APPEALS BOARD HEARING FEE
| ||||
Appeal - Building Codes meeting (per issue)
|
$700
| |||
Appeal - Building Codes hearing (per issue)
|
$750
| |||
ZONING PERMITS
| ||||
Decks under 30 inches above ground and without roof
|
$30
| |||
Unattached accessory building under 1,000 square feet
|
$30
| |||
Agricultural building: a building used in the process of producing
food, feed, and fiber by cultivation of certain plants and the raising
of domesticated animals and fiber by cultivation of certain plants
and the raising
|
$30
| |||
Commercial/industrial buildings
|
$100 + 0.01 per square foot
| |||
ZONING HEARING BOARD FEE
| ||||
For variance or special exception (per issue)
|
$750
| |||
DEMOLITION PERMIT
| ||||
Permit will remove building from the tax rolls
|
$15
| |||
DRIVEWAY PERMIT
| ||||
Permit to install: fee includes 1 load of gravel, Township will
|
$125
| |||
JUNKYARD LICENSE - yearly fee
| ||||
Based on actual land used:
| ||||
Less than 15,000 square feet
|
$50
| |||
More than 15,000 square feet but less than 40,000 square feet
|
$100
| |||
More than 40,000 square feet
|
$200
| |||
LARGE PUBLIC GATHERINGS PERMIT
| ||||
Persons reasonably anticipated:
| ||||
500 to 2,000
|
$50
| |||
2,001 to 3,500
|
$100
| |||
3,501 to 5,000
|
$250
| |||
5,001 to 10,000
|
$500
| |||
Over 10,001
|
$2,000
| |||
MOBILE HOME PARK PLAN
|
$50 plus $8 per lot plus engineer fees, if required
| |||
MOBILE HOME PARK PERMIT - yearly fee
| ||||
Park fee
|
$10 plus $1 per lot
| |||
OPEN RECORDS
| ||||
Photocopies (per page, per side)
|
$0.25
| |||
If mailing is requested, the cost of postage will be charged
| ||||
Disk copy (price per disk, using a new disk for each request)
|
$2
| |||
Fax copies (per page)
|
$0.50
| |||
True and correct certification (per page)
|
$3
| |||
Prepayment required if the total fees are estimated to exceed
$100
| ||||
ROAD OPENING PERMIT
|
$70 or PennDOT Schedule
| |||
SIGN PERMIT AND LICENSE
| ||||
Noncommercial/nonindustrial
| ||||
0 to 32 square feet
|
$1 per square foot
| |||
Commercial/industrial
| ||||
Price per square foot
| ||||
1 to 288 square feet
|
$1 per square foot
| |||
Over 288 square feet only by special exception hearing: sign
permit and license fee
|
$1 per square foot + hearing fee
| |||
SUBDIVISION AND LAND DEVELOPMENT
| ||||
Minor subdivision application fee
|
$35
| |||
Major subdivision application fee
|
$70
| |||
Final plat review fee
|
$25 plus $2 for each lot
| |||
Erosion and sediment pollution control plan review
| ||||
Determined by Tioga County Conservation District - fee will
be paid by applicant
| ||||
Stormwater plan review:
| ||||
Engineering fees will be by the hour to be reimbursed to the
Engineer by the developer
| ||||
TRANSIENT RETAIL BUSINESS PERMIT
| ||||
License for 1 month
|
$25
| |||
WEIGHT LIMIT SCHEDULE OF FEES
| ||||
Permits to operate vehicles in excess of 20,000 pounds on Richmond
Township roads:
| ||||
1.
|
Preliminary Inspection Fee: The fee for Richmond Township to
inspect the Township roads prior to any hauling will be $40 for the
first mile and $25 per additional mile, prorated per tenth of a mile.
| |||
2.
|
Administration Fee: The fee for the Richmond Township Secretary
to complete all paperwork necessary to issue a permit to operate vehicles
in excess of 20,000 pounds on Richmond Township roads will be $10
per permit.
| |||
3.
|
Interim Inspection Fee: The fee for Richmond Township to inspect
the Township roads prior to any significant hauling hiatus by the
permittee will be $40 for the first mile and $25 per additional mile,
prorated per tenth of a mile.
| |||
4.
|
Post-Use Inspection Fee: The fee for Richmond Township to inspect
the Township roads once all hauling has been concluded will be $40
for the first mile and $25 per each additional mile, prorated per
tenth of a mile.
| |||
5.
|
Township Engineer Consultation Fees: In the event that the Richmond
Township Board of Supervisors determines that a consultation with
the Township Engineer is necessary to determine the extent of damage
caused by excessive hauling, the permittee is responsible for all
costs associated with said consultation.
| |||
RATES FOR RICHMOND TOWNSHIP EQUIPMENT
| ||||
The following equipment rates will apply when an excess maintenance
agreement provides for repair work to be performed by the posting
authority or its contractor.
| ||||
Equipment
|
Price/Hour
| |||
International 10-wheeler dump truck
|
$90
| |||
Volvo 10-wheeler dump truck
|
$90
| |||
John Deere 772BH grader
|
$170
| |||
Case 580C backhoe
|
$80
| |||
CAT vibratory roller
|
$80
| |||
Water truck
|
$75
| |||
John Deere tractor and stone rake
|
$65
| |||
Fuel surcharge
|
$100 per day
|