazardous features, including quarry sites, surface and subsurface mines, undermined areas, underground fires, solid waste disposal sites, contaminated areas and landslide-prone areas. Show the approximate location and cite source information.
(l) 
Significant cultural features, including cemeteries, burial sites, archeological sites, historic buildings, structures, plaques, markers or monuments. Show approximate size and cite source information.
(m) 
Existing structures and man-made features. Show approximate location and type. If an existing structure is proposed to be demolished, show clearly on the plans.
(n) 
Existing streets, roads, alleys, driveways or other means of access located on or within 100 feet of the site. Include name, jurisdiction of ownership, with and location of right-of-way and existing grades.
B. 
Proposed Site Development Data and Narrative Summary.
(1) 
Data and a narrative summary may include the following:
(a) 
Quantity of residential dwelling units and/or square footage of nonresidential development.
(b) 
Type of units or buildings.
(c) 
Quantity of parking/loading spaces.
(d) 
Percent building coverage.
(e) 
Total site acreage.
C. 
Sketch Plan.
(1) 
The sketch plan should include the following:
(a) 
Name and address of owner/applicant.
(b) 
Name and address of the professional engineer, surveyor, planner, architect, landscape architect or site designer to be responsible for preparing the plans.
(c) 
Graphic scale.
(d) 
North arrow.
(e) 
Location map.
(f) 
Existing zoning district.
(g) 
Streets on and adjacent to the lot (both existing and proposed).
(h) 
Topographic, physical and cultural features including trees with a diameter of 12 inches or more, slopes greater than 15%, soil types, wetlands, ponds, ditches, drains, existing and proposed right-of-ways and easements, and cultural features such as structures, foundations, walls, wells, trails and abandoned roads.
(i) 
Schematic layout indicating a general concept for proposed land conservation, building development and circulation.
(j) 
Proposed general layout of building locations, parking lots and open space, if applicable.
D. 
Proposed Construction Types and Materials. A narrative or list outlining the general palette of building materials and processes in accordance with the Construction Code [Chapter 5, Part 1] shall be provided to the Township