A.
Approval required.
(1)
No owner within the Town of Lowell may build, construct, use or place any type or kind of wind energy system in any district without holding the appropriate conditional use permit for said system.
(2)
No wind energy system shall be erected in a primarily agricultural district unless such system is located a minimum of 100 feet from a residential property line.
B.
Separate permit required for each system. A separate conditional use permit shall be required for each system. Said permit shall be applicable solely to the systems, structures, use and property described in the permit.
C.
Basis of approval. The Town Board shall base its determinations on general considerations as to the effect of such grant on the health, general welfare, safety and economic prosperity of the Town and, specifically, of the immediate neighborhood in which such use would be located, including such considerations as the effect on the established character and quality of the area, its physical attractiveness, the movement of traffic, the demand for related services, the possible hazardous, harmful, noxious, offensive or nuisance effect as a result of noise, dust, smoke or odor and such other factors as would be appropriate to carry out the intent of this chapter.
D.
Definitions. All terms defined in § PSC 128.01, Wis. Adm. Code, and the meanings attributed therein are incorporated herein by reference.