[Ord. 90-5, 8/27/1990, § 1; as amended by Ord. 97-7, 10/13/1997, § 18-201]
No wastewater collection, conveyance or treatment facility shall be permitted to be installed, constructed, operated or used to service any residential, agricultural, commercial, industrial or manufacturing structure situate within New Hanover Township until such facility has been registered with the Township on a form to be approved by the Board of Supervisors to include, but not be limited to, identification of the ownership, location, design and projected operational schedule for such facility, all of which must be in accordance with the balance of the regulations, conditions and terms set forth hereinafter, such registration application to be accompanied by an administrative processing fee in an amount to be determined from time to time by resolution of the Board of Supervisors plus the cost of review of all such documents, designs and applications as may be determined necessary by the Township and/or Authority Engineer(s), which costs, expenses and fees shall be borne solely by the applicant and be satisfied in full as a precondition of the issuance of such permit.